Search Documents

  • TMS
    The Characterization of the Intermetallic Fe-Al Layer of Steel-Aluminum Weldings

    By M. Potesser

    One of the main targets in the automotive mass industry and supplying industry is the weight reduction of the vehicle for decrease of the fuel consumption. For that reason combinations of different ki

    Jan 1, 2006

  • SME
    Challenges Of Conveyors In Tunneling

    By Marco Sonnenschein

    As time is costly, engineering companies have developed methods, procedures and mechanical equipment to tunnel faster. But the best excavation method will not be able to cope with the time pressure if

    Jan 1, 2012

  • CIM
    Dense Medium Separation – An Effective and Robust Pre-Concentration Technology

    By Erin Legault Seguin, Mike Rylatt, Curtis Mohns

    "With energy costs increasing and ore grades diminishing, the role of pre-concentration in hard rock mining operations has been gaining greater interest. To maximize energy conservation, the pre-conce

    Jan 1, 2016

  • NIOSH
    IC 7734 Administration Of The Federal Coal-Mine Safety Act, Calendar Year 1954 - Introduction

    By James Westfield

    This report covers the calendar year 1954 and has been prepared and submitted to the Congress of the United States in accordance with the provisions of Sec. 106(a) and Sec. 2l2(c) of the Federal Coal-

    Jan 1, 1956

  • CIM
    Integration of Sensor Technologies at a Bucket Wheel Excavator for Identification of Material Type and Detection of Interface Layers

    By Martin Kesting

    The world wide growth dynamics and the continuously growing demand for energy, results in increasing energy prices. Looking from this point, the efficient exploitation of fossil fuel deposits has beco

    Oct 1, 2009

  • SAIMM
    The Functional Design Of Surface Mine Haul Roads

    The functional design of a pavement relates to the selection of appropriate wearing course materials which optimise the trafficability of a pavement. Trafficability is dictated to a large degree by th

    Jan 1, 2000

  • IOM3
    Extension of mathematical model of a crusher to an impactor

    By M. R. Smith, H. Kanli

    The impact crusher is a popular device for producing crushed aggregates from non-abrasive rocks such as limestones, offering the advantages of high reduction ratios and relatively low installed costs.

    Aug 1, 1995

  • AUSIMM
    Delivering a healthy atmosphere underground in a cost-conscious environment

    By D Reid, J Black

    The adverse health impacts from diesel particulate matter (DPM) exposure are a well-known global concern. The building evidence has triggered underground mining operations to review existing atmospher

    Aug 28, 2017

  • AUSIMM
    The Mineralogical Researches of Gold Ores and Technological Products at Operating Factory in Olympiada Mine (Russia)

    The Mineralogical Researches of Gold Ores and Technological Products at Operating Factory in Olympiada Mine (Russia)

    Sep 13, 2010

  • ISEE
    “Blasting Effects on Water Wells and Pipelines”

    By Rachel Bernau

    Water wells, aquifers, and pipelines rarely incur damage from nearby blast vibrations. Extensive ground vibrations may cause a drop in the water table thereby changing an aquifer’s structure or drying

    Jan 1, 2001

  • NIOSH
    Coal Mine Inertisation By Remote Application

    By M. A. Trevits, I. R. Houlison, A. C. Smith, T. P. Mucho

    Timely and rapid intervention to underground combustion events (fires, explosions, and spontaneous combustion) is the key to the successful control of the mine atmosphere and restoring of a coal mine

  • SAIMM
    Development And Demonstration Of Oxy-Fuel CFB Technology - Synopsis

    By A. Hotta

    Reduction of CO2 emissions is the key driving force behind the development and implementation of new solutions for energy production. One solution is circulating fluidized bed (CFB) combustion technol

    Jan 1, 2012

  • CIM
    Geology and Oxide Mineralization of the Pipestone Lake Anorthosite Complex, Manitoba

    By D. C. Peck, H. D. M. Cameron, N. M. Halden, L. S. Jobin-Bevans

    Abstract-The late Archean Pipestone Lake anorthosite complex (PLAC) is a 0.9 x 17 km sill-like layered intrusion that is part of a suite of coeval megacrystic anorthosite bodies in the Cross Lake regi

    Jan 1, 1997

  • NIOSH
    IC 7008 Verde Antique ? Introduction

    By Oliver Bowles

    Marble is one of tile most beautiful and enduring materials employed in the construction industries. Because of its diverse colors, decorative patterns, and varying textures, it has furnished material

    Jan 1, 1938

  • AUSIMM
    Mine Planning and Risk Management Associated with the Breakthrough of the Telfer Sublevel Cave into the Active Telfer Open Pit

    The Telfer main dome open pit is operated by Newcrest Mining Limited at a current production rate of 50 Mt/a from a pit dimension compromising 2 km strike length, 1 km width and 250 m depth. As part o

    May 1, 2010

  • AUSIMM
    Landslide Stabilisation at the Clyde Power Project: A Major Geotechnical Undertaking

    Construction work on one of the world's largest landslide stabilisation projects is drawing to a close in Central Otago. Begun in mid 1990, major stabilisation work has been carried out on seven

    Jan 1, 1992

  • SAIMM
    Treatment Of Lead And Zinc Slags In Hollow Electrode DC-EAF In Consideration Of Calculated Phase Equilibria And Thermodynamics

    By J. Böhlke, B. Friedrich, E. Hecker

    The legislation for the disposal of heavy metals contaminated substances is still going to be tightened up in the future. The main criteria for the utilization or deposition of these residues are the

  • SME-ICGCM
    Pillar Design Issues For Underground Stone Mines (5c6602ba-4b85-4ec3-ad15-c1c321c1afcd)

    By A. T. Iannacchione

    Underground stone mining represents an emerging sector for the U.S. mining industry. As this expansion takes mines under deeper cover and as more efficient mining methods are utilized, adequate stone

    Jan 1, 1999

  • IIMP
    Sistema de gestión operativa

    By Marco Muñoz

    La mina Porvenir, perteneciente al Grupo Milpo, está ubicada en Cerro de Pasco, destacándose por la corporación de equipos de alta tecnología minera adecuada a sus operaciones. En ese sentido, el pre

    Jul 17, 2000

  • SME-ICGCM
    Mitigating the Effects of High Horizontal Stress on Ground Control in An Underground Stone Mine: A Case History

    By John Ellenberger

    The nature of a stone deposit is rarely defined through exploration and engineering design, but more through the actual experience encountered as the mine develops; hence, issues with ground control a

    Jan 1, 2012