Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Measurement and Prediction of PbO Activities in Industrial Lead Smelting Slags

    Pbo activities have been measured in conventional blast furnace and direct smelting type slags at 1200¦C. Much higher activity coefficients than previously measured have been obtained and attribut

    Jan 1, 1984

  • AUSIMM
    Removal of Phosphorous from Australian Iron Ores

    By C I. Edwards

    Phosphorous is typically present in iron ore either in the mineral apatite, Ca5(PO4)3OH, or associated with the goethitic fraction of the ore. In this paper, we present results that show that phosphor

    Jul 11, 2011

  • AUSIMM
    Waste Processing in the Zinc Industry Using Ausmelt Technology

    By Robbilliard K. R, Floyd J. M

    The problems facing the metallurgical industry from the viewpoint of the range of unacceptable residues, flue dusts and slags currently produced from the electrolytic zinc process, electric arc furn

    Jan 1, 1993

  • AUSIMM
    Improving the Accuracy of Mine Site Water Balances through Improved Estimation of Run-off Volumes

    By A Woodley, N C. Kunz

    A mine site water balance is important for communicating information to interested stakeholders, for reporting on water performance and for anticipating and mitigating water-related risks through wate

    Nov 26, 2013

  • AUSIMM
    Acid Rock Drainage Prediction and Waste Rock Segregation Plan for Ankerite-Containing Mine Waste ù Restigouche Mine Case Study

    By R Carreau

    The results of a detailed acid rock drainage (ARD) prediction program were used to revise the waste rock segregation criteria at the Restigouche open pit mine. Waste rock at the site was predominately

    Jan 1, 2003

  • AUSIMM
    The Effects of Mining on the Geological Equilibrium at Leichhardt Colliery, Blackwater, Queensland

    The paper describes the geology, structure, stress, gas and strata geomechanical properties for Leichhardt Colliery and their reactions to mining.

    Jan 1, 1986

  • AUSIMM
    Flotation Process Diagnostics and Modelling by Coal Grain Analysis

    By B Firth, G OÆBrien, B Jenkins

    In coal flotation, particles of different components of the coal such as maceral groups and mineral matter and their associations have different hydrophobicities and therefore different flotation resp

    Jan 1, 2005

  • AUSIMM
    Optimal Blast Scheduling of Sub-Level Stoping by Dynamic Programming

    By Bhattacherjee A, Makesh S

    Mechanised sub-level stoping is one of the most widely accepted stoping practices followed in base metal mines in India. As a general practice, blast-scheduling of rings in these stopes is done eith

    Jan 1, 1995

  • AUSIMM
    Mining A 100 Million Tonne Orebody Without Subsidence (1eceb353-235c-4b84-8df9-2b3937c9c8f3)

    The major copper orebody at Mount Isa is being extracted at a rate of four million tonnes per year. The method used requires an equivalent rate of back filling with (mainly) cemented fill. There w

    Jan 1, 1980

  • AUSIMM
    Dragline Operations at the Callide Open Cut Coal Mine

    In any strip coal mining operation the aosL important single operating unit is the dragline. Because the capital and operating costs of a dragline are high, it is desirable to operate these machin

    Jan 1, 1978

  • AUSIMM
    The Development of Hilton Mine, 1947-1985

    By Mutton B. K

    Hilton Mine is being developed as an integrated component of the Mount Isa operation, to achieve continuity of silver/lead/zinc production well into the next century. The mine has a chequered hist

    Jan 1, 1986

  • AUSIMM
    General Aspects of Legislative Control and Safety in Tunneling and Allied Operations

    This paper outlines the manner in which legislative control for tunnelling and allied operations has evolved, detailing Victorian experience. It examines the concept of mine managers as it relates

    Jan 1, 1981

  • AUSIMM
    Ore Reserves Estimation For Copper Orebodies At Mount Isa Mines Limited

    Ore Reserves estimation for the two producing copper orebodies at Isa Mine, Mount Isa, Queensland is discussed. The principal estimation techniques used and discussed are first, a computer based in

    Jan 1, 1979

  • AUSIMM
    Efficiency of the Detritor Mills at Zinifex Century Mine

    By D P. Obeng, L Reemeyer, R Holmes

    The Zinifex Century Mine employs a large number of Detritor mills for fine and ultra-fine grinding to liberate silica and sphalerite at 80 per cent passing 7.5 microns before final zinc flotation. A j

    Jan 1, 2007

  • AUSIMM
    Development of Equipment Types at Renison Mine

    By Clarke RG

    Renison Mine was developed as the first all diesel mine in Australia. The foresight of the early planners in committing the Mine to Decline access has paid dividends in the past two decades with R

    Jan 1, 1982

  • AUSIMM
    Slag-metal interfacial reactions in pyrometallurgical processing of industrial wastes for recovery of valuable metals

    By J H. Park, R R. Kim, H S. Park, H J. Kim

    This study focuses on the recovery of valuable metals, specifically silver (Ag) and palladium (Pd), from copper-containing sludge (with copper content less than 20 per cent) generated during PCB proce

    Jun 19, 2024

  • AUSIMM
    Operations of a Small Heap Leach

    The Fosterville goldfield, situated 25 km east of Bendigo, Victoria was at its peak between 1894-1910 with some 47 600 ounces produced (Figure 1). Since that time intermittent mining and tailings r

    Jan 1, 1994

  • AUSIMM
    Material Flow in Acceleration Zone and Throughput of High Pressure Roller Mills

    By Schonert K

    The throughput of a HP-roller mill is determined by the acceleration of the feed material within acceleration zone and introduction into the compression zone. Both processes depend on the internal

    Jan 1, 1993

  • AUSIMM
    Product Monitoring, Grade Control, and Ore: Waste Reconciliation at Bougainville Copper Limited (BCL)

    An effective production control system should maximise recovery of economic material from the resource. To do this, internal waste must be accurately delineated and efficiently removed. Achieving

    Jan 1, 1986

  • AUSIMM
    The Influence of Bed Structure on Fluid Flow and Heat Transfer in Beds of Iron Ore Pellets

    By Newell R

    The situation in which a gas stream flows through a bed of solids is found in many extractive metallurgy operations. Examples include blast furnace smelting, sintering and pellet firing. In such cas

    Jan 1, 1991