Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Understanding Rock Mass Behaviour through the Development of an Integrated Sensing PlatformBy E Widzyk-Capehart, C Hölck Teuber, S Steffen, V Rivero, O Fredes, E Sanchez, I Pedemonte, N Gonzalez
This paper summarises the research, development and initial application of a sensing platform that has the potential to monitor subsurface deformations, pore pressure and other variables simultaneousl
May 9, 2016
-
Research Into the Revegetation of Concentrator Tailings Dams at Mount ISABy Whiteman P. C, Stacey G. S, Hunter G. D
Processing of lead-zinc and copper ores by Mount Isa Mines Limited produces large quantit- ies of concentrator tailings waste which is pumped as a slurry to special dams where the solids are allowed
Jan 1, 1974
-
A Capitals Based Approach – Leading Innovation in Planning for Life-of-Mine SustainabilityBy L Dyer, A Keith, G D. Corder
As mining activity moves to remote and less developed locations globally, a holistic approach to mine development is fundamental for achieving a balance between strong financial returns and corporate
Jul 16, 2014
-
Strategic short-term geotechnical designBy K T. Mandisodza, T J. Cartledge
The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d
Jun 22, 2022
-
No entry mechanised presink of the Wira Hoisting ShafBy D Kilkenny
This paper discusses the use of a mechanised shaft sinking machine Herrenknecht Vertical Shaft Sinking Machine (VSM) – to conduct the 93 m presink for the Wira Hoisting Shaft at the Prominent Hill Min
Mar 29, 2023
-
Managing Community Relationships and Corporate Reputation - A Stakeholder PerspectiveBy S McEachern, J Lowe
An important issue currently facing the mining industry in Australia is the management and cost to the industry and other stakeholders of entry into and exit from towns and their communities. These co
Jan 1, 2006
-
Characterisation of Gold Ores by X-Ray Computed Tomography – Part 1: Software for Calibration and Quantification of Mineralogical PhasesBy L E. Howard
Micro-computed tomography (Micro-CT) is an X-ray imaging technique that produces high-resolution 3D computerised ‘virtual’ models of geological specimens based on the X-ray attenuation of different ma
Sep 5, 2011
-
Laboratory evaluation of ventilation effects on the self-heatingincubation behaviour of high volatile bituminous coalsBy B Beamish
The concept of a ‘critical velocity zone’ in the longwall goaf environment for the development of a spontaneous combustion event has been supported by numerical modelling. However, there is no experim
Oct 12, 2022
-
Influence of Distorted Blasthole Patterns on Fragmentation as well as Roughness of, and Blast Damage behind, Remaining Bench Face in Model-scale BlastingBy P Moser, R Ivanova, F Ouchterlony
This paper describes model-scale bench blasts on mortar blocks with distorted drill hole patterns, done in 2013–2014 at the Montanuniversitaet Leoben. The main aim of the project is to see if the frag
Aug 24, 2015
-
Mineral Processing Changes in New Zealand SteelBy D E. Thorp
The mining and concentration operations of New Zealand Steel have been carried out initially from the Waikato North Head (WNH) deposit since 1969 and subsequently from the Taharoa deposit since 1972.
Jan 1, 1977
-
Effect of Clay Rheology on Flotation of a Refractory Gold OreBy L Basnayaka, N Subasinghe, B Albijanic
"It has been recognised that the presence of clay minerals in ores adversely affect flotation performance. In this study, changes in rheological properties of the flotation pulps under normal operatin
Oct 10, 2016
-
Transforming dust control – lessons from tunnellingBy A De, B Palmer, rade, P Stowasser, A Fanning
Mining and tunnelling share many commonalities (eg confined working environments, excavation equipment and processes), but of significance is an overarching commitment to provide safe work conditions
Apr 16, 2024
-
Investing in new process improvement technology: reducing the risk of implementation – a way forwardBy S H. Algie, E J. Knoblauch, I A. Lovatt, S G. Doig
Mill operating teams are expected to engage in a perpetual quest for process improvement – pushing the boundaries of practical process limits and testing new technology to achieve the next step-change
Aug 29, 2018
-
Realising the Potential of the Boolgeeda Iron Formation – Stratigraphy and Iron Mineralisation at McCamey’s North, Hamersley Province, Western AustraliaBy P J. Howard
Atlas Iron Limited’s McCamey’s North project lies at the eastern end of the Hamersley Basin, approximately 50 km east of Newman, Western Australia, and 3 km northeast of BHP Billiton’s Jimblebar Mine.
Jul 11, 2011
-
Managing Geological Intellectual Property and Competitive Advantage - Newcrest Mining LimitedÆs ExperienceBy M Berry, F MacCorquodale
The ownership, management and employment structures operating in the Australian minerals industry have dynamically evolved during the last 30 years. One of the most dramatic changes, from an explorati
Sep 26, 2013
-
Studying the smelting behaviour of bauxite residue pellets reduced by hydrogen using high temperature thermal analysisBy J Safarian, D Hariswijaya
Treating bauxite residue as an alternative source of metals for iron and aluminium industry is an approach to promote circular economy in metal industries. Reduction of metal oxides with H2-based proc
Jun 19, 2024
-
Granulation Behaviour of Specularite Fines in Ferrous Sinter MixturesBy J Pan, B-J Shi, X-B Li
The granulation behavior of specularite fines which possess poor ballability was studied with limonite fines as a function of nuclei particles and adhering fines. The results show that the permeabilit
Jul 13, 2015
-
Embracing Modern Ecological Methods - Monitoring and Modelling for Mine Closure, not ComplianceBy A M. Lechner, S Arnold, M J. Gillespie, P D. Erskine, D R. Mulligan, A T. Fletcher, A Gordon
Mine ecological monitoring schemes are often conducted only to address compliance and in some cases do not have the sufficient statistical power or understanding of ecological systems to assess, quant
Jul 10, 2012
-
Blasting Near Mine Surface InfrastructureBy A J. Moore
Blasting operations in open cut mines results in airblast, ground vibration and rock movement with the potential for wild flyrock. In some mines there is a trend towards blasting closer to established
Nov 8, 2011
-
Viscosity of foaming fluid measured by falling-ball methodBy Y Mita, T Iwama, R Inoue, S Ueda
In the iron and steel manufacturing industries, efforts are being made to achieve carbon neutrality by 2050, and the transition from a coal-based steelmaking process to that utilising renewable energy
Aug 21, 2024