Search Documents

  • ISEE
    Expansion of the Panama Canal

    By Tom Treleaven

    The widening of the Panama Canal to approximately 130 feet (40 m) for its entire length began just a few years ago. The original expansion program was slated for completion in 18 to 20 years, but has

    Jan 1, 1997

  • SME
    VIMS Telemetry System

    By C. S. Wageman

    Staying competitive in the highly aggressive Powder River Basin is a challenge facing all operators. Any advantage that a mine utilizes to improve productivity and reduce costs could mean the differen

    Jan 1, 1996

  • AUSIMM
    Blast Hole Diamond Drilling as Developed for Sub-Level Stoping at New Occidental Gold Mines, N.L., Cobar, N.S.W.

    By Creelman C. A

    With the technique and data obtained in using the blast hole diamond drill for "Removal of Horizontal Level Pillar by means of Blast Hole diamond drilling at New Occidental Gold Mines N.L.,"

    Jan 1, 1945

  • SME
    Observational Method Using Real Time Surface Settlement Monitoring On The South Toulon Tunnel Project - Introduction - Project History

    By B. C. Vargas

    The Toulon tunnel project is a key component of the Highway corridor on the French Riviera between Marseille and Nice and is a fundamental transportation infrastructure for the region. The first desig

    Jan 1, 2012

  • CIM
    Industry Requirements for Introduction of Alternate Energies with Emphasis on Hydrogen Fuel Cells

    By Fred Delabbio

    There are presently several issues that the mining industry is facing, such as underground air quality, deep mining and green house gas emissions, which could be addressed by the application of altern

    May 1, 2007

  • NIOSH
    IC 6746 A Review Of Coal-Mine Fatalities In Indiana During The Fiscal Year, October 1, 1931, To September 30, 1932

    By C. A. Herbert

    During the fiscal year ended September 30, 1932, there were 27 fatalities in the coal mines of Indiana. Four of this number occurred in small mines employing less than 10 men, over which the State Ins

    Jan 1, 1933

  • SME
    Optimum Chain Pillar Design at the Deepest Multi-Seam Longwall Workings in India Mining, Metallurgy and Exploration (c1221f6a-70cf-4429-9a4d-13a3e324a05a)

    By Nilabjendu Ghosh, Satyendra Kumar Singh, Gautam Banerjee, Harshit Agrawal

    High-production methods like longwall mining with hydraulic powered supports are necessary to increase underground coal production in India. Longwall mining had a mixed success record for Indian geo-m

  • SME
    Optimum Chain Pillar Design at the Deepest Multi-Seam Longwall Workings in India Mining, Metallurgy and Exploration

    By Nilabjendu Ghosh, Satyendra Kumar Singh, Gautam Banerjee, Harshit Agrawal

    High-production methods like longwall mining with hydraulic powered supports are necessary to increase underground coal production in India. Longwall mining had a mixed success record for Indian geo-m

  • TMS
    Hoboken Converter Performance Improvements At The Phelps Dodge Miami Smelter

    By Ovidiu Pasca

    The Phelps Dodge Miami Smelter utilizes four Hoboken converters to process molten matte from the Isasmelt vessel. This paper presents past and present improvements in operation, maintenance and proce

    Jan 1, 2005

  • ISEE
    A Case Study of Dimensional Stone Blasting in Korea

    By Choon Sunwoo, Chang-Ha Ryu

    There are various methods available for the recovery of dimensional stone in open pit quarries. Explosive blasting has more advantages in the economic point of view over the other methods but was not

    Jan 1, 2003

  • IIMP
    Optimización del proceso gold mill Yanacocha Minera Yanacocha

    By Luis Vente

    El presente texto describe las mejoras implementadas en el proceso Gold Mill de Minera Yanacocha luego de 3 años de operación desde marzo 2008 hasta la fecha. El desarrollo de diferentes diseños en lo

    Sep 12, 2011

  • CIM
    High Fidelity Simulation of Full Mill Transport and Breakage in SAG/AG and Pebble Mills

    By John A. Herbst, Alexander Potapov, Xiangjun Qiu

    "High Fidelity Simulation is a name applied to the use of first principles modeling tools including Discrete Element Modeling (DEM), Computational Fluid Dynamics (CFD) and Discrete Grain Breakage (DGB

    Jan 1, 2003

  • IIMP
    Investigación y Desarrollo de Pruebas de Biolixiviación de Concentrados como alternativa de aprovechamiento de la capacidad de la Planta de Lixiviación – Extracción por Solventes y Electrodeposición – LESDE Toquepala

    By Joe Pezo

    Desde 1999 se desarrollaron pruebas de lixiviación de concentrados en la planta LESDE de Toquepala con el propósito de evaluar las recuperaciones y los tiempos de procesamiento. Las recuperaciones a n

    Sep 12, 2005

  • CIM
    Rock Mass Classification for Pre-Excavation Support Planning and at-Face Excavation Performance Assessment

    The rock mass classification systems were developed for different functions, including support selection, excavation method selection and the determination of rock mass engineering properties for exca

    May 1, 2009

  • SME
    Numerical Evaluation of Tunnel Lining in Visco?elastic creep active ground

    By Kyoosang Yoo

    The report presents the results corresponding to the analysis of a lining system for tunnels in soil and soft rock in creep-active ground. The purpose of the analysis is to evaluate the performance of

    Jan 1, 2010

  • NIOSH
    OFR-195(2)-83 User's Manual Of Safety Assessment Methods For Mine Safety Officials - Vol. II

    By P. M. Daling

    This report, sponsored by the U.S. Bureau of Mines, presents the results of an examination of available safety assessment methods and their applicability to the mining industry. Standard safety analys

    Jan 1, 1983

  • NIOSH
    OFR-17(1)-75 Survey Of Past And Present Method Used To Control Respirable Dust In Noncoal Mines And One Processing Mills ? Introduction

    By S. J. Rodgers

    MSA Research Corporation, Division of Mine Safety Appliances Company, was awarded a contract to conduct a survey of past and present methods used to control respirable dust in noncoal mines and ore pr

    Jan 1, 1974

  • SAIMM
    Determination Of Optimal Cut-Off Grade Policy To Optimize NPV Using A New Approach With Optimization Factor

    By A. Bascetin

    One very important aspect of mining is deciding what material in a deposit is worth mining and processing, versus what material should be considered waste. This decision is summarized by the cut-off g

    Jan 1, 2007

  • SME
    Inner City Slurry Tunneling—Project Asdam, Antwerp, Belgium

    By Klaus Rieker

    North of Antwerp central train station, two single-track tunnels for the high-speed train line between Brussels and Amsterdam were constructed. At the same time, the central train station was modified

    Jan 1, 2007

  • CIM
    Remote Real-Time Tire Monitoring in Open Pit Mines

    By Joel T. Werner

    Tire costs represent one of the highest controllable costs in open-pit mining, accounting for approximately 10% of mining costs. Tire monitoring technology has evolved rapidly in recent years and is e

    May 1, 2002