The Computer Mapping and Assessment of Borehole and Sampling Data for Stable Minerals, Particularly as Applied in Coal MiningBy M. Berjak, D. M. Hawlins, R. B. MacGillivray
SYNOPSIS The paper describes a method of producing iso line plans using a mathematical technique for interpolating between boreholes, and its computer application. The iso line plans are used for ass
-
Update Of Coal Pillar Database For South African Coal MiningBy J. N. Van der Merwe
Following the Coalbrook disaster in 1960, research into coal pillar strength resulted in the adoption of the concept of a safety factor for the design of stable pillars in South African coal mining.
Nov 1, 2013
-
Rapid Deployment Plant (RDP) For Tailings Treatment At Jwaneng MineBy E. Mpoloka
Debswana together with ADP as their design partner have embarked on an RDP project at Jwaneng Mine. The objective of the project is to install a 2 million ton per annum mineral processing plant that w
Jan 1, 2010
-
On-Line Analysis - What has been Done?By Pieter de Waal
The beneficiation equipment under the control of plant metallurgists exploits the differences in the physical properties between valuable and waste mineral components. In many cases, laboratory result
Jan 1, 2014
-
Hydrogeological Properties Of The UG2 Pyroxenite Aquifers Of The Bushveld ComplexBy R. Gebrekristos
It is commonly accepted that three types of aquifers exist in the Bushveld Complex: (a) alluvial aquifers in areas of river courses, (b) weathered bedrock aquifer formed by the in-situ weathering of t
Jan 1, 2012
-
State Of The Art Recovery Plant DesignBy D. M. C. Valbom
The introduction of new diamond sorting technologies as well as additional manufacturers I vendors, has increased the equipment selection and combinations available for recovery flowsheet design. This
Jan 1, 2010
-
A Framework To Simplify The Management Of Throughput And ConstraintsBy A. Cambitsis
We show that the prioritization of business improvement and performance management decisions may be significantly improved by taking into account the systemic effects of changes made in a single proce
Jan 1, 2012
-
Reconciliation along the Mining Value ChainBy A. S. Macfarlane
"SynopsisMetal accounting and reconciliation is an increasingly important governance issue in all mining operations, in that it is required, from a risk management perspective, that the company is in
Jan 1, 2015
-
Blast furnace tapping practice at ArcelorMittal South Africa, Vanderbijlpark WorksBy Z. Halifa, P. G. Geyer
Tapping a blast furnace is necessary not only to deliver the product, but is also essential for the safety of the furnace and workers in the cast-house. This paper will highlight the practices at Arce
Jan 1, 2014
-
The properties and welding of Supraform TM steelBy H. J. de Klerk
The metallurgical phenomena in the design and manufacture of high-strength low-alloy (HSLA) steels are reviewed, and some aspects of the production of Supraform TM (thermo-mechanically processed) stee
Jan 1, 1984
-
SPOTLIGHT on Leaching ColloquiumBy A. K. Haines
Hydrometalurgy, particularly leaching, is a highly topical subject and always generates great interest in the mineral industry. This was evident right from the start of the organization of the SAIMM C
Jan 1, 1988
-
SPOTLIGHT on the Phoenix Programme (f4d9cbbe-d8f4-4475-9102-f11f2b44ac14)By S. Neilson, M. G. Demmer, K. McCarogher
The Phoenix Programme takes the Mining and Mineral Processing Industry into the Science Classroom In the early years of mining, methods were crude, simple, labour-intensive, and very slow. Human
Jan 1, 1989
-
Witbank/Middelburg Branch (73d7011d-2604-42dd-b4f8-0f7d3223e4e5)Proceedings of a General Meeting held at the Witbank Golf Club at 19h30 on 3rd November, 1977 Geomechanics colloquy The 27th Geomechanics Colloquy is to be held on 12th and 13th October, 1978, in the
Jan 1, 1978
-
Does mechanized drilling pay?By P. J. Kinver
The paper presents details of the costs and outputs being achieved by South African mechanized tunneling and stoping drillings. The information was gathered from various hard-rock mining and tunneling
Jan 1, 1990
-
The optimization of raise-connection spacing in gold minesBy D. R. Lawrence
A method for the calculation of the economic optimum spacing of raise connections in 'scattered' mining layouts is described. The method of calculation and the results obtained in a case stu
Jan 1, 1983
-
Rib-pillar mining at Sigma CollieryBy J. J. S. de Beer, F. Hunter, A. F. Neethling
SYNOPSIS The paper describes the rib-pillar extraction method now used at Sigma Colliery in the Orange Free State. In this method, access roadways (with a high safety factor) are developed into a blo
Jan 1, 1991
-
The presinking of Harmony No. 4 shaft by use of the MA TLA headgearBy I. M. W. Preston
A new shaft system was required to replace stope face for the North Section of Harmony Mine and to allow for systematic opening up of the North Eastern Section. Owing to the economic circumstances at
Jan 1, 1983
-
The structural design of large grinding mills, with reference to shell-mounted bearingsBy D. A. Fenton
The structural design of large grinding mills, with reference to shell-mounted bearings by D. A. FENTON*, P. Eng. (Visitor) The paper outlines the advantages of shell-mounted grinding mills over mills
Jan 9, 1976
-
The uneconomic production of gold in South AfricaBy H. L. Monro
The price received for a commodity decreases as the quantity sold increases. all other factors remaining the same. This has been the position with gold since it was demonetized in August 1971. The res
Jan 1, 1984
-
NIM reports (268c2cc4-4057-4a93-837d-6f6241a75193)NIM reports Report no. 1845 The composition and mode of occurrence of gold in Witwatersrand ores and leach residues", Report no. 1861 The determination of some impurities in zirconium metal by instrum