Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Understanding the Kegold ElectrodeBy Wright D. C
The operation of the cyanide-sensitive Mintek/TB1 kegold electrode was studied in the laboratory, with regard to equilibration time and drift, the effects of pH, stirring, salinity, dissolved oxygen
Jan 1, 1996
-
Reaping the First Fruits – Infrared Spectroscopy: the New Standard Tool in BHP Billiton Iron Ore ExplorationBy M Haest, O Dominguez, D Mittrup
With the current focus in the mining industry on reducing costs, while simultaneously improving ore quality, infrared spectroscopy is a tool that can potentially assist companies to meet both challeng
Jul 13, 2015
-
Conservation of Effective Efflux Velocity from a Road Tunnel Ventilation Outlet by Varying the Effective Cross-Sectional AreaBy A Bagis
Road tunnels are an accepted and effective transportation solution in urban areas to mitigate increasing traffic congestion and facilitate improved urban connectivity in a cost effective manner while
Mar 8, 2011
-
Column Flotation at PasmincoÆs South Mine, Broken HillIn late 1987 it was recognised that column flotation might have potential for improving the grade of the zinc concentrate produced at Pasminco's South Mine in Broken Hill. Intermittent test wor
Jan 1, 1991
-
Characterisation of Gravity Amenable Gold Ores – Sample Representivity and Determination MethodsBy S C. Dominy
Gravity amenable gold ores are those that after comminution produce liberated particles, composites and/or carriers that can be recovered by gravity separation means. Recovery depends upon mineralisat
Sep 5, 2011
-
Separation Of Magnetic Minerals By A Linear Motor Device (550d76f3-26bc-4160-b0b2-e11bb8a40ec4)By Grader F. E
A linear motor properly wound can serve as a mechanism for separating paramagnetic sulphide minerals, like pyrrhotite, from other sulphides and associated gangue minerals. The effective- ness of se
Jan 1, 1980
-
The Porphyry Gold Mine, W.A. From Prediction to ProductionThe Porphyry Gold Mine (150km NE of Kalgoorlie) was reopened in November 1983 with production commencing in April 1984. Original reserves quoted for the open pit were 822000 tonnes at 5.2 g/t Au based
Jan 1, 1986
-
A Description of the Treatment of the Copper Impurity in the Lead Ores Smelted at the Sulphide Corporation's Works, Cockle CreekTHE question of dealing with the small quantities of copper found in a great many of the purchased ores became a factor of importance when the Sulphide Corporation decided to refine its own lead bulli
Jan 1, 1920
-
Chirano Gold Mine Expansion – A Case StudyBy S Ellis
In January 2008 Chirano Gold Mines Limited committed to expansion of the Chirano Gold Project from its existing design capacity of 2 Mtpa ROM ore to a new design value of 3.5 Mtpa. In addition to incr
Aug 8, 2011
-
Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning SchedulerBy D R. Seaman, R P. Tooher, B A. Seaman
"Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove
Oct 10, 2016
-
The Exploration History and Geology of the Polymetallic Reward Deposit, Mt Windsor Volcanic Belt, North QueenslandBy Laing W. P, Neill D. M, O&apos
The Reward polymetallic massive sulphide deposit occurs 35 km south of Charters Towers, adjacent to the Highway gold deposit (Fig. 1). It is hosted within rhyolitic lavas and interlayered volcanicl
Jan 1, 1989
-
Mineralisation of the Tom's Gully Gold Deposit, Northern TerritoryBy Mizuta T, Sakurai M
The Pine Creek Inlier produced 12 440 kg of gold in the period from the first gold discovery in the 1860s to the early-1900s. During the 1930s renewed large-scale prospecting took place and gave a
Jan 1, 1994
-
An integrated approach to mine planning – building the integrated planning model at Tropicana gold mineBy M Kent, D Elder, J Woodward, R Edwards, B Catto
At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine
Sep 20, 2017
-
Characterisation of Silver Minerals in Lead-Zinc Flotation Tailings and Their Response to CyanidationBy N Guresin, M Rohde
A lead-zinc flotation tailings sample containing silver from BHP Billiton’s Cannington Mine has been characterised to understand occurrences of silver in the tailings by conventional elemental, X-ray
Sep 1, 2014
-
Pisolitic Limonite Deposits in Northwest AustraliaBy Morgan B. D
Since the mid 1950s, limonite deposits of a new type have been found in the northwest of Western Australia. The deposits consist of extensive fossil valley fillings up to several hundred feet in depth
Jan 1, 1964
-
Ion Exchange in Hydrometallurgy - Secondary Metal Removal or Primary Production Technique?By J D. Illescas, S N. Arnold, D R. Shaw
Ion exchange (IX) as a primary production technique has been applied commercially since the 1950s; its application in the uranium industry continues to be widespread and is utilised to a lesser degree
Oct 29, 2012
-
Application of Lateral Crater Test in Open Pit Blasting Parameters OptimisationBy Y M. Wang, W Z. Liu, L F. Li, X L. Zhang
Based on the blasting crater theory, the equation between k under typical cases and burden line, charge height was obtained by open pit bench blasting analysis model. The model was calculated with min
Aug 24, 2015
-
Chemical Enhancement to Magnetic Separation for Effective Separation of Silicates from Titanium Phases at Finer Particle Size FractionBy S A. Ravishankar
In heavy minerals separation, the titanium and iron oxide phases are separated from silicates in the coarser particle size range (80 - 150 mm) using magnetic and electrostatic separators. With the ong
Oct 5, 2011
-
Recent Process Improvements at Hidden Valley Gold MineBy F Burns, G Peachey
The Hidden Valley process plant has recently undertaken a program to relieve process flow bottlenecks and improve process automation. An environment of cost reduction and restrained capital necessitat
Sep 1, 2014
-
Automated Loading and Hauling Experiences at De Beers Finsch MineBy R Grobler, D Burger, L Alberts
The current climate in the mining industry is allowing mining companies to further broaden their views and investigate technologies to improve the safety, efficiency and cost-effectiveness of their op
Jan 1, 2008