Search Documents

  • SME-ICGCM
    Improvements in Long Tendon Support with Pumpable Resin

    By Tom Meikle

    Long tendon support systems provide several challenges when used in-cycle as part of the secondary or primary support cycle. A two-component pumpable resin, Carbothix, has been in development for use

    Jan 1, 2012

  • CIM
    Narrow vein mine design at the Hoyle Pond mine

    By John G. Henning

    The Hoyle Pond underground mine is located in the Porcupine Gold Camp, 18 km east of downtown Timmins. Since the initiation of production in 1985, the operation has produced in excess of 1.9 million o

    Oct 1, 2004

  • DFI
    Conventional Static And Rapid Load Tests On CIDH Piers At A University Of California Berkeley Site

    By Gyimah Kasali

    Rapid Load Testing was performed as part of an extensive drilled pier testing program for the University of California Berkeley Capital Improvement Program. The purpose of the program was to: (1)

    Jan 1, 2002

  • DFI
    Results Of An International Pile Load Testing Prediction Event

    By N. Charue

    An international prediction event was carried out within the framework of a 30-pile testing program organized in a sandy soil in Belgium (Limelette). That program called upon sev­eral testing methods:

    Jan 1, 2002

  • IIMP
    Monitoreo y control de sismicidad inducida en la U.M. El Porvenir

    By Aquiles Vivar

    Ante los problemas de sismicidad inducidos por el sistema de minado en la Compañía minera Milpo, se planteó una solución a través del sistema de monitoreo sísmico único, donde se da una distribución

    Sep 9, 2007

  • SME
    Evaluating Underground Mining Hazards By Fuzzy FMEA

    By S. K. Oraee

    Managers always look for systems with minimum hazards. The hazards create problems for performance of projects. The largest and most important hazards of working underground mine can be related to he

    Jan 1, 2011

  • AUSIMM
    Modern Techniques of Geophysical Exploration

    The past decade has seen revolutionary advances in communications and information-handling techniques which have been stimulated by "cold war" military requirements and by current programmes

    Jan 1, 1963

  • CIM
    Economic Recovery and Upgrade of Metals from Middling and Tailing Streams (c573bdd5-90fc-4072-9ce3-2caa48051cb4)

    "As mine head grades decline and orebodies become more complex, traditional mineral processing techniques and flowsheets to achieve saleable concentrate become more difficult to design and construct.

    Jan 1, 2017

  • ISEE
    Increasing Productivity Through Field Control and High-Speed Photography

    By David G. Borg

    "Although researchers have realized varying degrees of success in numerics modeling, computer blast simulations and small scale in-situ testing, most will agree that the greatest uncertainty in total

    Jan 1, 1989

  • NIOSH
    OFR-10-94 Coal Recoverability And The Definition Of Coal Reserves: Central Appalachian Region, 1993

    By Timothy J. Rohrbacher

    This report presents results from an ongoing U.S. Bureau of Mines study defining domestic coal reserves. Examinations of five 7 ½ -minute central Appalachian quadrangles have been completed to date. O

    Jan 1, 1994

  • DFI
    Kentucky Route 9 - Licking Pike Widening Design Build Slope Stabilization

    By Frederick W. Slack

    This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage

    Jan 1, 2003

  • IIMP
    Computer application on exploration from project generation to the consolidation of a mining projects

    By Rogerio Castejón

    The evolution on the computer in the last 10 years have caused a big change on the way the mining companies are doing exploration. The following factors have contributed to that change: the downgrade

    Aug 25, 2002

  • SME
    Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3

    By Yifan Ding, Shemek Oginski, Patrick Finn

    The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,

    Jan 1, 2007

  • DFI
    Construction And Design Of Drilled Shafts In Hard Pinnacle Limestones

    By Dan A. Brown

    The following paper was written by Dr. Dan A. Brown, P.E. Brown is an Associate Professor at Auburn University's Department of Civil Engineering. The paper was originally presented at a FHWA&apos

    Jan 1, 1991

  • NIOSH
    RI 3942 Exploration of the Copper-Sulfur Deposit Khayyam and Stumble-on Properties Prince of Wales Island. Alaska

    By Earl L. Fosse

    "Preliminary examination of the Khayyam mine indicated that greater reserves of copper might be found by trenching, sampling, detailed geological and topographical mapping, and diamond drilling. The d

    Sep 1, 1946

  • CIM
    Utilizing Strain Criteria to Predict Highwall Stability Performance

    By H. Warren Newcomen

    Assessments of the stability performance of open pit highwalls have traditionally been based on consideration of surface movement rates. Although generally accepted in industry, this approach presents

    May 1, 2004

  • SME
    Design Based on Numerical Modelling a Requirement for an Economical Tunnel Construction

    By Gunter Swoboda, Harald Wagner

    Until a few years ago tunnel construction was based exclusively on experience. In recent years, however, numerical models have increasingly become an integrated part of tunnel design [2]. These models

    Jan 1, 1993

  • AUSIMM
    Analyses of Some New Zealand Scheelites

    Analyses of scheelite from all the known scheelite fields in the South Island of New Zealand have shown that the scheelites are essentially molybdenum-free. The scheelites are almost stoichiometric Ca

    Jan 1, 1970

  • ISEE
    Presplitting Techniques for Conventional, Air Deck and Dimension Stone Applications

    "The objective in controlled blasting is to reduce overbreak to control the final pit wall slope, shaft, drift ditch, bench, etc. to the final planned excavation limit. The six main types of controlle

    Jan 1, 1994

  • ISEE
    Innovative Blasting Mine Life Extension at a Coal Mine in Australia

    By R. Bitmead, R Barker, A. Drake

    The opencut coal mine is located about 50 km west of Brisbane, the capital city of Queensland in Australia and produces about 140 000 tonnes per annum of high grade steaming coal utilising a small tea

    Jan 1, 2002