Search Documents

  • CIM
    Research into high density backfill placement methods by the Ontario Division of Inco Limited

    By B. Goard

    "IntroductionCemented backfill has been placed underground in slurry form in Inco Limited's Ontario Division mines since the early 196Os. The slurry was traditionally mixed on surface at between

    Jan 1, 1987

  • SME
    An Analysis Method For Modeling Compensation Of Settlements Due To Tunnel Driving BY Grouting Cement Suspensions

    By Christian Wawrzyniak

    An analysis method for modeling compensation grouting based on the finite element method is presented. By this method the design parameters of compensation grouting, grouting pressure and grouting vol

  • SME
    Support Of The Leipzig City—Tunnel Extension Using A Tie-Back Supported Freeze Wall

    By Helmut Hass, Michael B. Gilbert

    The extension of the commuter railway system (S-Bahn) in Leipzig, Germany willrequire the construction of an underground line crossing the downtown area of thecity to tie the Bavarian Station in the S

    Jan 1, 2007

  • SAIMM
    The challenge of building local capacity to support the development of a sustainable mining industry in emerging mining nations ? Synopsis

    By C. L. Reichardt

    Mining companies are increasingly looking to the developing world for the next generation of mining projects, often in countries that have little or no previous history of large-scale mining. One of t

    Jan 1, 2009

  • AUSIMM
    Study on Flotation of the Low-Grade Magnesite Ore

    Study on Flotation of the Low-Grade Magnesite Ore

    Sep 13, 2010

  • SME-ICGCM
    Practical Consideration In Longwall Support Selection

    By Thomas M. Barczak

    This report examines practical considerations in longwall support selection that have evolved from Bureau of Mines ground control research. The scope of discussion includes trends in support selection

    Jan 1, 1990

  • CIM
    Optimization of open pit short- and long-range production scheduling

    By Charle Pelley, Kosta Fytas, Peter Calder

    "A computer model has been developed which is capable of evaluating alternative production schedules (long- and short range) of an open pit mine once the ultimate pit limits have been defined. The mod

    Jan 1, 1987

  • AUSIMM
    Plant Improvement and Cost Reduction at the Great Boulder Proprietary Gold Mines Limited

    By Harris J. W

    The treatment plant at The Great Boulder Proprietary Gold Mines Limited was designed and erected by Chas. Ruwolt Proprietary Limited in 1934 to mill 12,000 short tons per month. The flow sheet called

    Jan 1, 1955

  • ISEE
    Deformation of An Explosively Driven Flat Metallic Flyer During Projection

    By Seokbin Lim

    In the design of explosives devices, an understanding of the behavior of explosively propelled matter is one of the most important steps in maximize the performance of these devices. For instance, an

    Jan 1, 2010

  • NIOSH
    OFR-125-80 Study Of The Slate Mining Industry Of Vermont/New York

    By W. I. Watson

    The study considered all the institutional, resource reserve, technological, and economic factors relevant to the industry's present and future status, such as markets and marketing techniques, c

    Jan 1, 1980

  • AUSIMM
    The System of Costs Keeping at the Broken Hill Junction North Mine

    By Ross R

    Although mining is an old industry its management is quite a new science, and its complications are now being recognised as demanding expert knowledge in many branches of technical and professional ed

    Jan 1, 1912

  • DFI
    Industry Practice Standards And DFI Practice Guidelines For Structural Slurry Walls - First Edition - Title ? Table Of Contents - Part I Industry Practice Standards - 1. Classification Of Slurry Wall Panels

    There are many ways to classify structural slurry wall elements, but the DFI committee chooses to limit these descriptions to three functional requirements, namely: design function, plan configuration

    Jan 1, 2005

  • NIOSH
    RI 8931 - Deposition of Nickel-Cobalt Alloys by Controlled-Potential Electrolysis

    By J. L. Holman

    The Bureau of Mines is conducting research to improve technology for the recovery of strategic and critical metals, such as cobalt, nickel, and chromium, that are lost in bulk and particulate superall

    Jan 1, 1985

  • NIOSH
    RI 5988 Underground Blasting Accident Involving An Air-Placed Ammonium Nitrate-Fuel Oil Mixture ? Introduction

    By R. W. Van Dolah

    A premature detonation of an explosive charge occurred on January 30, 1961, at a face being prepared for blasting in the underground Jefferson Island Salt Mine, Diamond Crystal Salt Co., Jefferson Isl

    Jan 1, 1962

  • SME
    Monitoring and Evaluation of Ground Movements Above a Deep Longwall Mine in the Eastern United States

    The prediction and control of ground deformations due to underground mining are important considerations in the permitting, planning, and monitoring of coal mining operations. The prediction of mining

    Jan 7, 2020

  • NIOSH
    IC 7300 Milling And Smelting Operations Of The Magma Copper Co., Superior, Ariz. ? Introduction

    By Edward J. Caldwell

    In 1930 the Bureau of Mines published a description3/ f the concentrating process of the Magma Copper Co. as it had been developed to that time and was then employed. The prevent paper revises the des

    Jan 1, 1944

  • AIME
    Extractive Metallurgy Division - Continuous Tapping of a Lead Blast Furnace

    By J. R. Stone, J. T. Roy

    ASARC09s continuous tapper for lead blast furnace is described. Its use throughout the company's plants has resulted in higher production rates, lower labor costs, and better working conditions.

    Jan 1, 1963

  • SAIMM
    Qualitative Analysis Of Fine Coals Obtained From Triboelectrostatic Separation ? Synopsis

    By S. O. Bada

    Coal samples taken from the No. 2 Seam and No. 4 Seam in a South African colliery were tested in a rotary triboelectrostatic separator. The two-stage triboelectrostatic separation results using the -1

    Jan 1, 2012

  • AUSIMM
    Feasibility Studies, EPCM and the Environment ù Case Studies in Integrated Mine Development

    By R Aseervatham

    The fast tracked mine development strategy attempts to blend feasibility studies and engineering/commissioning functions into a streamlined process. In this compressed process, environmental issues ar

    Jan 1, 1999

  • NIOSH
    Evaluation Of Deep-Seated Crib Block Fire Tests

    By M. A. Trevits, J. E. Urosek, A. C. Smith, M. P. Valoski

    The National Institute for Occupational Safety and Health (NIOSH), in partnership with the Mine Safety and Health Administration (MSHA), is conducting research to test, evaluate, improve or modify coa