Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Optimising the ramp design in an open pit mine APCOM 2021By I. Kaabachi, F. Meunier, N. Morales
In open pit mining, ore and waste are hauled outside of the excavation area by trucks that move along a system of ramps. The design of these ramps must be carefully addressed because they have to comp
Sep 1, 2021
-
A review of mine land rehabilitation outcomes: Culture, procurement and practiceBy S. J. van Wyk, A. S. H. Haagner
Land rehabilitation transcends the mere establishment of vegetation across disturbed landscapes; it should be conceptualised as a specialised ecological reconstruction process. This process necessitat
Apr 25, 2025
-
Carbothermic reduction of a willemite concentrate for use in the Waelz processBy V. A. Leão, V. S. Coimbra, V. A. A. Oliveira, R. F. M. de Souza, G. M. de Lima
A willemite concentrate consisting mainly of willemite (55.3%) and dolomite (15.6%) was reduced in a tube furnace with charcoal as reductant. The effects of temperature and varying reductant additions
Nov 6, 2023
-
Size effect on shear strength of computer-aided-manufactured jointsBy Y. -H. Chang, Y. -J. Jou, T. -S. Ueng, I. -H. Peng
In order to systematically study the size effect on the shear strength of rock joints, this study used the computer-aided-manufacturing system to reproduce the artificial rock joints for saw-toothed j
Jan 1, 2003
-
Pull tests of long-embedded cableboltsBy T. Aoki, Y. Maeno, R. Kawano, F. Nakahara, Y. Obara, K. Shibata
The mechanical behaviors of fully-grouted long-embedded cablebolts actually used in situ are very non-linear in pull tests and are different from those of short-embedded cablebolts. We have conducted
Jan 1, 2003
-
Predicting open stope performance at an octree resolution using multivariate modelsBy K. Woodward, Y. Potvin, B. McFadyen, M. Grenon
Open stoping has become a popular mining method in hard rock mines, not only due to the safety of the method as a non-entry approach, but also because of the high extraction rate and low costs. At min
Jun 5, 2023
-
A performance comparison between polyurethane and ceramic densifying cyclones, K.C. NaidooBy K. C. Naidoo
There are two main types of densifying cyclones currently available in the market, namely polyeurethane (PU) and ceramic. The PU densifying cyclones are currently used throughout the Grootegeluk compl
Jan 1, 2020
-
Control of Complex Inclusions in High-Strength Ship Plate Steel by Reducing Calcium TreatmentBy J-C. Lv, S. Zhao, F-L. Zhang, T. Yan
"To eliminate nozzle clogging during continuous casting of ship plate steel and reduce the calcium addition required, the composition of CaO-MgOAl2O3 inclusions in the liquid phase region must be cont
Jan 1, 2018
-
Heat Flow Models in Ventilation PlanningBy A. J. Dickson, A. M. Starfield
This paper reviews the progress made to date in the development of computer models of heat and moisture transfer from rock surfaces to the ventilating air in deep-level mines. The application of these
Jan 1, 2014
-
The spillover effect of industrial action on the profitability of platinum mining companiesBy M. L. Pududu, B. Ceki, K. Mohajane
This study was aimed at determining the effects of industrial action on profitability in the South African platinum mining sector. We compared companies where employees engaged in industrial action (a
Dec 13, 2022
-
Maintaining The Benefit - How To Ensure Mine To Mill Continues To Work For You (3ede1d39-fe86-4d8f-8d54-9a9911a85067)Metso Minerals Process Technology Asia-Pacific (MMPT-AP) has been working with many mining companies worldwide performing `Mine to Mill' or Process Integration and Optimisation (PIO) studies. MMP
Jan 1, 2007
-
Cost modelling for dimension stone quarry operationsBy M. Z. Emad, S. Raza, K. Jalil, M. A. Raza, M. U. Khan, S. A. Saki
Dimension stone mining is Increasing because of growing demand from the building and construction industries. Diamond wire saw cutting is a popular dimension stone mining technique around the world. E
Nov 6, 2023
-
A Review Of Backfilling At Black Mountain MineBy P. J. Kinver
This paper deals with the development of backfilling methods and systems at the Broken Hill orebody of Black Mountain Mineral Development Company (Pty) Limited, at Aggeneys in the north-western Cape P
Jan 1, 1988
-
Lean construction: Implementing the Last Planner System on mining projectsBy M. C. Bekker, T. Govindasamy
The potential benefits of implementing the Last Planner System (LPS) on mining infrastructure projects were explored through two case studies in the South African mining industry. The first part of th
Feb 12, 2024
-
Beneficiation study of a steenstrupine ore for rare earth recovery, X. Yang, D. Krebs, N.Heino, A. Kirpala, and Tero KorhonenBy D. Krebs, Tero Korhonen, X. Yang, A. Kirpala, N. Heino
At present, over 85% of the world’s rare earth oxides are produced from the bastnäsite ores, found mainly in China. Meanwhile, the ion adsorption ores are the most important sources for heavy rare ear
Jan 1, 2020
-
Poor Sampling, Grade Distribution, and Financial Outcomes"This study examines the problems faced by open pit mine superintendents who make choices about how to direct their materials, either to the waste dump or to the mill. The paper explores the effects o
Jan 1, 2017
-
Real-time material tracking: Testing the suitability of microdot technology for ore trackingBy F. T. Cawood, M. N. M. Cudjoe
The ability to conduct real-time material tracking in mines has been a long-standing challenge. Technological innovations such as radio frequency identification technology (RFID) have over the years c
Apr 2, 2022
-
Keynote Address: Theoretical, practical and economic difficulties in sampling for trace constituentsMany industries base their decisions on the assaying of tiny analytical sub-samples. The problem is that most of the time several sampling and sub-sampling stages are required before the laboratory pr
Jan 1, 2009
-
Resource Estimation for Deep Tabular Orebodies the Anglogold Ashanti WayBy T. Flitton, R. Peattie
"The extreme depths and consequent expense of drilling and sampling the gold-bearing reefs of the Witwatersrand Basin have resulted in limited data being available for estimation of grade ahead of the
Jan 1, 2016
-
DC Arc Smelting Of Difficult PGM-Containing Feed MaterialsBy I. J. Kotzé, R. T. Jones
Conventional PGM matte smelting requires the presence of a certain quantity of base metal sulphides in order to collect the platinum group metals in a molten sulphidic matte phase in the furnace. Furt
Jan 1, 2004