Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Deep Foundations In The Challenging Geology Of Central Florida

    By Gary Kuhns

    Central Florida is among the fastest growing urban areas in the United States, and its rapid development has required the steady construction of various types of civil engineering works. The karst geo

    Jan 1, 2003

  • DFI
    The Bawang Pile ? A New Type Of Pile ? Synopsis

    By B. Broms

    The "Bawang Pile" (in english "onion" pile) described in the article consists of a cased concrete shaft and an expanded base. The steel casing is first driven by an internal drop hammer and then the b

    Jan 1, 2010

  • DFI
    Careful And Controlled Underpinning Methods In Restoration Of Damaged Houses In The Old Town Of Stockholm

    By T. Iwanowski

    Stress wave measurements and calculations are often used to make a safe determination of the bearing capacity and the integrity of driven piles. Some applications to the restoration of old buildings i

    Jan 1, 1991

  • DFI
    Vibratory Driver/Extractors Do More Than Drive Sheet Piles - Summary

    By John L. White

    Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to

    Jan 1, 1997

  • DFI
    Recent Advances In Large Diameter Diaphragm Wall Shafts

    By Benoit Virollet

    Over the last 10 years the diameter of unbraced, unlined and unanchored circular shafts has grown dramatically in many parts of the world. This progress has taken place through improvements in: constr

    Jan 1, 2006

  • DFI
    Construction Technique Used To Build The Drilled Shafts For The Victory Bridge

    By T. Jason Hardell

    The Victory Bridge project was contracted by the New Jersey Department of Transportation. The project included the construction of two 4000-ft precast segmental concrete bridges to replace the existin

    Jan 1, 2005

  • DFI
    Tanana River Bulkhead Expansion, Flexibility In Construction; Key To Arctic Dock Construction

    By Roy Peratrovich

    An innovative cost-saving design for a 1,100 ft bulkhead on the Tanana River at Nenana in central Alaska won Alaska Construction & Oil magazine's Construction Achievement Award. The designers uti

    Jan 1, 1985

  • DFI
    The Challenges Of Construction In Karstic Limestone: Three Major Case Histories

    By Donald A. Bruce

    The construction of major structures in karstic limestone terrains poses difficult problems to designer and contractor alike. This reflects the inherent variability of such conditions, and also the si

    Jan 1, 2002

  • DFI
    Automated Instrumentation For ACIP And Drilled Displacement Piles - 1. Introduction

    By John Lemke

    Current practice for monitoring static pile load tests commonly consists of measuring load and displacement at the top of a pile. This is typically accomplished by monitoring dial gauge movements, lin

    Jan 1, 2002

  • DFI
    Video Inspection Of Rock Sockets For A Piling Project

    By Ali Ameli

    Design loads are limited for piles relying upon toe stresses in rock due to uncertainty about the rock quality over the whole pile diameter because of rock mass properties or construction effects. Th

    Jan 1, 2006

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Program Development - Background - Collapse

    By Darrell L. Beddard

    The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western

    Jan 1, 1996

  • DFI
    Analyses On Laterally Loaded Cast-In-Place Concrete Piles ? Synopsis

    By Makoto Kimura

    Failure tests on laterally loaded single and pile group are analyzed with a 3-dimensional elasto-plastic finite element program. In the analysis, the mechanical behavior of the ground is supposed to b

    Jan 1, 1996

  • DFI
    Rock Sockets

    By D. E. Sherwood

    Mr. Tamaro introduced his paper which concerned the construction of foundations for the buildings and related infrastructure of the World Financial Center on a reclaimed shoreline site at the Southern

    Jan 1, 1991

  • DFI
    A Decade Of Concrete Embedded Walls In UK - Synopsis

    By Robert Fernie

    Demographics and Infrastructure demands have led to a significant increase in construction of: deep basements for buildings and, trough structures for Highway and Rail/Metro. Concrete embedded walls u

    Jan 1, 2000

  • DFI
    Micropiles At The Transformation Ago Project

    By Jim Bruce

    The Transformation AGO project, constructed between 2005 and 2008, featured a foundation trade contract that included design of pile caps and grade beams and construction of 138 permanent micropiles.

    Jan 1, 2011

  • DFI
    Foundations For Light Buildings On Lime/Cement (L/C) Columns ? Summary

    By Per Eriksson

    For light buildings on clay, foundations on L/C-columns is in many cases a competitive alternative to piles when the thickness of the clay is moderate (<20 m). The method is applicable for the above m

    Jan 1, 2000

  • DFI
    The Application Of The Caisson In China

    By Chen Xizhe

    The caisson is adapted to the foundation of concentrated heavy building. As there are the flowing sand, boulder or cobble and other serious obstruction, the open caisson can&apos;t sink, the caisson c

    Jan 1, 1991

  • DFI
    Coming To Times - Background - Collapse

    By Darrell L. Beddard

    The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western

    Jan 1, 1995

  • DFI
    Determination Of Pile Lengths Under Existing Structures

    By Mohamad Hussein

    Low strain dynamic tests are performed to evaluate the structural integrity of driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed b

    Jan 1, 1992

  • DFI
    Seattle Shored Excavation - Design, Construction, Monitoring

    By David Winter

    The geotechnical design, construction, and monitoring aspects of a tied back excavation 85 feet deep in Seattle, Washington are presented. The excavation was completed in overconsolidated deposits of

    Jan 1, 1987