Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design of Copper-Cobalt Hydrometallurgical CircuitsCopper-Cobalt hydrometallurgy has seen a resurgence in recent years with the development of projects in Zambia and the DRC. Many of the flow sheets are unique in their use of hydrometallurgical techni
Jan 1, 2008
-
Quantitative Risk Assessment Tools to Assist with Waste Management and Placement GuidelinesBy S Lehane, S Pearce
The characterisation and assessment of waste rock has been the subject of considerable research, and many guidance documents have been published both internationally and within Australia. While these
Jul 27, 2015
-
Transition of the Ernest Henry Mine from Open Pit to an Underground Sublevel CaveBy J B Tucker, A T. McGrath
Situated in north-west Queensland, Australia, the Ernest Henry Mine (EHM) has been producing copper and gold since 1996. Owned and operated by Glencore Xstrata, ore is currently sourced from a newly d
Mar 24, 2014
-
Thickening at Karara – The Role of Test Work and Innovative DesignBy G Hart
As the iron ore/magnetite boom gains momentum, it is particularly important to question established past trends and explore the potential of alternative design options. Traditionally, ‘rule of thumb’
Jul 11, 2011
-
O and C Isotope Study of Bastnäs-type Rare Earth Element Mineralisation, Bergslagen, SwedenBy F Sahlström, E M. Jolis, V R Troll, E Jonsson, K Högdahl, C Harris
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Bastnäs-type magnetite-skarn-hosted rare earth element (REE) mineralisations are locate
Mar 18, 2015
-
Application of Design Concepts and Engineering Controls Necessary to Deliver Well-designed and Rehabilitated LandformsBy T Leidich, M Van Zyl, H Lacy
Mining ‘as usual’, until the most recent decades has resulted in limited landform planning and a general lack of mine waste landform design. Material characterisation, mine planning and dedicated prof
Jul 16, 2014
-
The Ore-Deposits of Captain's Flat, New South WalesThe revival of the mining industry at Captain's Flat after a long period of years of inactivity has attracted attention to the importance of the ore-deposits of that field as potential sources of
Jan 1, 1941
-
Discrete vein modelling – implications of a novel geology driven resource estimation methodology for vein hosted mineral depositsBy J P. van Dijk, M Munro
Discrete vein modelling presents an innovative geology driven 3D modelling method for quantification of vein hosted mineral deposits, with far reaching potential for critical mineral supply and low im
Sep 1, 2024
-
Geological Modelling and Bench Face Survey to Improve Blasting FragmentationBy E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos
Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio
Aug 24, 2015
-
Trajectory Design and Economic Analysis of Asteroid Mining Missions to Asteroid 2014 EK24By S Dorrington, J Olsen, N Kinkaid
Several studies have been conducted on the economic analysis of mining near-Earth asteroids for resources for use in Earth orbit. While these studies use detailed economic figures of merit, they often
Nov 4, 2015
-
Incorporating Sustainability into Mining Plant and Infrastructure DesignBy A Murphy
Mining plants and infrastructure, and the decisions made by their designers, can have large impacts on their environmental and social context, commonly referred to as the site or plant footprint. They
Jul 16, 2014
-
Pike River Coal - Project Management ChallengesThe Pike River Coalfield is located on the West Coast of the South Island of New Zealand near the top of the Paparoa Range approximately 45 km north east of the coastal town of Greymouth. The Pike Riv
Jan 1, 2005
-
In situ dynamic testing of mesh straps and W-strapsBy P Mikula, B Darlington, J Graham, P Young
In underground mines experiencing dynamic events, there is an ever-present challenge to design and maintain a capable ground support system. One key component of ground support systems is surface supp
Nov 29, 2022
-
Planning revegetation for relinquishmentBy S D. Fox, P B. Swart
Statistics showing that mine rehabilitation is falling behind rates of disturbance continue to be reported in the media. Unfortunately, most reported statistics do not account for the large growth-cyc
Jul 25, 2018
-
Coal Seam Gas in New Zealand - Perspective from New Zealand's Most Active CSG ExplorersBy S Hayton
While coal seam gas is considered to be an unconventional gas, the proliferation of areas under exploration and development mean that it is rapidly becoming main stream. The potential of New Zealand&a
Jan 1, 2003
-
How Much Do We Need to Drill?By C Taylor, E Retz
Sequential Gaussian conditional simulation of wide-spaced exploration data has been completed in order to optimise a drilling grid at Fortescue’s Eliwana deposit. The aim of this drill grid is to impr
Jul 13, 2015
-
Simulation as a Tool for Mine PlanningBy J Greberg
This paper discusses the use of simulation in the mine planning process. A case study on the Newcrest Cadia East project is presented, and the challenges and possibilities for using simulation as a to
Nov 22, 2011
-
Project Management for All Seasons ù Financial Risk Mitigation in a Challenging WorldBy O C. Aitken
Mining project developers are committed to taking on all the challenges and obligations of financial risk management. It is interesting that our current models of project finance have not changed mark
Jan 1, 2004
-
A Stochastic Optimisation Formulation for the Transition from Open Pit to Underground Mining within the Context of a Mining ComplexBy J MacNeil, R Dimitrakopoulos
As open pit mining of a deposit deepens, the cost of extraction may increase up to a threshold where transitioning to mining through underground methods is more profitable. This paper provides an appr
Nov 24, 2014
-
The design and implementation of the Kibali gold mine off-shaft developmentBy T Peters
The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with
Mar 29, 2023