Search Documents

  • CIM
    Recent Gravity Improvements at the Porcupine Joint Venture

    By Ron Millions, J. A. Folinsbee, Ishwinder Grewal, Michael Fullam, Don Strickland, Tony Y. Chong

    "Since milling began in 1912, the Dome mill, now part of the Porcupine Joint Venture (PJV), has been expanded several times, the most recent increasing the milling rate from 3,500 to 11,500 tonnes per

    Jan 1, 2004

  • AUSIMM
    The Application of Hydraulic Stowing Partially Deslimed Mill Residue in Stopes at Broken Hill South Limited

    CONTENTS: Broken Hill The mixing stations.Operating and mixing apparatus.Pulp distribution.Stope preparation.Filling procedure.Consolidation of old fill.Drainage:Pulp density tests. Life of sand pipe

    Jan 1, 1944

  • NIOSH
    OFR-179(1)-84 Guidelines For Open Pit Ore Pass Design - Volume 1 - Final Report

    By D. F. Hambley

    This report documents the work carried out by Engineers International, Inc. and its subcontructor, W. G. Pariseau, in order to develop a design manual for ore passes for open pit mines. The work inclu

    Jan 1, 1983

  • ISEE
    Blasting Bridges and Culverts in Fish Streams: Water Overpressure and Vibration Analysis

    By Kristen Dunlap

    There are several thousand remote stream crossing structures in the Tongass National Forest in need of removal. In 2007 thirty-three collapsing log bridges, log culverts, and metal culverts no longer

    Jan 1, 2009

  • IIMP
    The sleeper pit lake - a successful model for pit closure

    By Martin Williams

    During the coming decade, many of the first generation of ‘super-pit’ gold and base metal mining operations in North and Latin America will reach the end of their economic lives. The closure of such p

    Apr 22, 2003

  • CIM
    In-Situ Recovery in Hard Rock Applications: Idealistic Notion or Realistic Future Processing Option?

    By L. Vollert

    In-situ recovery of metals is presently experiencing a revival not seen since early applications in amenable copper oxide deposits, uranium and generally applications where neither, porosity and perme

    Jan 1, 2019

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • SAIMM
    Advanced Methods To Characterize Thermal Properties Of Quartz

    By E. H. Myrhaug, K. Aasly, T. Malvik

    Six different types of quartz and quartzites used as raw materials by ferroalloy plants have been investigated with respect to their thermo mechanical properties. In order to investigate the effect of

    Jan 1, 2007

  • TMS
    Study On Tin And Zinc Recovery And Pellet Preparation For Blast Furnace From Iron Concentrate Containing Tin And Zinc

    By Yuanbo Zhang

    Keywords: Complex Iron Ores, Roasting, Tin, Zinc, Pellets, Comprehensive Recovery. The complex iron ores containing tin, zinc are typical refractory ores. Large reserves of the ores are found in Ch

    Jan 1, 2005

  • CIM
    The Use of End Members for Grind – Recovery Modeling, Tonnage Prediction and Flowsheet Development at Raglan

    By L. Boyd, A. Charland, G. Potts, D. Fragomeni, N. O. Lotter

    "The Raglan orebody and concentrator has been the subject of study in Process Mineralogy at Falconbridge since 1998. (Lotter and Tuzun, 1998) The orebody is classified into three distinct textural gro

    Jan 1, 2005

  • SME
    Practical Application Of A Partial Cab To Reduce The A-Weighted Sound Level At The Operator’s Station On Surface Drill Rigs (16e0ea79-d925-4b2c-a99c-4b4744e63b41)

    By P. Jurovcik, D. Yantek, D. Ingram

    The National Institute for Occupational Safety and Health (NIOSH) identified hearing loss as the most common job-related disease in the United States in its 1996 National Occupational Research Agenda.

    Jan 1, 2007

  • AUSIMM
    Sustainability, Made Easy - A Business Improvement Case Study

    By N Currey, G Corder, G Becker

    "The SUSOP« Framework is a new technique that helps incorporate sustainable development principles and objectives into the design and operation of businesses. Developed through the Co-operative Resear

    Jul 15, 2013

  • DFI
    A Need To Reevaluate Attitudes In Engineering And Construction

    By d&apos, E. Appolonia

    A construction project is successful when all parties contributing to it are winners. It is not a success when there are winners and losers. Con­tractors, engineers, suppliers and equipment developers

    Jan 1, 1985

  • SME
    What we learned about MINING ENGINEERING and you

    By Marianne Snedeker

    In September 1985 we published a questionnaire asking about the content of MINING ENGINEERING and about your interests. By Dec. 10, our cutoff date, we had 430 responses, representing about 1.5% of th

    Jan 1, 1986

  • DFI
    Some Problems Encountered During Pile Installation - Synopsis

    By [D. N. ] Naresh

    During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som

    Jan 1, 1996

  • CIM
    Spiral Surface Property Investigation

    By X. Louw

    "This paper examines the change in surface properties of the Polyurea used on spirals at different operational times: unused spiral, 28 months in operation and 58 months in operation. This is being do

    Jan 1, 2017

  • CIM
    How to use Energy Management to Improve Mining Operation Productivity and Reduce Downtime: Canadian Utility Company Incentive Programs

    By A. Tylczak, C. Norman, C. Shook, S. Loif

    "There are a lot of good reasons to manage energy use at mining operations. Optimizing process energy use reduces operating costs. Tracking energy use can help identify unplanned process changes or m

    Jan 1, 2015

  • AUSIMM
    Effect of Matching Relationship Between Bubble Size and Particle Size on Kaolinite Flotation

    Effect of Matching Relationship Between Bubble Size and Particle Size on Kaolinite Flotation

    Sep 13, 2010

  • CIM
    Comminution Circuit Design Considerations (49th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 17-19, 2017)

    By S. Rivard

    "This paper demonstrates the selection of grinding circuit technology for a number of recent projects including discussion of the key drivers and the role of energy efficiency. Decreasing head grades

    Jan 1, 2017

  • AIME
    Institute of Metals Division - Strain Measurement on Wires at High Temperature (TN)

    By T. Price, H. A. Holl, A. P. Greenough, A

    UdIN, Shaler, and ulff' first used wires for the determination of the surface energy of a solid metal. A gage length was marked by tying knots in the wires, which were then suspended in a cylinde

    Jan 1, 1964