Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Dynamic Testing of Threadbar used for Rock Reinforcement

    A comprehensive axial test program has been undertaken at the WASM Dynamic Test Facility on the performance of 20mm threadbar. The threadbar tests had a double embedment configuration, with variation

    May 1, 2009

  • CIM
    Investigation into Iron Ore Concentrate Moisture Issues

    By T. Holmes, D. C. Russell, G. Jolly

    "The AMEC Oakville office is involved in the design and construction of an iron ore concentrator located in Liberia. Currently, the site ships Direct Shipped Ore (DSO) to overseas customers. The DSO m

    Jan 1, 2014

  • CIM
    Case Studies on Circuit Design Using Flotation Columns

    By Glenn S. Dobby, Glenn A. Kosick

    "Column flotation circuit engineering has matured to a good level of understanding regarding testing, scale-up and design. Some of the factors important to the process of implementing columns are addr

    Jan 1, 1995

  • CIM
    Design, Construction and Performance of PKC Dams on Northern Terrain

    By James W. Cassie

    The Snap Lake Diamond Project is located approximately 220 km northeast of Yellowknife, NT, Canada at an approximate latitude of 63?35?. The project location is within the zone of continuous permafros

    May 1, 2003

  • CIM
    Rock Mass Classification for Pre-Excavation Support Planning and at-Face Excavation Performance Assessment

    The rock mass classification systems were developed for different functions, including support selection, excavation method selection and the determination of rock mass engineering properties for exca

    May 1, 2009

  • CIM
    The Need to Innovate: Celebrate the Past....Look to the Future

    By Dominic Fragomeni

    "The mineral processing industry has had a long history of innovation that is recognized but not often celebrated. These include significant advances in mineral measurement, testing, comminution, min

    Jan 1, 2017

  • CIM
    Industrial Validation of the Functional Performance Equation – A Breakthrough Tool for Improving Plant Grinding Performance

    By Robert E. McIvor

    The Functional Performance Equation for Ball Milling” was first presented in 1988. It now has been used successfully in more than a dozen mineral processing plants. This powerful, yet simple tool prov

    Jan 1, 2005

  • CIM
    An Overview of the Lithium Carbonate Process Flow Sheet for Concentrates Derived from Hard Rock Lithium Sources

    By Tassos Grammatikopoulos, Gary Pearse, Massoud Aghamirian, Charlotte Forstner, Stephen Mackie

    "SGS Minerals Services (Lakefield, Ontario site) has conducted a number of developmental and pilot programs that examined methods for the beneficiation, extraction and recovery of lithium from a varie

    Jan 1, 2012

  • CIM
    Application of a kinematically admissible velocity field to the analysis of the arching phenomena in backfills

    By F. P. Hassani, H. B. Poorooshasb

    "A kinematically admissible velocity field is applied to study the arching phenomenon in a cohesionless granular backfill placed between two rough vertical inflexible walls. The study is different fro

    Jan 1, 1989

  • CIM
    Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank Mine

    By Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby

    "Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe

    Jan 1, 2017

  • CIM
    Suitability of PEM fuel cells for underground mining vehicles (35a3b3ff-1d4d-456b-a989-2c3e85f551b7)

    By G. Bonnell, W. Lidkea, M. C. Bétournay, E. Edwardson

    "Hydrogen fuel cells are a known technology, having been applied to stationary (e.g equipment, buildings, and power plants) and vehicle applications (e.g transit buses and space shuttles). There is cu

    Jan 1, 2005

  • CIM
    Suitability of PEM fuel cells for underground mining vehicles

    By M. C. Bétournay

    Hydrogen fuel cells are a known technology, having been applied to stationary (e.g. equipment, buildings, and power plants) and vehicle applications (e.g. transit buses and space shuttles). There is c

    May 1, 2005

  • CIM
    Design, Implementation, and Commissioning of the Gibraltar Development Plan 3

    By S. A. H Tyrrell, R. Rotzinger

    "Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G

    Jan 1, 2014

  • CIM
    Modeling and Simulation of SkimAir® Flash Flotation as a Part of Grinding-Flotation Circuit – Case Study in Esperanza, Chile

    By Luis Bernal, Pertti Lamberg

    "SkimAir®, Outotec’s Flash Flotation unit, is placed in the grinding circuit to float the valuable liberated mineral particles from the circulating load of the grinding process while still relatively

    Jan 1, 2009

  • CIM
    Mining Mineral Processing Simultaneous Planning The Work Index Value

    By J. A. Caceres

    Mining planning and mineral processing are almost two unconnected areas. The mining area builds its economical models considering the plant like a constant parameter: a constant throughput, an average

    May 1, 2003

  • CIM
    Post Start-Up Modifications to the Golden Bear Roaster

    By S. McCalpine, W. Muir, P. J. Downey

    "Golden Bear Operating Company Ltd. (GBOC) was a joint venture between Chevron Minerals Ltd. and North American Metals Corp. that was formed for the development of the Golden Bear Project. The mine is

    Jan 1, 1992

  • CIM
    Investigation of Block Geometrical Properties of the Shale-Limestone Chaotic Complex bimrock of The Santa Barbara Open Pit Mine (Italy)

    By N. Coli

    The exhausted Santa Barbara open pit mine (Tuscany, Italy), owned by the main electric power company in Italy (ENEL S.p.A,) extracted lignite as a fuel for the Santa Barbara thermoelectric power plant

    May 1, 2009

  • CIM
    Optimisation of Flotation Pulp Selectivity Utilising Nodal Analysis

    By Kym Runge, Emmy Manlapig

    "The objective of an industrial flotation circuit is to separate valuable minerals from non-valuable minerals utilising differences in their flotation recovery rate. Regrinding and reagent addition ar

    Jan 1, 2004

  • CIM
    Red Lake Gold Mine Autoclave Optimization Project

    By K. K. Murray, D. G. Gelderland

    "The pressure oxidation autoclave at the Goldcorp’s Red Lake Gold Mines (RLGM) was commissioned in 1991. Since commissioning, the circuit has been well maintained and its capacity increased to mechani

    Jan 1, 2017

  • CIM
    Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman Mine

    Vale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51

    May 1, 2009