Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pile Foundations for the San Francisco 49ers NFL StadiumBy Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi
"The new San Francisco 49ers Levi’s Stadium is part of the next generation of sporting facilities. Constructed in Santa Clara, Calif., the new structure has 68,500 open-air bowl seats and includes a 7
Jan 1, 2014
-
New Ground Freeze Method for Groundwater Cutoff below Foundation Excavations in Permeable SoilsBy Daniel W. Mageau, Larry W. Applegate, Aaron K. McCain
"An innovative method of ground freezing was successfully tested to create a “dry” excavation condition for a new building foundation at a site in downtown, Miami, Florida. The subsurface conditions i
Jan 1, 2015
-
Design for Installation of Suction Piles in Sand Deposits for Mooring of Floating Offshore StructuresBy Chul Soo Park, Juhyung Lee, Duhyun Baek
"In this study the preliminary design of suction pile as the supporting system of the concrete floating structures was performed at the offshore pilot project area in Korea. The suction pile of the fl
Jan 1, 2017
-
Installation Checklist For Driving Mega PilesBy Douglas L. Scaggs
Over the past several years, pile foundations have grown to meet the demands of larger and heavier structures. As the foundations have grown, so has the need for larger and more robust piles to carry
Jan 1, 2013
-
Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic EnvironmentBy Thomas M. Caruso
Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,
Jan 1, 2008
-
Testing Foundations for Major Minnesota BridgesBy Dan A. Brown, Rich A. Lamb, Paul J. Axtell
"Over the last 10 years, the Minnesota Department of Transportation (Mn/DOT) has had a very active program of replacing many major bridges, large structures spanning the Mississippi River. The deep fo
Jan 1, 2013
-
Foundations For Arsenal Emirates Stadium, LondonBy Jim Cook
Arsenal Football Club required the development of a new home stadium in north London, subsequently named the Emirates Stadium. The proposed development comprised a 60,000 seat stadium, with associated
Jan 1, 2008
-
Retaining Structure for Berth at KrishnapatnamBy P. V. Chandramohan
"The paper deals with the arrangement of structural members for a retaining structure used as a berth in the port of Krishnapatnam. The height of retention is 24.3m. A T-shaped diaphragm wall acts as
Jan 1, 2015
-
Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley MineBy Terry Eldridge, Keith MacKay, David Siddle, Luke Moger
On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water
Jan 1, 2016
-
Critique of Specifications for Deep MixingBy George Filz, Peter R. Cali
"Unnecessarily restrictive specifications could be limiting the cost effectiveness of deep mixing (DM) applications and therefore limiting use of DM on projects where there are other options. Excessiv
Jan 1, 2015
-
TBM Recovery Shaft Construction - SR-99 TunnelBy Lance Rasband, Richard Hanke, John Starcevich
"The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure
Jan 1, 2016
-
Risk Management For Dam Rehabilitation ProjectsBy Dave Paul
Dam rehabilitation involves a range of design, construction, and operation risks, some of which are not encountered in new dam construction. These risks can have significant impact on project schedule
-
Cutoff Wall Selection for Levee ImprovementBy Louay Owaidat
The United States Army Corps of Engineers (USACE) Sacramento District awarded a $64 million construction contract in February 2020 to the Maloney Odin Joint Venture for 3 mi (4.8 km) of levee improvem
Oct 1, 2022
-
Partnering for Cutoff Wall Project SuccessBy Osvaldo Valdez, Matteo Bertoni, Aem Ragy
The East St. Louis Deep Cutoff Wall project is located in the area of East St. Louis, Illinois, across the Mississippi River from the city of St. Louis, Missouri, along the left descending bank of the
Sep 1, 2023
-
Experiences and New Developments in Offshore Foundation (610f0063-3ba0-451b-bb8c-dc3962343edb)By Leonhard Weixler, Jean Wehbe, Gordian Ulrich, Franz-Werner Gerressen
"As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced
Jan 1, 2017
-
Screening Tool for Impact Hammer SelectionBy Gerald Verbeek, David Tara
"When selecting an impact hammer to drive a particular pile, the decision is often based on local experience. In those cases, the contractor falls back on previous experience or draws on the experienc
Jan 1, 2017
-
Case History: Innovative Load Test Program Optimizes Pile Capacity In Challenging Ground ConditionsBy Emad Farouz
This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Plan
-
New Pile for Reduced Underwater NoiseBy Dardis J. T. II, P. G. Reinhall
"Impact pile driving of steel piles in marine environments produces extremely high sound levels in the water. It has been shown that current pile driving noise attenuation techniques provide limited n
Jan 1, 2017
-
Session 18 "Grouting for Micropiles & Anchors"By Jim Bruce
No answer required. From the drilling equipment suppliers, but the specifications must be tailored to be project-specific. Yes, the sonic technique is very interesting as we said, and it is not so muc
Feb 10, 2003
-
Realistic Estimation Of Water Table Depth For Design Optimization Of Bored Tunnel And Cut & Cover Tunnel Structures For Underground MetroBy Chiranjib Sarkar, Sibapriya Mukherjee, N Kumar Pichumani
With the rapid expansion of urban transportation systems, tunnels and cut & cover structures are considered as the only solution in improving the urban space congestion problem in mass rapid transit s
Nov 1, 2022