Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Saprolites, Structures and Slope Angles - Applying Site-Specific Geotechnical and Mining Knowledge to Achieve the Final DesignBy E C. F Hamman
Sunrise Dam Gold Mine is a large open pit mine 730 km NE of Perth, Western Australia. Contract mining commenced in the open pit in September 1996 in lake clays and saprolites with the first fresh rock
Jan 1, 2007
-
Operational readiness – what is it and how to get it done?By A G. L Pratt
Operational readiness is a commonly used term in mining and many other industry settings. However, translating this term into a coherent scope of work that is practical and meaningful is a challenge f
Mar 29, 2023
-
Mine Water - Optimising for Site and EnvironmentBy P Thompson, B W. Atkinson
Water treatment is not æcore businessÆ for mining companies.Just as mineral ores and coals are unique, each requiring detailed characterisation and pilot-testing to determine their optimum beneficiati
Nov 26, 2013
-
A fundamental investigation on welding flux tunability geared towards high heat input submerged arc welding for shipbuilding applicationsBy H Yuan, H Tian, Y Zhang, Z Wang, C Wang
Submerged arc welding (SAW) is one of the significant metal-joining processes for manufacturing marine vessels, steel pipes, and offshore structures with high deposition rate and engineering reliabili
Aug 21, 2024
-
Evaluation of Absorbents as a Means to Control the Influence of Heavy Metal Ions on the Flotation of a Complex Sulfide OreBy R F. Sandenbergh
Due to environmental considerations, mineral processing plants are increasingly recycling water to decrease the impacts of wastewater on environment and the depletion of fresh water resources. Industr
Jan 1, 2005
-
Structure Response of a Brick Veneer House to Open Pit Coal Mine BlastingBy A B. Richards
A brick veneer house located on a open-pit coal mine lease has been subject to ground vibration levels of up to 222 mm/s, and air vibration levels of up to 145 dBL. The dynamic response of the structu
Jan 1, 2001
-
Enhanced Risk Reduction Using Early Warning Technologies Embedded in Active Explosion Suppression SystemsBy J J. L du Plessis, A Spaeth
The objective of this paper is to demonstrate the efficiency of machine-mounted active explosion suppression systems (AESS). Their proven effectiveness against methane explosions is highlighted, as we
Aug 31, 2015
-
Improving the performance of blind uphole rises at Ernest Henry Mine – a case studyBy T Purvis, Z Liu
Ernest Henry mine (EHM) is an underground sublevel caving mine located in north-west Queensland with a production rate of 6.4 Mt/a. The mine has sublevels spaced with a 25 m vertical interval. The pro
Oct 16, 2017
-
Methodology for Selecting Borehole Samples of Iron Ore for Mineral Processing CharacterisationBy G J. I dos Santos
The risk assessment of mining projects is directly related to the possible failure in estimating, and as estimates are made from sampling results, this activity should be done in a judicious and plann
Jul 11, 2011
-
Pyrite depression at Boliden Tara using F-250 – a biopolymerBy Y Peng, C Burns, Y Mu, R A. Lauten
In both laboratory flotation experiments and from analysing the composition of the lead concentrate at the Boliden Tara lead-zinc mine in Ireland, it has been found that F-250 may replace cyanide as a
Aug 29, 2018
-
The Carbonatite-Hosted Apatite Deposit of Jacupiranga, South- East Brazil û Styles of Mineralisation, Ore Characterisation and Association with Mineral ProcessingThe carbonatite-hosted apatite deposit at the Cajati open pit mine in the Jacupiranga igneous-carbonatite complex is located in south-eastern Brazil. The major styles of apatite mineralisation include
Jan 1, 2008
-
Generating Synthetic Data for Simulation Modelling in Iron OreBy J E. Everett, K Jupp, T J. Howard
Simulation modelling is a practice commonly used in the mining industry to evaluate alternative process designs. Such modelling is typically undertaken as an optimisation study to increase the efficie
Sep 29, 2013
-
Initial Thoughts on Application of the Volume Loss Approach for Estimates of Surface Settlement Due to Tunnelling in Weathered RockBy S Kowalczuk, S V. L Barrett
The potential for adverse surface settlement during tunnelling in soil and rock poses a significant risk to the successful completion of any tunnelling project. Undesirable ground movement may lead to
Sep 17, 2014
-
Use of Paste for Tailings Disposal (b5c201be-4c25-4c8e-a498-2a2e4672d3d4)By Shillabeer J
Paste backfill has been adopted by many underground mines in North America and a growing number elsewhere. Paste offers a number of advantages. This paper suggests wider applications of paste techno
Jan 1, 1998
-
Calibration of post blast gas simulation using mine site readingsBy F C. D Michelin
Blast fumes are a significant health risk to underground workers, containing several dangerous gases such as carbon monoxide (CO), nitrogen oxides (NOx) and ammonia. To ensure safe working conditions,
Oct 12, 2022
-
Multi-phase CFD modelling of spiral concentrator – Prediction of particle segregation and separation performanceBy R M. Yanamandra, M Kumar, S K. Tripathy, N Mangadoddy, P Sudikondala
Spiral concentrators are one of the flowing film gravity concentration devices used to beneficiate coal and mineral ores. The aim of the current study is to understand the particulate flow and separat
Aug 24, 2022
-
Design, Installation, Commissioning and Operation of Fine Grinding Technology at the Kevitsa MineBy B Nielsen, H Lehto, B Musuku
"The demand for fine and ultra-fine grinding associated with the processing of more challenging, finer grained orebodies and the global driver of minimising energy consumption has been an increased fo
Oct 10, 2016
-
Artificial Intelligence (AI)-based predicting influence of technological innovation on stock price of iron ore mining companiesBy P Mugebe, M Yahyaei, M S. Kizil, R Low
This paper seeks to establish an empirical relationship between the impact of mining technological innovation implementation and a company’s market value. The company’s market value is represented by
Sep 1, 2024
-
Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?By G Hancock, A Kemp, I Taylor
The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T
Jul 16, 2014
-
The Separation of Pentlandite from Chalcopyrite, Pyrrhotite and Gangue in Nickel Projects Throughout the WorldBy L Kormos, V Lawson, G Hill, G Marrs
"In sulfide nickel deposits throughout the world, pentlandite and pyrrhotite are commonly found together along with varying amounts of chalcopyrite and platinum group minerals (PGMs). The mafic or ult
Sep 1, 2014