Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Dynamic Sediment Simulation to Predict the Variability of Suspended Solids Concentrations over Life-of-Mine for Application to a Risk-based Environmental AssessmentBy M Ind, B Usher
Environmental regulators are increasingly adopting risk-based approaches to protect aquatic ecosystems. The Australian and New Zealand Environment and Conservation Council (ANZECC) and the Agriculture
Jul 16, 2014
-
Improving the Reliability of Stream Diversion Designs in Mine Closure Plans Using a Morphological ToolBy S Tjerry, S Szylkarski, B Willis-Jones, I Dubinski
Achieving relinquishment of mining sites is becoming increasingly difficult, with a study by Byrne (2013) estimating that out of a set of 73 mining and metals sites around the world, less than ten per
Jun 28, 2016
-
Geostatical Production Grade Estimation in Mount Isa's Copper OrebodiesThis paper describes a detailed geostatistical study of producing copper orebodies at Mount Isa Mines Limited in Queensland, Australia. As a result of this work, kriging has been adopted for grade est
Jan 1, 1982
-
Local Scale Estimation of Sublevel Cave Stocks - Is it Possible? A Case Study in Reconciliation of Metal Production, Ridgeway Mine, New South WalesBy T O&apos, Sullivan
Reconciliation of metal production from a sublevel cave (SLC) mining operation is a complicated process. SLC reconciliation is unlike reconciliation for open stope operations, where a tonnage of extra
Jan 1, 2006
-
Re-Invigorating Unloved ProjectsBy D Price
Mining at the Tuckabianna Mining Centre in the Murchison district of Western Australia ceased in 1997, after the production of 550 000 ounces of gold at an average grade of 2.5 g/t from 22 separate op
Aug 22, 2011
-
Belt Conveyor Transport SystemsThe demands of the economy require larger manufacturing facilities using greater quantit- ies of raw materials which must be mined, handl- ed, stockpiled and recovered with efficiency and dependabili
Jan 1, 1976
-
Climate change risks to mine closure – planning for a range of impactsBy N McIntyre, R Trancoso, N Bulovic
Mining is essential for facilitating human development particularly as demand for critical minerals grows. However, over the mine life cycle, the environment is permanently changed. Once mining ceases
Aug 2, 2023
-
Signals of Mine Closure - A Strategic Approach for Retrenchment - A Case Study of Porgera Gold Mine, Papua New GuineaThe issue of retrenchment is a topic of considerable relevance for the Papua New Guinea (PNG) mining, petroleum and gas industries. The unique environments in which Porgera Joint Venture (PJV) and oth
Jan 1, 2009
-
Vice-President's Address Defence of Australia and Relation Thereto of Primary and Secondary IndustriesMr GEPP said: "He proposed at the outset to draw attention to figures dealing with the population of the countries adjacent to Australia for the purpose of comparison with the population of the C
Jan 1, 1923
-
Fluid Pressure, Geomechanical Evolution and Predictive Targeting of the Sunrise Dam Gold Deposit, Western AustraliaBy M J. Nugus, J G. McLellan, T G. Blenkinsop
High fluid pressures and deformation have been instrumental in the formation of high-grade gold lodes at the Archaean granite greenstone 12 Moz Sunrise Dam gold deposit in Western Australia. Historica
Sep 26, 2013
-
High Resolution Soil Geochemistry for Gold Exploration at the Continental, Regional and Prospect ScaleBy P de Caritat, A Davidson, A Mann
Top outlet sediments from the National Geochemical Survey of Australia have been extracted by a partial extraction method for over 50 elements including gold. The partial extraction results from this
Sep 26, 2013
-
Olympic Dam Operations ReviewThe Olympic Dam copper/uranium deposit was discovered in 1975 and subsequently commenced production in 1988 at a rate of 1.5 Mtpa using the sublevel open stoping mining method. In the following five y
Jan 1, 1998
-
Why is Mineralogical Data Essential for Designing a Metallurgical Test Work Program for Process Selection and Design?By L Lorenzen
The selection of samples for metallurgical test work is generally focused on providing geologically representative samples. One of the major problems experienced with metallurgical test work using dri
Sep 5, 2011
-
Use of a Modified Comminution Index to Predict Bond Work Index and SMC A*b at the Antamina Mine, PeruBy T Kojovic, S J. Windle, J Sullivan
"The Geometallurgical Mapping and Mine Modelling (GeM) comminution index (CI) was developed as part of the AMIRA P843 GeMIII project. Drill core geochemistry samples were passed through a Boyd Crusher
Jun 15, 2016
-
One Mile Underground – Mining the N3500 Orebody at Mount Isa MinesBy I Özen, G Chitumbura
A paper identifying anticipated challenges in the extraction of the N3500 Orebody at Glencore Xstrata Copper’s Mount Isa Copper Operations was written in 2007. The paper identified the depth of the de
Mar 24, 2014
-
Conditions and Design Considerations for Maximising Recoverable Gold in Roasting of Refractory Gold OresBy M G. Aylmore, L W. de Klerk
Roasting of refractory gold ores has been a commercial process for many years. Improvements in design of fluidised bed roasting technologies and low capital and operating costs compared with other ref
Sep 26, 2013
-
Nova-Bollinger reconciliation and riskBy C Laming, P M. Hetherington, F A. Pym, M P. Murphy, K E. Crook
Reconciliation is a powerful tool used by mining operations to compare the mass and grade of ore produced with what was estimated before mining. The primary objective of reconciliation is to verify th
Mar 22, 2022
-
Remodelling the Purnama Deposit – An Interpretation Case Study from G-Resources Martabe Project, IndonesiaBy A N. Kusnanto, D Sims, L Henim, S Crispin, J Hertrijana
The high sulfidation Purnama Au-Ag deposit located on the Indonesian island of Sumatra entered production in mid-2012 following a two-year program of construction and development. Discovered in 1997 f
Aug 18, 2014
-
Mineral Resource Modelling and Reconciliation in Ultra Deep Underground Gold MinesBy R C. A Minnitt
The Witwatersrand Supergroup is host to the world’s largest gold deposits. The location, quantity, grade, continuity and other geological characteristics of a Mineral Resource are either known, estima
Aug 22, 2011
-
Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal ReefsBy J J. Laas, A J. S Spearing
Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Vaal
Jan 1, 1998