    Measurement of Payloads Carried by Mine Haul Trucks and the Influence of Payloads on Production Rates and Material Movement Costs

    By Alexander RB, Hollis AJ

    The magnitude of the payloads carried by mine haul trucks can have a strong influence on the mine production rates and costs. Consequently control of truck payloads is highly desirable, but in man

    Jan 1, 1986

  • AUSIMM
    Energy Recovery from Hot Particulates

    There are a number of mineral processing operations which produce at some point a stream of hot particulates. At today's energy prices it becomes important to recover the energy held in the ho

    Jan 1, 1981

  • AUSIMM
    "A Geometallurgical Proxy for Nickel Laterite Heap Leaching"

    By J Li, A McFarlane, J Yu, L L. Kuhar, R Meakin, N Chapman

    "Column leach tests are used frequently to predict recoveries and reagent consumption for nickel laterite heap leaches. These column leaches often run for more than 100 days and therefore require long

    Jun 15, 2016

  • AUSIMM
    Gold Particle Characteristics in Narrow Vein Deposits - Implications for Evaluation and Metallurgy

    By I M. Platten, Y Xie

    Narrow vein gold mineralisation generally contains both fine (<100 ¦m) and coarse (>100 ¦m) gold particles. The in situ size and shape, deportment, distribution and abundance of the particles co

    Jan 1, 2008

  • AUSIMM
    Jaguar Raisebore design using LiDAR for back analysis

    By R P. Varden

    This paper looks at the design of the Bentayga raisebore with subsequent back analysis using a LiDAR survey. A search for LiDAR raisebore assessment publications shows little work has been done on thi

    Mar 15, 2021

  • AUSIMM
    Paper No. 197. Notes on Tin Sluicing in Tasmania.

    IN this paper an attempt is made to describe the sluicing operations on the tin fields of north-eastern Tasmania. No claim is made to completeness, for much of the ground has already been covered, and

    Jan 1, 1911

  • AUSIMM
    Five years of cover performance monitoring and modelling for a store and release cover at Century Mine

    By T Rohde, P Defferrard

    In 2010 a store and release cover (the cover) was constructed on the south waste rock dump (SWRD) at Century mine. This also included aerial seeding of province native trees and shrub seeds. The purpo

    Jul 23, 2018

  • AUSIMM
    Sulfidisation of Ilmenite Concentrates Contaminated with Chrome Spinels – A New Approach to Impurity Separation

    By M I. Pownceby

    High temperature roasting studies on chrome-spinel contaminated ilmenite concentrates showed that sulfur, introduced through a sulfidising roast treatment, selectively reacted with the chromium in the

    Oct 5, 2011

  • AUSIMM
    Using X-Ray Diffraction for Grade Control and Minimising Environmental Impact in Iron and Steel Industries

    By U König

    The use of high speed detectors made X-ray diffraction (XRD) an important tool for quality and process control in the mining industries. Besides knowledge about the mineralogy of a sample it provides

    Jul 11, 2011

  • AUSIMM
    Improving the Fluxed Pellets Performance by Hydrated Lime Instead of Bentonite as Binder

    By J Pan

    In this paper, the technology of producing fluxed pellets by using hydrated lime as binder instead of bentonite was carried out. The properties of the two types green balls (0.8 per cent bentonite and

    Jul 11, 2011

  • AUSIMM
    Underground Mining Operations at The Selwyn Project

    Since the 1950's drilling has been rapidly mechanised. First from hand held drills with air legs to pneumatic jumbos, then to more effective hydraulic jumbos. Development of underground drill

    Jan 1, 1988

  • AUSIMM
    Characterisation of Coal Micro-Structure Using Scanning Electron Microscopy

    By Beamish B. B

    In this study, a systematic examination of the scale and variety of micro-structures in coal using Scanning Electron Microscopy (SEM) has been carried out, using coal samples of differing stages of

    Jan 1, 1991

  • AUSIMM
    Rock Excavation by Machine - A Comparative Study of Picks and Discs

    One of the responsibilities of the Melbourne and Metropolitan Board of Works is to provide a sewerage system for the metropolis of Melbourne which now contains over 2.5 million people. In providing

    Jan 1, 1976

  • AUSIMM
    No. 3 Shaft Winders and Winder House

    The sinking of the new No. 3 Shaft being mainly concerned with providing for the continuation of mining operations north of the existing workings, requirements for the shaft and haulage equipment were

    Jan 1, 1957

  • AUSIMM
    Optimisation of Length of Retreat Longwall Faces

    By Misra A

    After review of the status of research on optirnisation of retreat longwall faces it is argued that an acceptable optimisation model must be based upon realistic cost data that take into account not o

    Jan 1, 1995

  • AUSIMM
    The New Lead and Zinc Flotation Sections of the Concentrator of Broken Hill South Limited

    In this paper is given a description of the flotation plant recently erected by Broken Hill South Limited at the South Mine, Broken Hill, N.S.W. It has been built on the site of the old flotation plan

    Jan 1, 1935

  • AUSIMM
    Geometallurgical Sampling and Resource Estimation for Magnetite Deposits

    By J N. Farrell

    Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge

    Sep 5, 2011

  • AUSIMM
    An investigation of gyratory crusher liner wear at the Telfer Operation using non-operational streamlined modelling

    By J Harding, S Munro, R A. Bearman

    Despite the importance of the primary crushing stage, performance optimisation is not well analysed with sufficient focus to give improvement opportunities. At the Newcrest owned Telfer operation, lin

    Aug 24, 2022

  • AUSIMM
    Pillar Recovery at Cracow Gold Mine using Grouted Consolidated Mullock

    By V Mutton, L Potts, D Joyce

    This paper describes the method of extracting sill pillars within the underground operation from under unconsolidated mullock fill at the Cracow Gold Mine. This pillar recovery method was initially su

    Mar 26, 2012

  • AUSIMM
    Elastoplastic parameter change at claystone rock mass during sliding failure at Warukin Formation, Indonesia

    By G W. Swana

    Elastoplastic parameter is a parameter that describe how much materials behave elastically up to certain stress states and plastically thereafter (Hudson and Harrison, 1997). In the continuum analysis

    Nov 29, 2022