Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Potential Impact of Blast Layout, Sequence and Detonator Timings on Air Overpressure from Blasting

    By Shazad Hosein, Bill Birch, Catherine Johnson, Toby White, Liam Bermingham

    Air overpressure (AOP) from blasting can give rise to a significant number of blasting complaints from residents living adjacent to blasting operations from mines, quarries or civil engineering projec

    Jan 1, 2018

  • ISEE
    Automation of Drill and Blast - Measurement Techniques to Develop Standard Procedures (a3ef629c-b178-4045-bc88-d04c273fd2c0)

    By Ewan Selers, Gary Cavanough

    Drilling automation technology is well advanced and automated drill rigs are in use at a number of operating mines. This is not the case for the other drill and blast processes due to significant tech

    Jan 1, 2016

  • ISEE
    Comparison of Structure Response to Hard and Soft Rock Blasting

    By C. T. Aimone-Martin, V. L. Rosenhaim

    The response of two structures to blast-induced ground vibrations were evaluated and compared in order to quantify the impact of different blasting operations, hard rock and soft rock blasting, upon t

    Jan 1, 2015

  • ISEE
    Profile, Profile, Profile

    By John Platt, Mark Stephens

    "When blasting is required in critical areas and anticipated shot movement and quick cleanup areessential to the success of the project it is extremely important to use the best technology available t

    Jan 1, 2016

  • ISEE
    A Study of the Impact of Explosive Quality on Blast Performance

    By Alastair Torrance

    The performance of commercial explosives is clearly influenced by the conditions under which they are used. Mining companies are supplied with Technical Data Sheets which provide details about explosi

    Jan 1, 2013

  • ISEE
    Charge Geometry Effects on Pressure Waveforms in a Shock Tube

    By Joshua Hoffman, Braden Lusk, Kyle Perry

    Shock tubes are used to simulate large-scale arena explosions without the use of full-scale arena sites that utilize large quantities of explosives. Instead, small explosive charges can be used to dri

    Jan 1, 2010

  • ISEE
    Technical Challenges of Close Proximity Blasting to an Active Landslide

    By Aaron Nickoli, Brad Clark, Thomas Horan E. I. T.

    The Canal Road Dip Slide is an active landslide located on South Pender Island, British Columbia. The effects of the fall 2021 atmospheric river prompted the British Columbia Ministry of Transportatio

    Jan 26, 2026

  • ISEE
    Development and Blast Applications for Resolution Copper's No. 10 Shaft

    By Tom Goodell, James Cox, Scott Scovira

    Resolution Copper Mining is sinking a 6943 foot (2116 m) deep shaft to access and develop a new panel caving mine with approximately 1.6 billion known tons of porphyry copper resource. This mine will

    Jan 1, 2014

  • ISEE
    Novel Non-Detonable Pumpable Mechanical Sensitizer and System for Emulsion Explosives for Improved Security

    By Piet Halliday, Ellina Kharatyan

    Conventionally, emulsion matrices (unsensitized) need to be sensitized to become detonable explosives. This is done either chemically or mechanically. Both methods have their advantages and disadvanta

    Jan 1, 2015

  • ISEE
    Gas control station for blasting process to fulfil the environmental goals set by the Chilean Ministry of Health.

    By Manuel Gutierrez, Roberto Gomez, Juan Aravena, Johan Gjoevad

    The use of explosives in mining operations is a process that involves the search for an ideal explosive for the type of geological condition of the mineral to be extracted. For the explosives present

    Jan 21, 2025

  • ISEE
    GEM (Geologic Element Motion) Blast Heave Modeling with More Element Shapes and Energy Partitioning

    By Stewart A. Silling, C. Mick Lownds, Dale S. Preece, Ali Bhuiyan

    GEM (Geologic Element Motion) is a Distinct Element Method (DEM) for modeling blast-induced heave. It was developed with a very fast computational algorithm that efficiently treats many different elem

    Feb 6, 2023

  • ISEE
    All In The Timing

    By Sean Paterson

    The purpose of this paper is to demonstrate a method of delaying and loading a shot. Since entering the construction industry, I have learned that cover is needed on a lot of blasts. When in close hav

    Jan 1, 2001

  • ISEE
    Rock Slope Remediation on the Pennsylvania Turnpike Bedford, Pennsylvania

    By Ron Woolf, Corry Goumans

    This paper describes rock slope remediation performed along America’s first Superhighway, the Pennsylvania Turnpike and in particular, the specialized drilling equipment designed and built by Pacific

    Jan 1, 2001

  • ISEE
    Design and Testing of Blast Shields for Different Blasting Applications

    By Eduardo Lozano, Vilem Petr

    The use of explosives bring countless benefits to our everyday lives in areas such as mining, oil and gas exploration, demolition or avalanche control. However, because of the potential destructive po

    Jan 1, 2015

  • ISEE
    Excavation of a Tunnel to Reach a Large Underground Cavern Roof Fall

    By H. S. Venkatesh R. Balachander, G. C. Naveen

    During the construction of a 1020 MW underground hydroelectric project in Bhutan a huge rock fall took place in the Downstream Surge Chamber (DSC) during March 2016. The total quantity of rock in the

    Jan 1, 2019

  • ISEE
    Measurement of Pressure Variances

    By Jason Baird, Philip Mulligan, Caleb Baumgart

    This report details the pressure variances, measured at four pressure sensors placed equidistant from the center of an airburst explosion, as the blast pressure from a single charge expands radially.

    Jan 1, 2014

  • ISEE
    Drilling and Blasting in Hot and Reactive Ground Conditions at Barrick Goldstrike's Meikle Mine

    By D. Scott Scovira, Remi Proulx

    The Meikle Mine is a high grade, underground gold mine utilizing primary-secondary longhole open stoping with delayed backfill to produce 3000 stpd of ore. Hot and reactive ground conditions were enco

    Jan 1, 2000

  • ISEE
    Underground Longhole Blasting near Large-diameter Booster Fans

    By Norm Disley, Kingsley Hortin, Gertjan Bekkers

    As part of the expansion of the Kidd Creek Mine to 2,682 meters (8800 feet) below surface, two largediameter 3000kW (4000HP) booster fans were installed at the 6000 level. Shortly after commissioning

    Jan 1, 2008

  • ISEE
    Inverse Hybrid Method for Determining Pressure Loading on Plates Due To Buried Mines

    By Damien Bretall, William Fourney

    Due to the changing face of warfare there is an ever growing need to protect the underside of combat vehicles from mine blasts. This paper presents a new method to better characterize the pressure pro

    Jan 1, 2009

  • ISEE
    Demolition of Churchill House in Belfast, Ireland

    By Dick Green

    During the recent troubles in Northern Ireland due to terrorist activities, there have been many buildings demolished or damaged by improvised explosives. This article explains about the Demolition of

    Jan 1, 2006