Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    On the Surface Permeability of Indiana Limestone

    By P. A. Selvadurai

    This paper presents the results of a research investigation leading to the development of a technique for the measurement of the surface permeability of Indiana Limestone. The tests are conducted on a

    May 1, 2009

  • CIM
    ILTEC Technology – New Pathways towards Safe and Effective Cooling

    By T. Lux, M. Hanel, Degel, A. Filzwieser, R., H. Joubert

    It is the increasing demand for an economic and cost saving operation mode that requires effective cooling in order to achieve low refractory wear and good furnace lifetime, which is making cooling te

    Jan 1, 2019

  • CIM
    Energy and Cost Comparisons of HPGR Based Circuits with the SABC Circuit Installed at the Huckleberry Mine

    By O. Mejia, J. Drozdiak

    "This paper summarizes a comprehensive energy and cost study comparing an existing SAG mill based circuit at Huckleberry Mine with two proposed circuits involving comminution technologies which are as

    Jan 1, 2013

  • CIM
    The Strength and Flow Performance of Glassfill Technology

    By Euler De Souza

    Backfilling in Canadian mines has been practised for close to 100 years and evidence anticipates the application of mine fill technology at an increasing rate during the foreseeable future. The evolut

    Apr 1, 2005

  • CIM
    Comparison of Penzien and Wang analytical methods with the finite difference numerical method in seismic analyses of the Qazvin-Rasht (Kuhin) tunnel

    By F. Hassani, R. Mikaeil, B. Ferdowsi

    Two analytical solutions for estimating the ovaling deformation and forces in circular tunnels are widely used in engineering practice, due to soil-structure interaction under seismic loading. This pa

    Jan 1, 2008

  • CIM
    Flotation Performance Improvement at Placer Dome Kanowna Belle Gold Mine

    By S. Schwartz, T. Bilney

    "Over recent years a number of techniques have been developed as part of the AMIRA1 P9 project to represent mathematically or measure directly sub-processes occurring in flotation cells. These include

    Jan 1, 2005

  • CIM
    An Investigation in the Stand up Time of Stopesat Birchtree Mine in Thompson, Manitoba

    By Matthew Violot

    Introduction ?Located off highway 6, approximately 5 km, SW of Thompson, Manitoba ?Base metal mine: Nickel? Maximum Depth: 4100 ft ?Started Production in 1966 (INCO, 2006)?Halted in 1978?Re-opened

    Nov 1, 2011

  • CIM
    Influence of Environmental Regulations on the Design of Barrick Goldstrike?s Roaster Off-gas Cleaning Circuit

    By Andy Cole

    Barrick Gold recently implemented an oxygen roasting process to treat carbonaceous ore from its Goldstrike property in Nevada. One of the key project challenges was the design of the roaster gas clean

    May 1, 2002

  • CIM
    Fracture Mechanics Numerical Modeling ? Potential and Examples of Applications in Rock Engineering

    By T. Backers

    In fracture mechanics modeling the rock mass is seen as the combination of rock material and fractures, which are evident on different scales. The activation and propagation of fractures dominates the

    May 1, 2009

  • CIM
    Effluent Treatment Practice at the David Bell Mine

    By A. N. Veltmeyer

    "INTRODUCTIONTeck-Corona Operating Corporation's David Bell Mine is located 35 Km east of Marathon, Ontario. In conjunction with its 1000 tonne per day gold concentrator, the company operates an efflu

    Jan 1, 1989

  • CIM
    The Ausmelt Continuous Copper Converting (C3) Process

    By R. Matusewicz

    The key drivers for the copper smelting industry are a complex mix of economic and "human" factors which combine to drive technology in new directions and can provide a strong indication of future ind

    Jan 1, 2007

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Abstract Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queu

    Oct 1, 2009

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queuing networ

    Oct 1, 2009

  • CIM
    Hydromet Piloting: What the Mineral Processor can expect

    By Ronald Molnar

    "High demand for metals is driving the exploitation of lower grade and more complex orebodies. These projects are often the initiatives of junior mining companies with limited financial resources. In

    Jan 1, 2006

  • CIM
    CO Oxidation Activity and Temperature-Programmed Reduction Study of Au/CuZnOx Catalysts

    By Stephen J. Roberts

    Gold catalysts were prepared on co-precipitated, calcined copper oxide - zinc oxide support by an inverse deposition-precipitation method. These catalysts were characterised by X-ray diffraction (XRD)

    Oct 1, 2003

  • CIM
    Engaging First Nations Communities

    By Glenn K. Nolan

    "Today, more than any other time in recent history, aboriginal communities are looking for ways to be understood as more resource development companies continue to explore and develop Canada's vast re

    Jan 1, 2008

  • CIM
    Carbon Dioxide Use for pH Control at Greens Creek Mill

    By Tim Martin, Dave Tahija

    "In April, 2014, Hecla's Greens Creek mill, near Juneau, Alaska, switched from sulphuric acid to the use of dissolved carbon dioxide for lead flotation circuit pH control. The Greens Creek mine uses p

    Jan 1, 2016

  • CIM
    Backfill Practice at Copper Cliff North Mine (CCNM)

    By Ike Isagon

    Backfilling has become an integral process in underground mining operations, with varying cost-effective forms of application. This study is a part of an overall investigation into the backfill practi

    May 1, 2011

  • CIM
    Au L3-edge XANES Analyses for spr-Au/Al2O3 Catalyst

    By S. Nagamatsu

    Alumina supported gold catalyst prepared by spray reaction method (spr) provides gold particle with about 20 nm of diameter. The gold particle size is larger than conventional gold catalysts. However,

    Oct 1, 2003

  • CIM
    Long-Range Terrestrial Digital Photogrammetry for Discontinuity Characterization at Palabora Open-Pit Mine

    By M. Sturzenegger

    This paper documents a field survey using long-range terrestrial digital photogrammetry at the Palabora open-pit mine, South Africa, for multi-scale characterization of rock mass discontinuities. Ster

    May 1, 2009