Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Diversion decision making with an integrated approach to design for operations and mine closure

    By M Rafty, A Markham, S Atkinson

    Australia contains some of the most productive mining areas and is characterised by ancient landscapes and highly variable hydrology. Historical mining of iron ore, coal and other minerals has targete

    Jul 25, 2018

  • AUSIMM
    The Value of Geological Human Capital in the Improvement and Maximisation of Ore Deposit Value – The Kalgoorlie Consolidated Gold Mines Experience

    By D Cooke

    In 2010, Kalgoorlie Consolidated Gold Mines (KCGM) was Australia’s largest gold producer, with total annual production of 788 000 ounces. Of the gold produced by KCGM in 2010, 95 per cent was extracte

    Aug 22, 2011

  • AUSIMM
    Can robots break the drill and blast bottleneck in underground roadway development in hard rock?

    By M Berner, N A. Sifferlinger, E Fimbinger

    Today, the advance rate of underground roadway development by drill and blast operation is limited by the need to ventilate the toxic blast fumes after each cycle. In deep mines this usually is only p

    Sep 1, 2024

  • AUSIMM
    Mining at the Redross and Mariners Nickel Mines

    By D Will

    RedrossThe Redross orebody averages 1 m wide, has a strike of 50 - 350 m, dips at 55° and has a basalt footwall and an ultramafic hanging wall. The most successful and innovative aspects of mining Red

    Mar 21, 2011

  • AUSIMM
    Telfer Project Process Plant Design

    By R Dunne, G Lane, S Ha, D Dreisinger

    The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine

    Jan 1, 2003

  • AUSIMM
    Geochemical Signatures of Alteration Mineral Zonation that Surrounds Adularia-sericite Epithermal Orebodies: Lessons from New Zealand and Abroad

    By I Warren, M P. Simpson

    Adularia-sericite epithermal ore deposits have well-documented alteration mineral zonation patterns with distinctive geochemical signatures. Proper use of whole-rock geochemistry can provide useful ve

    Jan 1, 2005

  • AUSIMM
    Starting the Journey – Launching of the Legacy Way Open Face Tunnel Boring Machines in Mixed Face Ground Conditions

    By M Norbert, D O’Connor

    The mainline running tunnels for Legacy Way comprise two tunnel boring machine (TBM) driven tunnels. Both TBM drives commenced at the Launch Portal adjacent the Mt Coot-tha Road. Excessive surface set

    Sep 17, 2014

  • AUSIMM
    Manganese ù From Waste to High-tech Material

    By M D. Urbani

    HiTec Energy Ltd has been conducting research since 1996 into novel process routes for the treatment of low-grade and waste manganese sources for the production of high value and high quality electrol

    Jan 1, 2004

  • AUSIMM
    Conclusions from long-term cover system performance monitoring – a case study

    By R Barritt

    Remedial options for a waste rock dump (WRD) were considered as part of closure planning studies at an active mine in Western Australia. To minimise the impact of any seepage from the landform it was

    Jul 25, 2018

  • AUSIMM
    Eliminating Unidentified Misfires at Xstrata ZincÆs Open Pits Through the Application of Electronic Detonators

    By R Small, S Combrinck, R Lindsay

    Maintaining your competitive edge in the growing Australian mining sector today is an arduous task. With an ever increasing demand to extract more ore, safely, complete visibility throughout the blast

    Sep 18, 2012

  • AUSIMM
    Flotation Data - Now that I've got all these numbers what do I do with them?

    By Grano S. R, Ralston J

    It is the perennial problem most metallurgists face when examining data collected from laboratory float tests and plant surveys - there are more numbers than we know what to do with! The objective o

    Jan 1, 1994

  • AUSIMM
    The Grande Côte Mineral Sands Project

    By M C. Ackland

    The Grande Côte Mineral Sands Deposit (GCMSP) is located on a coastal mobile dune system in Senegal on the west coast of Africa. Senegal is a stable, democratic republic, having gained its independenc

    Oct 5, 2011

  • AUSIMM
    The underdog mechanical alternative for tailings dewatering: the screw press

    By S Whitton, W Wimmler, L Wimmler

    “Given the increasing scrutiny of the mining industry and its relatively poor record with regards to mine tailings management, increased requirements to minimise water usage (often accompanied by very

    Jul 1, 2021

  • AUSIMM
    Excavation of the Lift 2 Crusher Hydroset Chamber and Orepass in Seismically Active Conditions at Northparkes Mines

    By A Weston

    Northparkes Mines is a joint venture between Rio Tinto and the Sumitomo group and is operated by Rio Tinto to produce copper concentrate from ore sourced from open cut and underground. Underground or

    Jan 1, 2005

  • AUSIMM
    Gold-Rich Porphyry Copper Deposits of the Circum-Pacific Region - an Update Overview

    Gold-rich porphyry copper deposits areimportant sources of gold in the circum-Pacific region: 26 major deposits contain >7000 tonnes of gold. The deposits occur in a variety of subduction-related sett

    Jan 1, 1990

  • AUSIMM
    Sampling Aspects of the Use of Bulk Analysers in the Mineral Industry

    By Greenwood-Smith R, Ellis W. K

    A bulk analyser based on the gamma-ray resonance scattering process can be used to give a rapid and accurate measure of the percentage by weight of copper or nickel averaged over a large mass of sa

    Jan 1, 1976

  • AUSIMM
    Effect of Pre-oxidation and Filtration on Cyanidation of Contaminated Gold from a Flotation Concentrate (677149c7-49e9-4819-8439-028f9085926e)

    By Sparrow GJ, Woodcock JT

    A sample of pyrrhotite flotation concentrate pulp assaying 15.3 g/t An, which had been prepared from an old tailing dump, was treated to extract the gold. Examination of the concentrate with an SEM sh

    Jan 1, 1990

  • AUSIMM
    Case Study – Application of RISKGATE to Managing Strata Failure in an Australian Coalmine

    By J Harris, J Turner, P Kirsch

    Coal mining is recognised globally as a hazardous activity, and as a result operates under high levels of regulatory and public scrutiny while managing a workforce operating in a high-risk environment

    Nov 5, 2014

  • AUSIMM
    Effect of Al2O3/SiO2 ratio on structure and properties of mould flux for high-Al steel continuous casting

    By J Zhang, O Ostrovski, C Zhang D Cai, Q Wang

    The conventional CaO-SiO2-based mould fluxes are not suitable for high-Al steel casting because of the strong reaction between silica in the flux and aluminium in the steel strand. In the process of c

    Aug 21, 2024

  • AUSIMM
    A Case Study In Ore Reserve Procedures At Mount Lyell

    By Rowe J

    The case study is based on the largest ore deposit at Mt. Lyell; the Prince Lyell deposit, comprising a regular lensoid mass of dissemina- ted and vein pyrite-chalcopyrite mineralisation. Reserve est

    Jan 1, 1979