Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Commissioning a Large Coal Blending and Preparation PlantThe Curragh coal mining operation was designed and constructed to produce two coals initially at a rate of 4.3Mtpa. These are a high thermal energy steam coal primarily for domestic electricity ge
Jan 1, 1986
-
On equitable distribution of mining wealth and the social licence to operate imperative – an African case studyBy S Roberston, G Batt, R Shanahan, B Shah, A Trench, H Bromfield
The geographic imperative of ore systems leaves mining, more so than virtually any other aspect of modern industry, heavily dependent on obtaining and maintaining social licence to operate. A prospect
Nov 21, 2018
-
Bulk Solids SamplingBy J E. Powalisz
Obtaining a representative sample of bulk materials in process industries is critical to providing valid data for process control and custody transfer (valuation). The accuracy of a sample, that is to
Jul 29, 2014
-
Smoothed Particle Hydrodynamics Modelling of Blast-induced Fracture Processes in Naturally Jointed Rock MediumBy D Deb, R Pramanik
This paper presents a generalised methodology in smoothed particle hydrodynamics (SPH) framework to analyse dynamic failure process of rock mass having natural joint under blast-induced stress wave an
Aug 24, 2015
-
The Structural/Stratigraphic Development of the Sishen South (Welgevonden) Iron Ore Deposit, South Africa, as Deduced From Ground Gravity Data ModellingBy W J. Botha
The Palaeoproterozoic Transvaal Supergroup in the northern Cape Province of South Africa hosts high grade (>60 per cent Fe) hematitic and specularitic iron and manganese mineralisation. The mineralisa
Jan 1, 2005
-
The Negotiated Compressed Process (NCP) (An Alternative Approach to Contracting Practices)By Benson R. P
Building a new tunnel to accommodate CN North America's needs or double stacked container traffic for the next 100 years represents new and unprecedented challenges. Innovative approaches to cont
Jan 1, 1993
-
Olympic Dam mine closure planning processBy G Hill, D Grant, M Tyler
Located approximately 570km NNW of Adelaide in South Australia, the Olympic Dam mine (OD) is the world’s fourth largest remaining copper and gold resource and the largest uranium resource. Discovered
Jul 25, 2018
-
A Fundamental Principle for Automatic Sampler CorrectnessA new concept central to the search for sample correctness is presented. In spite of its simplicity, this concept has already unknowingly formed the implicit basis of already established, current limi
Jan 1, 2005
-
Iron ore mining in proximity to a significant Aboriginal heritage rock shelter, Pilbara Region, Western AustraliaBy J J. Jiang, B G. Bow
Atlas Iron Limited’s (Atlas) Abydos Mine has developed its Scarborough open pit proximal to a rock shelter that has been assessed as a significant Aboriginal heritage site by the Traditional Owners of
Jul 25, 2018
-
Mining Research for Optimum Recovery of Coal ResourcesThe application of new and currently practised mining techniques in new areas and at greater depths necessitates considerable and immediate research effort. This effort is aimed at identifying the
Jan 1, 1981
-
Iron Ore Mining at Yampi Sound: 85-Year History Draws to a CloseThe twin iron ore islands of Cockatoo and Koolan are located in the spectacular setting of Buccaneer Archipelago off the Kimberley coastline of WA.Cessation of ore shipments from Koolan in 1993 ended
Jan 1, 1993
-
Education for the Mineral Industry: The Demand for Professional StaffThe Australasian Institute of Mining and Metallurgy and the Australian Mining Industry Council are concerned that a sufficient number of able young people receive an adequate level of professional
Jan 1, 1981
-
Future Direction for the Use of Victorian Brown CoalThe Victorian State Government recognises that the extensive brown coal deposits in Victoria are one of the State's key competitive strengths for economic development. The unique properties of
Jan 1, 1989
-
Commercial Equipment Designed to Recover Gold from Gravitational Concentrates by Means of Magnetic Separation and the Separation in Magnetic FluidsBy Krokhmai VS, Sayko OP
The paper summarises the theoretical and experimental studies which led to the development of new industrial equipment designed to recover liberated gold from placer gravity concentrates. The new te
Jan 1, 1993
-
Geology - Paper No. 9 The Reassessment Of Older Mining Fields In N.S.W. Non - MetallicsThe non-metallic minerals, excluding the construc- tions and fuel materials have for long been the "poor relations" of the Mining Industry of New South Wales. The State is self-sufficient in only a
Jan 1, 1969
-
Is Extractive Metallurgy a Branch of Chemical Engineering?Courses in chemical engineering and metallurgical engineering at the University of Queensland were compared and the main difference was found to be the greater emphasis on the application of chemi
Jan 1, 1984
-
Geothermometry and Compositional Variation of Fluid Inclusions from the Tennant Creek Gold-Copper Deposits, Northern Territory, Implications for Exploration of Auriferous IronstonesBy Mernagh T, Large R. R, Ryan C. G, Huston D. L
The Tennant Creek goldfield is one of the largest gold producing districts in Australia, and major deposits, including Gecko, Juno, Orlando, Peko, Warrego, Nobles Nob, Golden Forty, Argo, TC 8 and
Jan 1, 1994
-
The Australian Mining Industry Council and its Role in the Mabo DebateThe Australian Mining Industry Council is the peak mining industry representative body in the country. It is wholly funded by its member companies which comprise all of the major Australian mining
Jan 1, 1994
-
Managing Mining ContractsContractors have penetrated all areas of the Australian mining industry over the last 15 years. The process started in the WA gold and nickel mines and has since spread around the nation to iron ore,
Jan 1, 1998
-
An Approach to High Solids Slurry Pipeline DesignBy M Griffiths
This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she
Aug 8, 2011