Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Analysis of Stability and Design of Face Support for Cross Passages – Waterview Connection Tunnels, Auckland, New?Zealand

    By M G. Wansbone, R Bhargava

    The inferred ground conditions for the proposed mined cross passages at the northern end of the Waterview Connection tunnels consist of an overburden of alluvial and residual soils, with mixed face ge

    Sep 17, 2014

  • AUSIMM
    Development of an optical sorting algorithm to utilise digital images for the rapid discrimination of target minerals from gangue

    By E J. Y Koh, G J. McLachlan, E Amini, N Beaton

    Preconcentration greatly reduces the ore mass input to the processing plant while upgrading the grade. One of the commonly used methods of preconcentration is optical sorting. These methods rely on op

    Nov 10, 2020

  • AUSIMM
    Ramp Up of the Pasminco Century Concentrator to 500 000 tpa Zinc Metal Production in Concentrate

    By M Spagnolo, M Ashley, D, L Reemeyer

    PasmincoÆs Century Concentrator in North West Queensland commenced operations in November 1999. The nameplate production capacity of 500 000 tpa of zinc metal production in concentrate was achieved in

    Jan 1, 2003

  • AUSIMM
    A Simple Technique for Using High Energy in Blasting

    By S J. Hawke, L A. Dominguez

    In non-ferrous metal mining operations, it is generally necessary to crush and grind the ore to a very fine particle size to effectively liberate the contained mineral from the host rock. Fragmentatio

    Aug 24, 2015

  • AUSIMM
    A Laboratory Study of Gold Recovery from a Low-grade Tailings Dump

    A sample of tailings from a local, low grade (less than 2g/t) tailings dump was investigated for gold recovery. The tailings were very fine, with 90 per cent passing 30¦m and almost 60 per cent pass

    Jan 1, 1991

  • AUSIMM
    Longwall Extraction at South Bulli Colliery

    The Bellambi Coal Company Limited com menced longwall mining at South Bulli Colliery in 1965. At present it operates three long- wall units in two seams. Although results to date have been less succ

    Jan 1, 1976

  • AUSIMM
    A Formal Approach to Economic Analysis of Pit Slope Design

    By Coates D. F, Neil T. J, O&apos

    A proper economic analysis of pit slope design must reflect the trade-off between the benefits and the increased risks of slope fail- ure inherent in steeper slope angles. However, no formal framewo

    Jan 1, 1977

  • AUSIMM
    New Continuous Production System in Block Cave Mining – the Rock Flow System

    By M Frenzel

    At the last MassMin Conference in Sudbury, Caterpillar’s vision of a continuous mining concept for block caving operations was presented on the background of global raw material demand and its continu

    May 9, 2016

  • AUSIMM
    Spatial distribution of major, minor and trace elements in iron ores, using micro-XRF technology

    By N J. Potter, N W. Brand, J M. F Clout

    The increasing demand for iron ore with low concentrations of trace elements, puts increasing pressure on iron ore producers for high-quality material. Understanding the mineralogy, petrography, chemi

    Nov 8, 2021

  • AUSIMM
    A practical guide to sampling in coal preparation plants

    By B W. Atkinson, J Docherty

    An Australian Working Group has been compiling a guide for operators to use in order to improve the efficacy of their routine and non-routine sampling tasks within their coal preparation process. The

    May 9, 2017

  • AUSIMM
    A methodology for assessing stope design modifying factors for the Olympic Dam Mine

    By S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant

    The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order

    Mar 15, 2021

  • AUSIMM
    Goldilocks – value of information for geoscience applied to coal in tactical time horizons

    By D Lucato, B Haase, R Saha, S Limberger-Forte, J Lishman

    Cadia East Mining operations have employed geometallurgical techniques to advance the understanding of the in situ rock hardness variability across existing Panel Caves (PC). Geometallurgy advances th

    Mar 22, 2022

  • AUSIMM
    Improving drill productivity and delivering better geophysical data faster

    By T A. J Hopper, S Mukkisa, K-O Ott, D Palmer

    RIG Technologies has developed new technology that can successfully acquire high quality natural gamma ray (GR) and hole deviations, downhole while drilling, on reverse circulation drills. This techno

    Nov 8, 2021

  • AUSIMM
    Improving fine sulfide mineral recovery in Independence Group’s Jaguar Mine zinc circuit

    By B Lumsden, R Smiles

    Independence Group’s Jaguar Mine treats a polymetallic ore producing a copper concentrate and zinc concentrate. Effective separation of the sulfides requires relatively fine grinding with flotation fe

    Aug 29, 2018

  • AUSIMM
    Review of Analytical Methods for Determining Trace Amounts of Gold in Ores and Process Streams

    The accurate determination of trace level gold in ores, metallurgical samples and process solutions is required because of the value of gold, the efficiency of the cyanide leach process and because

    Jan 1, 1982

  • AUSIMM
    Mechanised, wireless development charging – Orica’s and Epiroc’s Avatel™ charging solution

    By B Taylor

    Although the underground mining environment is arguably safer now than at any time in history, as underground mining operations across the globe increase in-depth, magnitude, and complexity, protectin

    Mar 29, 2023

  • AUSIMM
    The Resource Valuation and Optimisation Model Real Impact from Real Options

    By C Tonkin, S D. Howell, P V. Johnson, J Moriarty, P W. Duck

    This paper presents the scientific framework underpinning the resource valuation and optimisation model (RVOM). The RVOM is a partial differential equation based real options software package, which h

    Sep 26, 2011

  • AUSIMM
    Design and operation of large drum scrubbers

    By G S. Beros, K M. Edwards

    Over the past 20 years drum scrubbers have become a widely adopted technology within iron ore beneficiation plants. Generally, the drum scrubbers in use are considered high-capacity machines capable o

    Sep 18, 2023

  • AUSIMM
    Initiating-Systems for Underground Mass Firings Using Large Diameter Blastholes

    By Rashleigh C

    The selection and application of an effect- ive firing system first require a clear under- standing of the initiating abilities of the com- ponents in such systems. The conditions under which charges

    Jan 1, 1978

  • AUSIMM
    Magnetite-Cu-Au Deposits in Deeply Eroded Magmatic Arcs: Lessons from Proterozoic Terrains (c7b445dd-94d3-4396-a3c1-380507204f09)

    By Adshead ND, Blake KL, Rotherham JF, Rotherham M, De Jong G

    Magnetite deposits with distinctive ¦ actinolite ¦ apatite -bearing gangue and spatially-extensive sodic-calcic wall rock alteration occur in both Proterozoic metamorphic terrains and Mesozoic-Tertia

    Jan 1, 1995