Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Continuous Monitoring Of Mechanised Breaker Line Supports To Investigate Roof And Pillar Behaviour

    By I. L. Follington

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.1 Colliery, Queensland. This system was designed to

    Jan 1, 1992

  • SME-ICGCM
    Challenges of Mining the First Right-Handed Longwall Panel in a New Reserve Block in Pittsburgh Seam

    By Jun Lu, Greg Hasenfus

    "In this paper, the mining experience and challenges for the first right-handed longwall panel in the Pittsburgh seam are introduced. The longwall headgate T-junction experienced very high face conver

    Jan 1, 2018

  • SME-ICGCM
    Evaluating the Risk of Coal Bursts in Underground Coal Mines

    By Michael Gauna, Christopher Mark

    "Coal bursts involve the sudden, violent ejection of coal or rock into the mine workings. They are almost always accompanied by a loud noise, like an explosion, and ground vibration. Bursts are a part

    Jan 1, 2015

  • SME-ICGCM
    In Situ Stress Measurement and Stress Change Monitoring in a Longwall Mine to Monitor Overburden Caving Behaviour and to Design a Hydraulic Fracture Treatment Program

    By Rob G. Jeffrey, Ken W. Mills, Jesse W. Puller

    "A coal mine in New South Wales is longwall mining 300m wide panels at a depth of 160-180m directly below a 16-20 m thick conglomerate strata. As part of a strategy to use hydraulic fracturing to mana

    Jan 1, 2015

  • SME-ICGCM
    New Developments in the Area of Influence of Longwall Excavations

    By Denise Weber, Jürgen Kateloe, Marku Papst, Laurenz Preusse, Axel Preusse

    "The angle of draw (in Germany, referred to as Limit Angle) plays a significant role in the field of mining subsidence engineering. This applies both to the assessment of the affected area by undergro

    Jan 1, 2015

  • SME-ICGCM
    Load Transfer Distance Measurements at Two Mines in the Western U.S.

    By Mark K. Larson, Douglas R. Tesarik, Heather E. Lawson

    "Load transfer distance (LTD) is simple in concept and usually evident in underground coal mines. Many people in the mining industry recognize LTD as the distance from the panel to where the mine ribs

    Jan 1, 2015

  • SME-ICGCM
    Utilization of the OSI Underground System's Tandem Anchor to Improve the Weak Roof's Stability of Underground Openings

    By Tom Blevins, Roland Walker, Jinsheng Chen

    "The Dywidag-Systems International DSI Tandem Anchor bolt, with an improved expansion shell-washer design, can substantially reduce potential entry roof falls caused by twisted or deformed expansion s

    Jan 1, 2010

  • SME-ICGCM
    Initial Results From Implementing a Laminated Overburden Model Into ARMPS

    By Peng Zhang

    In a recent research effort, a laminated overburden loading model (as implemented in LaModel3.0 was compared with the results of ARMPS 2010, and the laminated overburden model was found to more accura

    Jan 1, 2013

  • SME-ICGCM
    A Liquid Settlement System for Measuring Roof Sag During Development Mining - A Comparison Between Place Change Mining and a Miner?Bolter

    By Andy L. Shaffer

    A novel liquid settlement system (LSS) was installed in advance of mining at a western United States (U.S.) longwall mine to measure total roof sag from the time of cutting to days after mining during

    Jan 1, 2014

  • SME-ICGCM
    Challenges of Room and Pillar Mining at 900 M Depths in the Czech Republic

    By William J. Schloemer

    INTRODUCTION The history of coal mining the Ostrava Region of the Czech Republic goes back nearly 250 years. Both coking coal for steelmaking and thermal coal for the production of energy are mined h

    Jan 1, 2014

  • SME-ICGCM
    Fiber Reinforced Polymer Rockbolts for Ground Control in a Strong Jointed Rock Mass

    By Samrat Mohanty

    The construction of underground hydrocarbon storage caverns in Jurong Island, Singapore, is nearing completion. The facility, located beneath the seabed of Banyan Basin, is comprised of five storage

    Jan 1, 2014

  • SME-ICGCM
    Stability Analysis of Shell Structure Around the Longwall Mining Face Area in Steeply Dipping Seam

    By Yongping Wu

    Taking the longwall mining face area in a steeply dipping seam as the research object, the stability of an asymmetrical rock mass structure is analyzed using shell theory and masonry beam theory. The

    Jan 1, 2013

  • SME-ICGCM
    Longwall Shield Recovery, Using Phenolic Foam Injection for Gob Control As An Alternative to Recovery Mesh

    By James D. Pile

    Following a methane ignition in the active panel of a longwall coal mine, the affected panel was successfully isolated from the rest of the mine. This allowed for the remainder of the mine to return t

    Jan 1, 2013

  • SME-ICGCM
    A Comparison Between ARMPS and the New ARMPS?LAM Programs

    By Peng Zhang

    In previous research, the laminated overburden model from the LaModel program was effectively integrated with Analysis of Retreat Mining Pillar Stability (ARMPS) through ARMPS-like input to create a l

    Jan 1, 2014

  • SME-ICGCM
    Improved Roofbolting Methodologies: Reducing Hydraulic Fracture of Strata

    By David W. Evans

    "Induced hydraulic fracture of strata during roof bolt installation is a potentially prevalent, but masked phenomenon within the underground coal industry. Previously reported resin testing programs (

    Jan 1, 2015

  • SME-ICGCM
    Underground Measurement of Gateroad Stability at the Depth Around 1000m

    By Zbigniew Lubosik, Andrzej Walentek, Stanislaw Prusek, Aleksander Wrana

    "The Carboniferous coal measures, mined across Europe including the major European underground coal mining countries of Poland, UK, Germany, and Czech Republic, suffer from increasing extraction depth

    Jan 1, 2015

  • SME-ICGCM
    Roof Stability Mapping to Forecast Ground Conditions at an Illinois Basin Coal Mine

    By Phil R. Ames, Anil K. Ray, Murali M. Gadde, John A. Rusnak

    "Many factors can be responsible for coal mine roof falls including, mining geometry, stress conditions and local geology. In the Illinois Basin coal mines, roof instability is commonly attributed to

    Jan 1, 2010

  • SME-ICGCM
    Structural Stability of U–Steel Frame and Its Control Technology

    By Xingkai Wang, Wenbing Xie

    "To control the large deformation of soft rock around the roadway subjected to high stress, it is important to improve the stability of support structure, in addition to increasing support strength. I

    Jan 1, 2015

  • SME-ICGCM
    Stability Analyses and Remediation of Two Mined?Out Coal Seams Adjacent to a Building

    By Gennaro G. Marino

    As part of the development of a shopping center in West Virginia, a significant bench had to be cut into a mountainside that was over 700 ft. high. As a result, a steeply stepped, over 400-ft.- high w

    Jan 1, 2013

  • SME-ICGCM
    Analysis of Gateroad Stability at Two Longwall Mines Based on Field Monitoring Results and Numerical Model Analysis

    By David F. Gearhart, Mark Van Dyke, Heather Dougherty, Ted Klemetti, Gabriel S. Esterhuizen

    "Coal mine longwall gateroads are subject to changing loading conditions induced by the advancing longwall face. The ground response and support requirements are closely related to the magnitude and o

    Jan 1, 2018