Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    Improving The Trough Opening Process At Premier Mine Utilizing Electronic Delay Detonators

    By H. Möhle

    Premier Mine is a large underground diamond mine, situated at Cullinan in the Gauteng Province of South Africa. The mine hoists over 3 millions tons of diamond bearing kimberlite per year, from a mode

    Jan 1, 2000

  • SAIMM
    Seismic Monitoring Of A Simulated Rockburst On A Wall Of An Underground Tunnel

    By A. M. Milev

    A simulated rockburst was conducted underground at Kopanang Mine, previously called Vaal Reefs No. 9 Shaft. The rockburst was simulated by means of a large blast detonated in solid rock close to a cro

    Jan 1, 2001

  • SAIMM
    Improving spatial mine-to-plan compliance at an open pit mine through enhanced short-term mine planning

    By T. J. Otto, C. H. Cloete, T. Mkhatshwa, T. J. van Heerden

    The value realised by an open pit mine depends on the quality and integrity of the mine planning process as well as the level of execution against these mine plans. When managing the execution against

    May 27, 2025

  • SAIMM
    Extensions to an efficient optimization model for long-term production planning at LKAB’s Kiruna Mine

    By M. Kuchta, A. Newman

    LKAB’s Kiruna Mine, located above the Arctic Circle in northern Sweden, is the second-largest underground mine in the world today. The orebody is a world-class high-grade magnetite deposit, from which

    Jan 1, 2003

  • SAIMM
    Cyanide Control In The Metallurgical Process Of Gold Extraction In AngloGold (S.A.)

    By B. J. Vorster

    AngloGold South Africa region currently consists of twelve gold plants. These plants use a combined total of $20 million of cyanide per annum. Of this, the major portion (60%) is consumed at two Ergo

    Jan 1, 2001

  • SAIMM
    Cu-Removal From The Skorpion Circuit Using Emew® Technology

    By I. Ewart, E. Roux

    Skorpion Zinc operates a solvent extraction/electrowinning zinc plant producing over 150 000 t/a of special high grade (SHG) zinc (>99.995% Zn). In the current flow sheet copper and cadmium are cement

    Jan 1, 2007

  • SAIMM
    Accelerated Kimberlite Weathering - The Role Of Cation Type On The Settling Behaviour Of Fines

    By E. T. Boshoff

    Paper written on project work carried out in partial fulfilment of B. Eng. (Metallurgical Engineering) The weathering of kimberlite can be accelerated with cations in solution if swelling of the ki

    Jan 1, 2005

  • SAIMM
    Towards A Mineral Property Valuation Code: Considerations For South Africa

    By F. T. Cawood

    One of the consequences of globalizing mine finance is a necessity to apply uniform accountancy and valuation standards that are clearly understood and consistently applied by the global investment co

    Jan 1, 2004

  • SAIMM
    Recent Developments In Physico-Chemical Characterization And Modelling Of Ferroalloy Slag Systems

    Recent studies on the physico-chemical properties of molten slags and oxide solid solutions of interest are reviewed. The review covers redox and phase equilibria in slags, viscosity, diffusivity, ele

    Jan 1, 2004

  • SAIMM
    Investigation Of The Influence Of An Excavation On Adjacent Excavations, Using Neural Networks

    By S. Kwon

    When an underground excavation is created near to an instrumented measuring location, deformation at the location increases. The characteristics of this deformation increase, as well as the duration o

    Jan 1, 1998

  • SAIMM
    CFD modelling of methane movement in mines

    By D. Whittles, C. J. Lea, T. X. Ren, A. Kelsey

    A methodology for the simulation of methane drainage combining geotechnical modelling and computational fluid dynamics (CFD) will be described. Geotechnical modelling was used to predict the developm

    Jan 1, 2003

  • SAIMM
    Rockpass Stability And Rehabilitation At AngloGold Ashanti?s Tau Lekoa Mine

    By G. B. Dukes

    Scaling of rockpasses was problematic at Tau Lekoa Mine prior to production commencing in 1991. High horizontal stress levels relative to the host rock mass strength have been instrumental in causing

    Jan 1, 2006

  • SAIMM
    Factors Influencing Base Metal Recovery From Waste Reverberatory Furnace Slags In A50 KVA Laboratory DC Plasma Arc Furnace

    By W. Banda

    Paper written on project work carried out in partial fulfilment of Phd. (Process Engineering) degree* The recovery of cobalt and copper from waste slag was studied in a plasma DC-arc furnace in red

    Jan 1, 2004

  • SAIMM
    What boundary conditions should we apply? Applications to tunneling and to the AECL Underground Research Laboratory

    By B. Amadei, F. Tonon

    Rock stress measurement is cast in the more general context of the determination of boundary conditions for rock engineering. A study on the effect of elastic anisotropy on underground excavations rev

    Jan 1, 2003

  • SAIMM
    Infacon X Organising Committee

    [Dr. N.A. Barcza (Chairman) Mr. R.J. Linnell (Vice Chairman) Mr. J. Basson Dr. L.A. Cramer Mr. W.A. Gericke Dr. N.C. Machingawuta Mr. C.S. Mahony Dr. L.R. Nelson Mr. D. St J. Slater

    Jan 1, 2004

  • SAIMM
    A study on the partially saturated mechanical behavior of iron ore of Lorraine (France)

    By D. Grgic, A. Giraud, F. Homand

    RESUME : Le comportement mécanique partiellement saturé du minerai de fer a été étudié à partir d’essais de compression simple sur des éprouvettes à pression capillaire imposée par les solutions salin

    Jan 1, 2003

  • SAIMM
    Proceedings, 102nd Annual General Meeting, 1999

    The 102nd Annual General Meeting of The South African Institute of Mining and Metallurgy was held in the Gold Room, Transvaal Automobile Club, 60 5th Street, Lower Houghton, Johannesburg on Wednesday,

    Jan 1, 1999

  • SAIMM
    Topical Interest - Increasing Black Representation In Mining Engineering: The Need For A New Approach

    By Jeffrey C. Hillman

    The need to recruit locally produced engineers by the South African Mining Industry led to the Engineering Faculty at the University of the Witwatersrand developing a number of academic bridging initi

    Jan 1, 1996

  • SAIMM
    DMS Cyclone Modelling At De Beers

    By Kurt R. P Petersen

    This paper discusses the current approaches to modelling the DMS cyclone within the De Beers group. Current efforts are split into short term value-adding process understanding and longer term semi-fu

    Jan 1, 2006

  • SAIMM
    The potential for the recovery of chromite sands from the Murray Basin, Australia

    By L. K. Smith

    The position of Australia as a continuing long-term supplier of mineral sands, and their upgraded products, has been reinforced with the discovery of the extensive mineral reserves in the Murray Basin

    Jan 1, 2003