Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of Computer Graphics in Mine Design

    By Van Barnefield J G

    This paper is based on an evaluation project engaged upon jointly by Mount Isa Mines Limited nnd" IBM Austra]ia Limited. Mount Isa Mines Limited produces most of its copper from large underground o

    Jan 1, 1977

  • AUSIMM
    Future Process And Design Aspects In Iron Ore Pelletizing

    By Hinrichsen H. D, Rathburn D. R, Stieger W

    The present situation in the field of iron ore pelletizing is briefly described with particular view of the Lurgi/Dravo travelling grate process. To meet todays pellet quality requirements with reg

    Jan 1, 1974

  • AUSIMM
    The Structural and Hydrodynamic Framework for Epithermal Exploration (2963b0f0-6ca9-48f5-bafb-06fd586f730b)

    By Etheride MA

    The evolution of economic precious metal and copper-gold deposits in high-level igneous terranes is dependent on very efficient fluid focussing. This is most readily achieved by contemporaneous defor

    Jan 1, 1995

  • AUSIMM
    Childe Harold: A Case Study in the Use of Multiple Bench Grade Control Techniques

    By Stuart M. S, Allen P. B

    The Childe Harold deposit was mined by the Granny Smith Joint Venture (GSJV) from late-March through to early-December 1993. This was a fast-tracked mining project whose history began with an offer

    Jan 1, 1994

  • AUSIMM
    Laboratory Investigation of Performance Characteristics of Self Drilling Bolts

    By Lu T. K

    A new type of rockbolting system, the self drilling rockbolt, has been studied to develop a 'single pass' bolt for use in rockbolt installation in underground engineering. This single pass b

    Jan 1, 1993

  • AUSIMM
    KR process-production of hot metal on the basis of non-coking coal

    By Kepplinger W

    The KR Process is a joint development by VOEST-ALPINE, Austria and its subsidiary company KORF ENGINEERING, Germany. This new technology allows production of hot metal on the basis of non-coking

    Jan 1, 1986

  • AUSIMM
    Recent Shaft Development at Ballarat

    By Zeni J. T

    Gold was mined from quartz bodies at Ballarat East from the 1850s until closure of the last mine in 1917. The average depth of mines was about 350 m.Ballarat Goldfields Limited (BGL) carried out diamo

    Jan 1, 1992

  • AUSIMM
    Three-Dimensional Modelling of Highwall Stability

    This paper describes the application of a three-dimensional finite element modelling tool to help assess the stability of a highwall at a Central Queensland mine following the weakening of its base

    Jan 1, 1995

  • AUSIMM
    Monitoring and Control in the Recirculation of Underground Ventilation Air

    By Walker K, Burton RC

    An outline of the ventilation and refrigeration requirements of deep South African gold mines is presented. This is followed by a brief description of the history of controlled recirculation in mines

    Jan 1, 1985

  • AUSIMM
    Eco-Development and Mining in the 21st Century Near Delhi, India

    By Verma UK

    Mining for sand was active in South Delhi during the last four decades disregarding all norms of safety. The aim of the paper is to highlight what is proposed to be done for mining in Delhi. Apar

    Jan 1, 1986

  • AUSIMM
    Some Aspects of Technological Development in Aluminium Smelting

    The evolution of Hall process alumina reduction technology is des- cribed with particular attention to the pot lines. Future directions of tech- nological change are considered. It is predicted that

    Jan 1, 1982

  • AUSIMM
    Lead-zinc-silver Ore Concentration Practice at the Lead/Zinc Concentrator, Mount Isa Mines Limited, Mount Isa, Queensland

    The LeadtZinc Concentrator at Mount lsa treats all the lead-zinc-silver ore from the Mount Isa Mine and some of the ore from the Hilton Mine. This concentrator was commissioned in June 1966 and total

    Jan 1, 1993

  • AUSIMM
    Analysis of Haul Truck Tyre Costs in a Multiple Pit Surface coal Mine

    By Cox LT

    A short term tyre study of trucks operating in a multiple pit surface coal mine showed significant potential for cost savings. The tyre study, conducted on-site over a three months period covered a

    Jan 1, 1982

  • AUSIMM
    Water Management to Protect Wetland to the North of the Rhenish Lignite District

    By Trumpff H

    Opencast Lignite Mining requires topwall strata of seams to be fully depleted and footwall aquifers sufficiently depressurized. To prevent a spread of the cone of depression into protected wetlands

    Jan 1, 1988

  • AUSIMM
    The Breccia Environment : 50-Year Retrospection

    Recognition is the most important aspect in the use of breccias as an exploration tool. Ore-hosting breccias occur in a wide variety of environ-ments, shapes, compositions and characteristics, but gen

    Jan 1, 1990

  • AUSIMM
    Time Value of Money and Optimal Location of Mining Facilities

    This paper examines the impact of the time value of money on the location of mining facilities, as examplified by a central processing plant serving several mines. Three approaches, the Euclidean-Di

    Jan 1, 1995

  • AUSIMM
    Native Title and Exploration Access - Where Are We Now and Where Are We Going?

    In June 1992, the High Court of Australia recognised native title of the Meriam people over parts of the Mer Island in the Torres Strait as a form of common law. The Court also indicated that native

    Jan 1, 1996

  • AUSIMM
    Alluvial Sapphire Mining in the New England Region of New South Wales (The AuslMM Annual Conference Rotorua New Zealand 1990)

    By DAVID C LAURENCE

    The richer, shallower sapphire deposits of the New England region of New South Wales which have been traditionally mined by the small miner are almost worked out. Larger mining and exploration compani

    Jan 1, 1990

  • AUSIMM
    Subsidence Associated With Mining At Mt. Lyell (cf0f232d-f5b5-4382-b423-238bcf9ce7bd)

    By Callaghan R. P

    Underground production from the low grade copper orebodies at Mount Lyell in recent years has involved surface subsidence of open cut areas. Relevant structural and lithological features of the geo

    Jan 1, 1980

  • AUSIMM
    A Critical Review of Predictive Methods for Estimation of Compressive Strength of Coal Pillars

    By Hossaini SMF

    After reviewing the various approach es,namely, empirical,analytical.observational and numerical, a logical systematic approach is proposed for the estimation of compressive strength of coal pillars.

    Jan 1, 1991