Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Design of a Leaching Strategy to Extract Gold from Eleonore Mine Ultrafine Sulphide Concentrate

    By G. Deschênes

    The Eleonore property (James Bay district of Northern Québec), owned by Goldcorp, hosts gold within stockworks of quartz-tourmaline-arsenopyrite veins and veinlets contained within microcline (potassi

    Jan 1, 2013

  • CIM
    Development of an On-line Vibration Based Fault Detection Systems for an Electric Mining Shovel

    By Markus Timusk

    This paper describes a research project that focuses on developing a diagnostic routine to assist in decision support for the condition based maintenance of mobile mining equipment subject to unsteady

    May 1, 2004

  • CIM
    Design, Construction, and Start-up of Stillwater Mining’s East Boulder Concentrator

    By P. Lefebvre, J. Sargent, K. Major, B. Darnton

    "Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin

    Jan 1, 2003

  • CIM
    Mineralogy and pre-concentration of the chromite overburden of the Sukinda Ultramafic Belt, Orissa, India

    By R. B. Rao, B. Das, J. K. Mohanty, D. S. Rao

    Physical, mineralogical and geochemical characterization, along with some beneficiation approach to pre-concentrate the Ni content of the chromite overburden material of the Sukinda Valley, India, hav

    Jan 1, 2000

  • CIM
    A Review of Suncor Energy’s Millennium Extraction Process

    By Michael Godard, Peter Cleyle

    "Suncor Energy’s Project Millennium increased oilsands production capacity by an additional 95,000 barrels per day to its present level of 225,000 barrels per day. This massive venture included an exp

    Jan 1, 2004

  • CIM
    The World Markets of Ferroniobium

    By Claude Dufresne

    The technical development of the niobium-bearing products is to a great extent influenced by the striving of the respective industries to maintain or strengthen their positions in all fields of applic

    May 1, 2003

  • CIM
    Precision and Bias For Settlements

    By Jan W. Merks

    "The settlements between mines and smelters are based on the mass of metal contained in concentrate lots. The mass of contained metal is a function of the wet mass of a lot, and its moisture content a

    Jan 1, 1995

  • CIM
    A Review of Flotation Columns Application in Rougher Circuits

    By M. Massinaei, M. R. Yarahmadi, S. Zeidabadi, M. Oliazadeh

    "Although the majority of new flotation column installations continue to be for cleaning or recleaning, an increasing number of flotation projects are specifying columns for roughing or scavenging dut

    Jan 1, 2011

  • CIM
    Perspectives on the scientific and engineering principles underlying flow of mineral pastes

    By Michael Li, Arie Moerman

    "Paste backfill as a means of supporting underground mining is gaining popularity. Despite this trend, engineering and design of mine paste backfill systems are still largely based on empirical method

    Jan 1, 2002

  • CIM
    Post Start-Up Modifications to the Golden Bear Roaster

    By S. McCalpine, W. Muir, P. J. Downey

    "Golden Bear Operating Company Ltd. (GBOC) was a joint venture between Chevron Minerals Ltd. and North American Metals Corp. that was formed for the development of the Golden Bear Project. The mine is

    Jan 1, 1992

  • CIM
    Evaluation of Level Control System of Cleaner Flotation Columns at Miduk Copper Concentrator

    By M. Massinaei, S. Abasi, M. Oliazadeh

    Reliable measurement and control of the pulp-froth interface (froth depth) in the flotation columns is critical to achieve the desired metallurgical performance. Shallow froths result in a reduction o

    Jan 1, 2019

  • CIM
    Operational Improvements in Seven Mineral Processing Plants by Increasing Grinding Circuit “Classification System Efficiency (CSE)”

    By Robert E. McIvor

    "“Classification System Efficiency (CSE)” is a powerful, emerging tool that can be used to increase grinding circuit efficiency. It is defined as the percentage of the ball mill energy being used to g

    Jan 1, 2013

  • CIM
    A Non-Nuclear Density Meter and Mass Flow System Measuring Mining Slurries with Entrained Gas

    By R. H. Batey

    "The process control and cost of monitoring mining slurries is normally accomplished using a continuous mass flow system, conventionally embodying a volumetric magnetic flow meter and nuclear density

    Jan 1, 2013

  • CIM
    Noranda Minerals Inc. - Geco Division Mill Pressure Filter Project Selection, Installation and Start-Up

    By M. G. Dellow, D. W. Hendriks

    "In early 1988 the decision was made by Noranda Minerals Inc. to install pressure filters at the GECO mill to replace the vacuum disk filters and bunker-C fired rotary kiln dryers. Two filters were in

    Jan 1, 1990

  • CIM
    Chemistry of paste backfill

    By Jacques Ouellet, Ferri Hassani

    "Within the mining industry paste backfill technology has evolved over the last two decades. This technology aims at producing safe and cost effective backfill of high strength. When used as cemented

    Jan 1, 2002

  • CIM
    Development of the Athabaska Oil Sands

    By Max W. Ball

    THE world's largest known oil deposit lies in northern Alberta. In fact, according to government estimates, the famous so-called 'tar sands' of the Athabaska region contain several time

    Jan 1, 1941

  • CIM
    On The Floatability of Gold Grains

    By Stephen L. Chryssoulis, Daniela Venter, Stamen Dimov

    "Comparative surface analysis of floated and rejected free gold grains from a number of full scale benefication plants and from pilot plant testwork, has shown silver (the most common impurity in gold

    Jan 1, 2003

  • CIM
    Environmental Factors Related to the Development of a New Uranium Refinery

    By J. P. Jarrell

    Environmental considerations are of increasing importance in determining the acceptability, schedule and cost of expansion ofCanada's uranium processing industry. Environmental considerations mus

    Jan 1, 1979

  • CIM
    Drum Hoists ? Case Study

    By Gordon F. Scott

    This paper considers a recently completed hoist project for IAMGOLD. Called the Westwood project, this mine utilises some of the largest drum hoists supplied to the North American Market in recent tim

    May 1, 2011

  • CIM
    Design and Implementation of a Brownfield Sag Pre-Crush Circuit

    By G. Castillo, G. Thies, C. Bissue

    "Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond

    Jan 1, 2013