Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Comparison of Acid Production From Pyrite and Jarosite

    By M Berndt

    Four siltite-argillite rock samples were characterised (particle size, chemistry, mineralogy) and subjected to laboratory dissolution testing for 36 to 298 weeks. In two samples sulfur (0.99, 1.69 wt

    Jan 1, 2003

  • AUSIMM
    Effect of horizontal stress on shallow coalmine slopes

    By I Canbulat, A Mcquillan

    This paper presents a parametric analysis showing the impact of virgin in situ stresses on a shallow (less than 100 to 150 m) high slope in a jointed sedimentary rock environment. Slope stability is a

    Nov 29, 2022

  • AUSIMM
    Viscosity measurement of FeO-SiO2 based slags under controlled oxygen partial pressures

    By S-C Shim, H-R Lee, Y Kang, H Shin

    Since iron oxide and silicon oxide are major gangue components in various types of ore, FeO-SiO2 base slag, ie fayalite slag, has been often encountered in pyrometallurgical processes of non-ferrous m

    Jun 19, 2024

  • AUSIMM
    Improving Extraction Efficiency from Witwatersrand Gold Tailings using Flotation and Ultra-Fine Grinding of Concentrates

    By D Capstick, M B. Ebell

    This paper describes the test work, process design, commissioning and operation of a processing system at the Ergo gold operation that improves the extraction efficiency from gold tailings material. T

    Sep 26, 2013

  • AUSIMM
    Development of mine intelligent ventilation technology in western China

    By S G. Li

    Mine intelligent ventilation is an important guarantee to realise intelligent mining. It is the integration of the Internet of Things, big data, artificial intelligence, internet, cloud computing with

    Oct 12, 2022

  • AUSIMM
    Resource Modelling and Mine Design at Obuasi Mine, Ghana

    By C K. Boafo, J Visser

    Obuasi Mine in Ghana, with more than 100 years of mining history, developed from a surface operation into a deep >2000 m underground gold mine. The challenge is to extract value from narrow veins l

    Jan 1, 2008

  • AUSIMM
    The Golden Mile – 125 years of mining and the challenges posed for today’s mine geologist

    By M Watson, A V. Engelbrecht, E Murray-Hayden

    Whereas mine reconciliation is a well-established month-end process for most modern mining operations, the resource sector has yet to endorse uniform reporting factors against which model accuracy and

    Mar 22, 2022

  • AUSIMM
    Parametric study of flotation with acoustic sound

    By B Yang, L Wang, C Y. Ng

    Flotation process intensification is often achieved through changing chemical reagent scheme or flotation machine or both, which likely brings a hefty burden to the flotation plants in terms of capita

    Aug 24, 2022

  • AUSIMM
    Red mud to green iron – proposed pathway for iron elution via bioleaching of bauxite residue

    By A Tolley

    Bauxite residue or ‘red mud’ is a by-product of the Bayer Process, the primary process of alumina refining. Due to its high alkalinity and variable composition, its storage and disposal poses high env

    Sep 18, 2023

  • AUSIMM
    The Palaeoproterozoic Warramunga Formation, Tennant Creek Block, Central Australia: Sedimentology, Geochemistry and Provenance

    By N Donnellan

    The Palaeoproterozoic Warramunga Formation is notable as the host to the enigmatic, so-called 'Tennant Creek style' mineralisation. These polymetallic (but mainly Au-Cu-Bi) ore deposits t

    Jan 1, 1994

  • AUSIMM
    Bowen Basin Coalmine Spoil Classification for Improved Mine Rehabilitation Outcomes

    By T Baumgartl, J Burgess, B Emmerton, P D. Erskine

    Large-scale open cut mining in the Bowen Basin has been undertaken for over 40 years. During this period, improved mechanical capability and economics have allowed extraction to greater depths, result

    Jun 28, 2016

  • AUSIMM
    Sustainable Phytostabilisation of MineTailings - A Critical Analysis of System Requirements and Approaches

    By T Baumgartl, M Edraki, L Huang, D R. Mulligan

    "Phytostabilisation with tolerant plant species has been advocated as a cost-effective solution for sustainable cover of tailings from metal mines and bauxite refinery. The development of sustainable

    Jul 10, 2012

  • AUSIMM
    Research Needs in Regard to Design, Performance Criteria, Construction, Maintenance Assessment and Repair of Coal Mine Seals

    Legislation introduced for Queensland and New South Wales Coal mines provides different levels of prescription regarding specification of mine seals û generally in relation to capacity to withstand ov

    Jan 1, 2005

  • AUSIMM
    Iron Ore Grade Control for Flitch Mining – An Alternative Method for the Hope Downs Operation, Hamersley Province, Western Australia

    By A D. Caccioppoli

    Grade control systems within Rio Tinto Iron Ore have proven to be robust, when mining full benches. The Hope Downs 1 operation hosting two Marra Mamba Iron Formation deposits (North and South Deposits

    Aug 22, 2011

  • AUSIMM
    Linking safety factor to probability of failure

    By S M. Gover

    Estimating the probability of failure for embankments is not intuitive. It requires not only an appreciation of the strength of the embankment, but an understanding of the variability and uncertainty

    Jul 23, 2018

  • AUSIMM
    The Marvel Loch Crusher Product Sampling System

    The Marvel Loch Operations (MLO) plant was treating ores from up to six MLO sources and in addition needed to blend externally sourced ores with its own ores. This presented a metallurgical accounting

    Mar 1, 2010

  • AUSIMM
    A New Magnetic Drum Separator for Superfine Magnetite

    By Z Tong, M Gao, X Wang

    In response to the need for improved magnetic separators for beneficiation of fine grained iron ores that have been finely ground to liberate the iron minerals from the gangue, a series of high effici

    Jan 1, 2009

  • AUSIMM
    Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushers

    By J V. Mehrabani, A R. Sayadi

    Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul

    Sep 26, 2011

  • AUSIMM
    Geometallurgical Modelling of the Dumont Deposit

    By M Sciortino, J Korczak, J Muinonen, A St-Jean

    The Dumont deposit is a large (1179 Mt reserve), low-grade (0.27 per cent nickel) nickel sulfide project located in the Abitibi region 25 km west of Amos, Quebec. Royal Nickel Corporation (RNC) acquir

    Sep 29, 2013

  • AUSIMM
    Dilution, Ore Grade and Blast Movement Calculation Model

    By I C. Carrasco, V G. Mirada, J F. D Domingo, F S. Leite

    This paper investigates ore loss and dilution produced by rock movement in bench blasting. A total of four blasts, in which electronic detonators have been used, were monitored in Cobre Las Cruces Ope

    Aug 24, 2015