Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Lihir Gold Five Years On ù Maximising Throughput and Capital Utilisation

    During the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future

    Jan 1, 2003

  • AUSIMM
    Is Perception Reality? Evaluating the Fiscal Attractiveness of International Jurisdictions for Gold Mining Investment

    By J P. Sykes, C Gemell, A Trench

    The perceived and actual impact of government mineral policy upon the government share from gold mining revenues is assessed for ten key countries in which the gold sector is of relevance in advancing

    Jun 22, 2016

  • AUSIMM
    Mathematical Approach for Better Mine Waste Rock Dumping Management

    By Y Li, D J. Williams, E Topal

    A mine waste rock dump does not have any intrinsic value, yet is an inevitable structure in surface mining operations. Since the purpose of mining is to maximise profit, possible expenditure reduction

    Jul 10, 2012

  • AUSIMM
    A theoretical goaf resistance model based on goaf gas drainage data

    By Y Wang

    Inadequate goaf gas control may lead to gas exceedances in the ventilation return air, which will trip power in longwalls and cause production stoppage. To effectively control gas emissions, Australia

    Oct 12, 2022

  • AUSIMM
    The Floatability Characterisation Test Rig as a Pilot Plant for Flotation Testing ù An OperatorÆs Viewpoint

    By J-P Franzidis, M Esvelt, E V. Manla

    The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant that is able to treat up to 2 tph solids. It consists of a bank of six 130 L WEMCO« Smart

    Jan 1, 2003

  • AUSIMM
    Housing Stress and Location Choices in Bowen Basin Mining Communities - A Case Study of Moranbah

    By S Lockie, G Ivanova, J Rolfe

    One of the consequences of mining expansion in the Bowen Basin region of Central Queensland in Australia has been a substantial increase in demand for housing, with subsequent impacts on housing and r

    Jan 1, 2009

  • AUSIMM
    Dashboards, data sources and a modern data platform

    By D Bruce

    OZ Minerals’ Carrapateena mine is a Sublevel cave mine located in South Australia, approximately 160 km north of the regional centre of Port Augusta. Carrapateena commenced underground development in

    Mar 29, 2023

  • AUSIMM
    Estimating the Rock Mass Strength of Hawkesbury Sandstone

    By R Bertuzzi

    "This paper presents preliminary results of ongoing research being carried out at the University of New South Wales Australia (UNSW) into improved methods for estimating rock mass strength. In this pa

    Nov 5, 2014

  • AUSIMM
    A Black Canvas – Planning a Greenfield Coalmine in New South Wales

    By T W. C Stambolie

    Coalmines, like any other mine, generally involve the classic three-staged approach to mining studies; namely concept, pre-feasibility study (PFS) and feasibility studies (Cusworth, 2012). Subsequent

    Jun 28, 2016

  • AUSIMM
    Never Touch a Running System - Longwall Cutting Sequences and their Potential

    The optimisation and validation of shearer cutting methods is a time consuming engineering task. Many different parameters, of which not all can be controlled, can vary. The easiest solution, to incre

    Dec 6, 2010

  • AUSIMM
    Advancements, innovations and initiatives for optimising the treatment of haul roads

    By H Haghighi

    Haul roads are often permanent unsealed access roads used by heavy haul trucks to transfer minerals. These roads can deteriorate rapidly which results in potholes, deformations and dust. Downer EDI Wo

    Sep 18, 2023

  • AUSIMM
    Technical Note on an Improved Cyclosizing Technique

    The design and operating characteristics of the hydraulic cyclone elutriator were described in detail by Kelsall and McAdam (1963), and the method of operation of the commercially available version, t

    Jan 1, 1974

  • AUSIMM
    An Alternative Circuit for Chalcopyrite-Pyrite Ores with Elevated Pyrite Content in Cu-Au Ore Treatment

    By S Farrokhpay, C Akop

    Copper-gold-pyrite ore types with an elevated pyrite head grade utilise a sequential flotation circuit to recover initially a copper-gold concentrate with a pyrite-gold concentrate being produced from

    Sep 1, 2014

  • AUSIMM
    Mount Isa Mines - 1100 Orebody, 35 Years On

    By S DeKruijff

    The Mount Isa Mines Copper Mine in Mount Isa started producing copper in 1966. The Copper Mine gradually increased production rates to nearly six million tonnes per year. Over the last three years the

    Jan 1, 2000

  • AUSIMM
    Process modelling and high-throughput thermochemical calculations using ChemApp for Python

    By F Tang, Ö K. Büyükuslu, M Baben, S Petersen

    GTT-Technologies’ ChemApp for Python was developed to provide a powerful, easy to use interface to ChemApp for a programming language highly popular with scientists and engineers. It is used, for inst

    Jun 19, 2024

  • AUSIMM
    Style of Veins in Penjom Gold Mine, Malaysia – Implications for Gold Mineralisation and Structural Episodes

    By Z Endut, T F. Ng, G H. Teh, J H Abdul Aziz

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Gold mineralisation at the Penjom gold deposit in the Central Belt of Peninsular Malaysia i

    Mar 18, 2015

  • AUSIMM
    Improving Production Drilling and Blasting in the Kim South Orebody at Agnew Gold Mine

    By T A. Carter

    In 2010 Agnew Gold Mine (AGM) struggled to produce the required tonnages from its stopes. The longhole rises used to create void in stopes were unreliable and often failed to gain the designed rise he

    Mar 24, 2014

  • AUSIMM
    Evaporation and Salt Transport Under Variable Climatic Conditions

    By T Baumgartl, B Richards

    The association of specific plants and plant communities with soils developed over underlying superficial orebodies and mineralisation has been long recognised. It has given rise to the use of plant i

    Jul 10, 2012

  • AUSIMM
    Groundwater Management Guidelines for Mining Industry in Arid Western Australia - Examples from the Pilbara

    By D Abbott

    Mining in Western Australia places significant economic and environmental responsibility on Government and the mining industry. Groundwater abstraction is regulated by the Department of Water. The Dep

    Jan 1, 2009

  • AUSIMM
    Gravity Gold - The Process of Change - ABSTRACT ONLY

    Employing gravity recovery for coarsely liberated gold and sulfide ores has potential to lead to a signifi cant reduction in the energy required for comminution and ultimately can have a significant i

    Aug 1, 2010