Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Drilled Shaft Design, Testing and Construction in New Jersey Turnpike - Case StudiesBy Abu B. Siddique, Anthony S. Crincoli
"The New Jersey Turnpike Section 2 widening program consisted of widening between Interchange 6 in Mansfield Township, Burlington County and Interchange 9 in East Brunswick Township, Middlesex County.
Jan 1, 2015
-
Parametric Analysis Of Piled Rafts Founded On A Tropical Clay Of BrazilBy Renato P. Cunha
The paper presents the results of a comparative and parametric analysis in which a numerical program developed exclusively for groups of deep foundations under general loading (vertical, horizontal an
Jan 1, 2002
-
Keynote Lecture 2: Dr. Masaaki Terashi The State of Practice in Deep Mixing MethodsBy Masaaki Terashi
The machine for the hybrid method called JACSMAN is ordinarily a dual shaft machine. Each shaft has augers at three different levels and nozzles for jetting at two different levels. The distance betwe
Feb 10, 2003
-
Acceptance Of Timber Piles Based On Equivalent Driving EnergyBy Chu E. Ho
This paper describes a case history involving the use of the Equivalent Driving Energy concept for evaluating timber piles that failed to achieve the termination criterion traditionally based on final
-
Investigation Of Recycled Plastic Piles For Support Of Structures In Expansive Shale EnvironmentsBy Eric Brandner
Expansive soil formations can be found throughout the United States. When subjected to wetting, many of these formations have the potential to swell and exert large uplift forces which can significan
Jan 1, 2009
-
Session 30 "Grouting for Tunnels 2"By Raymond Henn
Yes we have also used some however, again because of the nature of the maintenance window where we have that two hour (at best) window every night and due to the numerous other crews that are wanting
Feb 10, 2003
-
Cased Auger Piles (CAP): An Effective Piling SolutionBy Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for
-
Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)By Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d
Jan 1, 2017
-
Pile Set-Up to Optimize High-Rise Bridge DesignBy Charles Winter
The Ohio Department of Transpor- tation's (ODOT's) $228 million 1-480 Valley View Bridge project was needed to keep traffic flowing on one of the state's busiest freeway segments. Deterioration from a
May 1, 2022
-
Lateral Response of Pole on Engineered Driven Timber Pile Footing at Ararat Windfarm Terminal StationBy Frank Albrecht, Brian McCarthy
"The Ararat Terminal Station (ARTS) is located 190km to the north-west of Melbourne, approximately 1.7km to the north of Elmhurst Township in the Pyrenees region of western Victoria, Australia. The si
Jan 1, 1900
-
An Active Soil Nail Wall Underpinning SolutionBy Jonathan Ernst
The Bruce Museum is an art, science and natural history museum in Green- wich, Connecticut. The museum was originally built as a private residence in 1853, and has undergone several reno- vations, the
Aug 1, 2023
-
New Tacoma Narrows Bridge CaissonsBy R. Bruce Patterson
The New Tacoma Narrows Bridge is a classic suspension bridge founded on concrete caissons. Caisson construction was complicated by the proximity of the existing bridge piers, only sixty feet away. H
Jan 1, 2013
-
New Outfall Bridge Structures At Bonneville Dam - 1. IntroductionBy Lance Helwirg
New high and low double outfall bridge structures for a juvenile fish bypass system have been constructed on the Washington Shore approximately two miles downstream from the Bonneville Dam on the Colu
Jan 1, 2001
-
Broadway Viaduct Design Phase Load Test Program For Post Grouted ShaftsBy Mike Muchard
A design phase load test program was performed at the Broadway Viaduct bridge site to evaluate load carrying capacity and constructability of post grouted drilled shafts. The program included construc
Jan 1, 2009
-
DFI and NDT – Parallel Histories and Mutual BenefitsBy Bernard H. Hertlein
"When the Deep Foundations Institute (DFI) was founded, quality assurance and quality control (QA/QC) of foundation construction was rudimentary. Nondestructive testing (NDT) was a nascent technology,
Jan 1, 2017
-
Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PRBy Filippo Maria Leoni, Wesley Schmutzler
"Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s
Jan 1, 2015
-
Meadowlands Megaproject: 9,000 Piles and CountingBy Ronald D. Boyer
"Early in the design stage of Meadowlands Xanadu, the client’s project director informed me that “after construction, nobody is going to come to Xanadu to see the foundations.” My response was, “Well,
Jan 1, 2009
-
Diaphragm Wall For Deep Basement Provides Efficient Use Of Waterfront Property At Harbor East In BaltimoreBy S. Y. Fantaye
This paper discusses the design, construction and performance of a 30 inch thick diaphragm wall recently constructed in Baltimore, Maryland at Inner Harbor East. The project site is an established ma
Jan 1, 2008
-
Engineering Sustainability"What can we do in ground engineering to reduce damage to the environment, to repair historic pollution, to reduce our demand on basic resources and to reduce the carbon footprint of our industry? Som
Jan 1, 2009
-
Large Diameter Shafts - Youghiogheny Reservoir Bridge (bd308ba5-80e5-464e-8005-1856048b892f)By Paul J. Lewis
Estimation of the axial side shear resistance of drilled shaft rock sockets is directly related to the unconfined compressive strength of the bedrock. Commonly, the mean unconfined compressive strengt
Jan 1, 2013