Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Sinking No. 3 Elliptical Shaft at North Broken Hill Limited Broken Hill, N.S.W.

    This paper describes the operation involved in the sinking of a concrete-lined elliptical-shaped shaft at North Broken Hill Limited.Major factors such as geological features, future ventilation, ore h

    Jan 1, 1956

  • AUSIMM
    The Central Eyre Iron Project – Process Selection and Design

    By D Connelly

    The Iron Road Limited Central Eyre Iron Project (CEIP) area, located on the Eyre Peninsula of South Australia, covers extensive Archaean iron formations that occur as coarse-grained magnetite bearing

    Jul 11, 2011

  • AUSIMM
    Autogenous Grinding in the Warrego Concentrator of Peko Mines N.L.

    By Stevenson C. H, Lynch A. J

    The reasons for choosing autogenous grinding for the new Warrego concentrator of Peko Mines N.L. are discussed and the ores to be treated in the concentrator are described. The mill was designed on t

    Jan 1, 1974

  • AUSIMM
    Incorporating economic variability into a strategic planning framework

    By E Holloway

    The optimisation of an open pit mine can be broadly split into two stages, the first being the ultimate pit optimisation (and subsequent stage designs), and the second being schedule optimisation. Mac

    Nov 21, 2018

  • AUSIMM
    Optimisation of Hydraulic Filling for Underground Disposal of Tailings in Peru

    By D M R Stone

    Failings di,posal presents many challenges at metal mines in Peru where the extreme relief yields very little useable land area. These challenges are amplified by other hazards such as the high seis

    Jan 1, 1998

  • AUSIMM
    Atomic Force Microscopy ù A New Characterisation Tool for Flotation Research

    By B M. Moudgil

    Atomic force microscopy (AFM) has become an important tool for understanding the nano- to molecular scale mechanisms predominant in multiphase systems. In flotation research, the use of AFM holds pro

    Jan 1, 2005

  • AUSIMM
    Environmental Planning for Mining of Cable Sands' Minninup Deposit, Western Australia

    By Martinick WG

    In July 1986, Cable Sands (W.A.) Pty Ltd commenced mining for mineral sands at Minninup, approximately 16 km south of Bunbury, Western Australia.The area being mined is from the heel of the foredune t

    Jan 1, 1986

  • AUSIMM
    Estimation of rock brittleness for jointed specimens under cyclic triaxial loading

    By P Khalkho, M Singh

    Rock masses when subjected to uniaxial or triaxial cyclic loading (eg in hydraulic running tunnels, during retrieval and injection of oil and gas from storage underground caverns and haulage roads), t

    Nov 29, 2022

  • AUSIMM
    A Variable Split Sample Divider - A New Tool for Sample Preparation

    By R Simonato

    It is now recognised that rotary sample division is by far the best laboratory tool for extracting subsamples from a lot of material. In terms of sampling theory, rotary division, by virtue of the fac

    Jan 1, 2008

  • AUSIMM
    Lead-zinc Ore Mining at the Isa Mine of Mount Isa Mines Limited, Mount Isa, Queensland

    Mount Isa Mines Limited has been mining silver-lead-zinc ore at Isa Mine for 60 years. Mining methods have evolved continuously, and current production rates of 4.7 Mt/yr are obtained from a combinati

    Jan 1, 1993

  • AUSIMM
    Computational Modelling Studies of Ventilation Management for Underground In-seam Drilling Sites

    By F Hungerford, T Ren

    "Gas management has always been a major concern for the ventilation officer of any gassy mine. With an increase of mining depth and gas content, there is a great demand for the development of in-seam

    Aug 31, 2015

  • AUSIMM
    Dewatering Marra Mamba – Lessons Learned

    By K Sommerville

    BHP Billiton’s Area C iron ore operation has been in production since 2003. During 2010, below water table mining in the Marra Mamba formation commenced and dewatered ore has been successfully process

    Jul 11, 2011

  • AUSIMM
    Internalising Environmental Management - Bringing the Environment into Management

    The mining industry was one of the first industry groups to be confronted by and to respond to public and government pressure to improve its environmental management. Companies operating in New Zea

    Jan 1, 1991

  • AUSIMM
    Experience with Capping of Tailings Storage Facilities for Decommissioning Projects in Australia

    By W Ludlow, C Harrington

    This paper presents an overview of the design and construction challenges to implement capping systems on Tailings Storage Facility’s (TSF) based on recent projects in Australia. Key aspects discussed

    Jul 23, 2018

  • AUSIMM
    Development of a visual measurement system of geomaterials under triaxial compression

    By D Asahina, T Endo, H Hosono, T Takemura

    Changes in the stress field around faults due to the excavation of underground space or the extraction of underground resources induce fault reactivation. To understand the mechanism of fault reactiva

    Nov 29, 2022

  • AUSIMM
    In-pit backfilling as part of integrated life-of-mine waste scheduling, closure planning and AMD risk management – Martabe Mine as a case study

    By K Grohs, A Satriawan, S R. Pearce

    Martabe gold and silver mine is operated by PT Agincourt Resources (PTAR) and is situated in northern Sumatra and comprises several deposits in steep terrain, and in a tropical climate, that are requi

    Aug 2, 2023

  • AUSIMM
    Sulfur loss from the slag during desulfurisation of liquid steel

    By S Karosiya, A Sharma, M Jain, N N. Viswanathan, M M. Pande, D Kumar, S Kumar

    Desulfurisation of steel during ladle refining is governed by both thermodynamics and kinetics. For effective desulfurisation, thermodynamically, a low partial pressure of oxygen at the steel-slag int

    Aug 21, 2024

  • AUSIMM
    Effect of SiO2 on the structure and crystallisation of CaF2-CaO-Al2O3 slag used in electroslag remelting

    By S Basu, P M. Midhun

    Electro-Slag Remelting (ESR) is a process capable of producing ingots with much lower centre-line segregation and better internal soundness than conventional ingot casting processes, as well as lower

    Jun 19, 2024

  • AUSIMM
    Advancement in experimental methodologies to produce phase equilibria and thermodynamic data in multicomponent systems

    By E Jak, M Shevchenko, D Shishin

    One of the key aspects to develop sustainable metallurgical production is to ensure that the predictive power of thermodynamic tools is brought up to a new level of accuracy and reliability. Exploring

    Aug 21, 2024

  • AUSIMM
    Unveiling the future of psychosocial hazard management – a multidisciplinary approach

    By N Armitage, C Young

    In the dynamic realm of mining health and safety, addressing psychosocial hazards is crucial. Legislative requirements now demand employers navigate this complex terrain, but uncertainty often clouds

    Apr 16, 2024