Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development Of Equipment For Narrow Vein Mining

    Conventional narrow vein mining, utilising hand held methods, is expensive and requires specialised miners who are becoming a rarity. Hand held mining techniques (shrinkage stoping, leading stopin

    Jan 1, 1987

  • AUSIMM
    Rb-Sr and Pb Isotope Data from the Northampton Block, Western Australia

    By Blockley J. G, Laeter J. R

    The history of the Ph-Cu-Zn mineralisation in the orthampton Block of Western Australia has been further investigated. It was hoped that (1) Rh-Sr studies on partially-remelled granulites, wall-rocks

    Jan 1, 1985

  • AUSIMM
    Mining a Narrow Tabular Reef at Depth with Reference to Rock Breaking and Associated Support Systems

    By Rosenblatt M, Gilroy J. A C Cunningham C V B

    Vaal Reefs Exploration and Mining Company Limited operates one of the largest producing gold mines in the world. The annual production of 76 tons of gold from 12 million tons of ore treated is obtai

    Jan 1, 1995

  • AUSIMM
    Preparing Effective Specifications for Occupational Health and Environmental Noise Objectives in Mining Project Design and Delivery

    By C Tickell

    Achieving occupational health and environmental noise objectives is a major consideration in the planning or operational phase of resource development and industrial projects to meet the needs of the

    May 9, 2016

  • AUSIMM
    Developments in Tube Bundle Gas Monitoring

    By M Watkinson

    Tube bundle monitoring systems have come a long way from their first introduction to coal mining in the late 1960s/1970s. Early developments in the United Kingdom (UK) commenced with single gas analys

    Aug 31, 2015

  • AUSIMM
    Summary of Japanese Coal and Gas Outburst Experiences and Measures Taken Against the Problem

    By Higuchi K

    In this paper, the history of Japanese coal and gas outbursts is presented and circumstances and countermeasures at the time cf outbursts are summarized statistically. Then the present meth- ods fo

    Jan 1, 1986

  • AUSIMM
    The Black Mountain Porphyry Copper-Gold Deposit, Baguio District, Philippines

    By P Waters, P Hollings, M Baker, D R. Cooke

    Over the last three million years, porphyry and epithermal mineralisation in the Baguio Mineral District has been driven by calc-alkaline magmatism associated with the subduction of the South China Se

    Jan 1, 2008

  • AUSIMM
    Geology and Nickel Sulphide Mineralization, Honeymoon Well, Western Australia

    By Woodhouse M, Andrews D, Drew G

    The nickel deposits within the Honeymoon Well project area (26¦ 40'S, 120¦ 25'E), located 45 km south of Wiluna, occur in the northern part of the Agnew-Wiluna belt (Figure 1; Hill et at,

    Jan 1, 1996

  • AUSIMM
    An Aspect of Community Development in a City Based on Mining and Metallurgy-The Case of Wollongong

    Wollongong* is Australia's largest single centre of mining and metallurgy. Wollongong's total employment in manufacturing of basic metal products (over 26,500 in 1972/1973) was almost 50

    Jan 1, 1976

  • AUSIMM
    Costerfield – a Narrow Vein Case Study

    By M McCarthy

    Over the last six years Mandalay Resources has increased production rates and improved safety outcomes at its Costerfield mine in Victoria, Australia. This mine is an underground operation utilising n

    Jun 22, 2016

  • AUSIMM
    Recent Improvements to the Gravity Gold Circuit at Marvel Loch

    By A Bird

    Gravity gold circuits have an important part in reducing operating costs and maximising recovery in modern gold plants where coarse gold is present in the ore body. The design and selection of equipme

    Aug 8, 2011

  • AUSIMM
    Evaluation of Exploration Projects

    It is difficult to evaluate exploration properties in a manner that is transparent, repeatable and easily re-calculated to cater for different geological interpretations, but the risk-based assessment

    Jan 1, 2007

  • AUSIMM
    Influence of Cognitive Biases on Project Evaluation

    By S Love, M Anderson, M Boland

    "The high rate of failure of new mine developments to meet feasibility study expectations has been the subject of many fine technical papers. Yet failure rates remain stubbornly high.Similarly, the co

    Mar 8, 2016

  • AUSIMM
    Case Study of Non-Mining Prediction and Control of Acid Rock Drainage ù The Vancouver Island Highway Project

    By W M. Tekano, T S. Coulter, N M. Hutt

    The Vancouver Island Highway Project (VIHP) was a $CAD 1.2 billion expenditure by the Province of British Columbia to improve travel safety and relieve traffic congestion between Victoria and Campbell

    Jan 1, 2003

  • AUSIMM
    Strategies for Mine Planning and Design

    By S Coward, C Xu, P A. Dowd

    "This paper provides an assessment of the current challenges in strategic mine planning and design and suggested approaches for addressing them. The specific challenges covered are: realistic quantif

    Nov 24, 2014

  • AUSIMM
    Elasto-Plastic Finite Element Structural Stability Analysis of Room and Pillar Mine Workings

    By Porter I, Singh RN

    An advanced elasto-plastic finite element model adopting a modified Von Mises yielding criterion was used to simulate progressive failure of the rock strata surrounding a room and pillar mine struc

    Jan 1, 1992

  • AUSIMM
    Grinding Circuit Improvements at Evolution Mining’s Edna May Operation

    By D Atheis, S Williams, A Dance, D Taplin

    "Resurrected from its former life at the Big Bell operation, the grinding circuit at Evolution Mining’s Edna May operation in Western Australia has many a story to tell. The task of optimising a plant

    Sep 1, 2014

  • AUSIMM
    Mitigation of Post-blast Fume in Soft Ground and Wet Conditions

    By S S. Kanchibotla, E J. Sellers, L Julian, A Musunuri

    Fume events in coalmines are typically associated with wet conditions, soft ground and deep holes. An ACARP research project used laboratory and field testing combined with literature reviews, numeric

    Aug 24, 2015

  • AUSIMM
    Dynamic Simulation of Size Reduction Operations from Mine to Mill

    By Pate W. T

    This paper describes the development of a dynamic flowsheet simulator for comminution operations. Object oriented software design allows the handling of multiple ore types, blended into multicompone

    Jan 1, 1998

  • AUSIMM
    The Effect of Drilling and Blasting Performance on Fragmentation in a Quarry and Time for Loading, Secondary Breakage and Crushing

    By J Seccatore, T Marin, M Cardu, G De Tomi, F Galvão, A Rezende, E Melo

    Small-scale mining operations are characterised by a large variety of equipment availability and a high level of operational flexibility. Mine planning is usually scarce or absent in small quarries in

    Aug 24, 2015