Search Documents

  • DFI
  • DFI
    Stress And Deformation Of Pile Foundation Of Sutong Bridge

    By Yin Zongze

    The pile foundation of Sutong bridge pylons is an extra large pile foundation. The length of piles is 115m, and the diameter of the piles is 2.5-2.8m. Since the traditional design method may not deter

    Jan 1, 2006

  • SME
    Assessing the Quality of Incident Investigations and its Effect on Safety Performance: a Study of the Ghanaian Mining Industry Mining, Metallurgy and Exploration (8a1ebcf2-b1e4-4dee-b069-d50c521c0838)

    By Carmel Bofinger, Maureen E. Hassall, David Cliff, Eric Stemn

    Incident investigation is of utmost importance in most high-risk industries and is often used to improve organisational safety. This study was undertaken to examine the content of past incident invest

  • SME
    Assessing the Quality of Incident Investigations and its Effect on Safety Performance: a Study of the Ghanaian Mining Industry Mining, Metallurgy and Exploration

    By Carmel Bofinger, Maureen E. Hassall, David Cliff, Eric Stemn

    Incident investigation is of utmost importance in most high-risk industries and is often used to improve organisational safety. This study was undertaken to examine the content of past incident invest

  • SAIMM
    Heavy Mineral Processing At Richards Bay Minerals

    By J. D. Steenkamp, G. E. Williams

    Keywords: Ilmenite, titania slag, pig iron, rutile, zircon Located on the eastern shores of South Africa, 180 km north of Durban, Richards Bay Minerals (RBM) produces approximately 2.0 million met

    Jan 1, 2006

  • AUSIMM
    Some Notes on Bank Deposits, With special reference to those met with at the Denny Dalton Goldfields, Vryheid District, South African Republic, and the Process of Treatment Employed There

    To many Australian Mining Engineers, we take it, the singular features of banket deposits are not as familiarly known as they would wish, possibly because in the majority of instances they are not in

  • SME
    Grouting And Freezing For Shaft Water Control In Milwaukee

    By Patrick J. Doig

    The contract for the construction of the Inline Pump Station for the Milwaukee Metropolitan Sewerage District involves the sinking of three shafts and the excavation of a pump chamber. The shafts a

    Jan 1, 1985

  • DFI
    Analysis Of The Settlement Of A Single Axially Loaded Soil-Cement Pile

    By Jiwei Duan

    The deformation and load transfer behavior of a single soil-cement column are studied with the finite element method. The results show that there is an effective length for a soil-cement column. Beyon

    Jan 1, 2002

  • SME
    Safe Slot Hole Excavation With A New Boxhole Boring Machine - Introduction

    By W. Burger

    In underground mines worldwide, a large number of short and small diameter slot holes need to be excavated. Herrenknecht has developed and built a new boxholeboring machine based on the well-proven Mi

    Jan 1, 2012

  • AIME
    Mineral Dressing

    By Charles E. Locke

    DEPRESSION in all lines of the mineral industry except gold, which began in 1930 and continued, even worse, through 1931, had its effect on ore concentration. Construction was limited to the completio

    Jan 1, 1932

  • SME
    An Evaluation Of Microseismic Activity Associated With Major Roof Falls In A Limestone Mine: A Case Study

    By T. Bajpayee, J. Ellenberger

    Microseismic monitoring and evaluation is one aspect of the National Institute for Occupational Safety and Health (NIOSH) research program. Roof falls are often preceded by a period of elevated micro

    Jan 1, 2007

  • AUSIMM
    Removal of Horizontal Level Pillar by Means of Blast Hole Diamond Drilling at New Occidental Gold Mine, Cobar, N.S.W.

    By Creelman C. A

    The removal of a horizontal piIlar between Nos. 9 and 11 levels (1,116 feet from the collar of main shaft) was successfully carried out by blast hole drilling, and, to the best of the authors' kn

    Jan 1, 1944

  • DFI
    Load Testing High Capacity Drilled Shafts - Summary

    By Jorj O. Osterberg

    Until ten years ago, the largest load tests on drilled shafts (bored piles) were about 3,000 tons (27MN). These tests were made with kentledge (large weights, usually concrete blocks) stacked up as a

    Jan 1, 2002

  • DFI
    Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In Driving

    By Hodjat] [Shiri

    A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in

    Jan 1, 2006

  • SME
    Expanding The Limitations Of The MFire Simulation Model

    In 2002 the authors updated the MFire model developed by the US Bureau of Mines. MineFire, developed by Mine Ventilation Services, Inc. (MVS), uses the MFire model to perform mine fire simulations on

    Jan 1, 2011

  • SME
    The Tichauer-DeTomi Matrix: a Tool for Assessment of Geological Uncertainty in Small-scale Mining Mining, Metallurgy and Exploration (9437b467-4b8d-4115-856e-5795cdbb6370)

    By Giorgio De Tomi, Ricardo Tichauer

    Mineral exploration is a critical step for success in mining. However, small-scale mining often ignores exploration best practices. This paper introduces the Tichauer-DeTomi Matrix, a tool for assessm

  • SME
    Pre-Excavation Grouting Through Water Bearing Zone Under High Pressure Under Extreme Flow Conditions

    By Adam Shang Robert Fu

    The Yung-Chung-Tunnel in Taiwan, constructed for the Taiwan-East Railway Bureau, collapsed during construction when a water bearing, fractured marble zone was intersected. The inflow was approximately

    Jan 1, 2007

  • SAIMM
    Bindura Nickel Corporation Smelter Operations

    By E. Dzingayi

    Keywords: Pyrometallurgy, furnace, Bindura, nickel The smelter at Bindura Nickel Corporation processes concentrates from its own mines and other external sources. Concentrates are dried, smelted,

    Jan 1, 2006

  • CIM
    Necessity Driving Change and Improvement to the Cleaner Circuit at Lumwana Copper Concentrator

    By G. Cordingley, A. Mwanza

    Lumwana is an open pit Copper mine located in the Northwestern Province of Zambia approximately 80 km west from the provincial capital of Solwezi, approximately 300 km northwest from the Copperbelt an

    Jan 1, 2014

  • DFI
    Vibration-Free Driven Tubular-Piles

    By S. Doombos

    To convert the railway-bridge across the Oude Maas between Dordrecht and Zwijndrecht into a vertical lifting bridge, a drastic adaptation of the existing piers is necessary. Extra piles have to be pla

    Jan 1, 1989