Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Integrated Advanced Grinding Control System at Newmont Ahafo (4ebdb86b-3410-4a78-94cd-dbe1c9ed39a6)

    By O. Guyot, A. Broussaud, M. Revalor, G. Legrand, D. Kok, E. Roux

    "The paper describes the advanced grinding control system implemented at Newmont Ahafo gold mine, Ghana in 2009 and 2010. It shows how the different components of the Advanced Process Control (APC) sy

    Jan 1, 2012

  • CIM
    Field Instrumentation Studies in Cemented Paste Backfill

    By Murray W. Grabinsky

    The in situ performance of Cemented Paste Backfill (CPB) systems can be monitored to improve understanding of the paste?s behaviour and therefore optimize the geomechanical design of the cemented past

    May 1, 2008

  • CIM
    The Engineering, Procurement and Construction of the Éléonore Project

    By A. Fortin, C. Fréchette, M. Kreuh

    Éléonore project is a gold ore processing plant at a mine site located near James Bay, Quebec, Canada. SNC-Lavalin was mandated by Goldcorp to perform EPCM services on the ore processing plant and per

    Jan 1, 2015

  • CIM
    The Argyle Diamond Discovery, Kimberley Region, Australia

    By A. J. A. Janse

    The Argyle diamond mine is located in the Kimberley region in the northern part of Western Australia at approximately 16°43'S, 128°23'E in subtropical bush/shrub savannah. The 46 ha (113 acr

    Jan 1, 1992

  • CIM
    Simulation - An Approach to Risk Analysis in Coal Mining

    By João Felipe Costa, Jair Carlos Koppe, André C. Zingano

    Abstract - Traditional mine planning based on block models built with interpolation techniques such as kriging does not take into account the uncertainty associated with the estimates. These models ar

    Jan 1, 2000

  • CIM
    A Pilot-Scale Examination of a High Pressure Grinding Roll / Stirred Mill Comminution Circuit

    By J. A. Drozdiak, A. Bamber

    In this paper we examine, through pilot-scale testing, the possibility of operating a circuit comprised of two stages of HPGR comminution, followed by grinding through a horizontal stirred mill. In or

    Jan 1, 2012

  • CIM
    Multi-Stage Hydrocyclone Circuit Optimization by Computer Simulation

    By G. E. Agar, R. Stratton-Crawley

    "The applicability of a hydrocyclone model to simulation of the cyclone banks in a multi-stage sandplant circuit producing mine back fill has been demonstrated. The model ha~; been used in conjunction

    Jan 1, 1979

  • CIM
    Modelling of the contamination effect introduced by ammonia on the performance of PEM fuel cells

    By X. Z. Yuan

    Contamination introduced by the impurities from the feed stream can impact the PEM fuel cell performance dramatically. The presence of these unwanted trace species such as CO, H2S, NH3, can adversely

    Jan 1, 2005

  • CIM
    Emplacement Features of Cupriferous Noritoids in the Okiep Copper District, Namaqualand, South Africa

    By Michael K. Watkeys, Jacobus E. Potgieter, E. Guy Charlesworth, Carl R. Anhaeusser, Roger L. Gibson, Alexander F. M. Kisters

    Intrusive features of cupriferous noritoids from the deeply eroded Proterozoic granite-gneiss terrane of the Okiep Copper District in South Africa illustrate the emplacement of basic magmas into a mid

    Jan 1, 1994

  • CIM
    Contrasting Volcanic-hosted Massive Sulfide Styles ill the Tulks Belt, Central Newfoundland

    By R. M. Graves, C. B. McKenzie, D. Barbour, D. W. Desnoyers

    "The prospective Tulks volcanic belt hosts five significant massive sulfide deposits, Tulks Prospect, Tulks East, Jack's Pond, Daniel's Pond and Victoria Mine, as well as numerous showings a

    Jan 1, 1993

  • CIM
    Maximiser ? Beyond Pit Optimisation

    By M. A. Kelly

    Pit Optimisation using the Lerchs Grossman algorithm has been successfully applied in many deposits. Pit shells often form the basis for scheduling. Pre-assigned costs may not accurately reflect the c

    May 1, 2007

  • CIM
    Towards Mechanistic Descriptions of Charge and Slurry Transport in Tumbling Mills (9cf2cc6c-a5a7-4d0b-861d-5dfc2f8aa93b)

    By D. J. Parker, G. B. Tupper, I. Govender

    Positron-Emission-Particle-Tracking (PEPT) has enabled the non-invasive observation of charge and slurry transport in model mills under operational conditions. We use high quality PEPT data to infer t

    Jan 1, 2012

  • CIM
    Pressure Leaching of a High Arsenic Copper Concentrate under CESL Process Conditions

    By F. Parada L

    Two copper concentrate with medium and high enargite content were leached in a 3 L autoclave reactor under conditions based on the CESL process. Copper, arsenic, sulfur and iron were checked in all th

    Jan 1, 2014

  • CIM
    Effects of the Rolls’ Speed and Pressure on the HPGR Performance during Gold Ore Grinding

    By H. Dundar, C. Dzomeku

    An extensive testwork was performed around the HPGR plant at GoldFields Ghana Limited Tarkwa Gold Mine. The HPGR was used to prepare the feed for heap leaching. The circuit was configured in such a wa

    Jan 1, 2012

  • CIM
    Automated Fuel Inspection

    By J. Vanderlaan

    A proposed method of applying high-speed, non-destructive part scanning technologies to the production process of UO2 (Uranium Dioxide) fuel pellets is presented. The scanning process examines each pe

    Aug 1, 2010

  • CIM
    Study of Separation of Terbium and Dysprosium from Other REE by Solvent Extraction

    By Carlos Antônio de Morais, Renata Dias Abreu

    The present work describes a study of the separation of terbium and dysprosium from heavy RE concentrate through a solvent extraction circuit in a counter-current system. As the efficiency of the REE

    Jan 1, 2014

  • CIM
    Predicting Locked Cycle Flotation Test Results from Batch Data (9b93f081-168f-46c4-8d36-c19edeaa341b)

    By G. E. Agar, W. B. Kipkie

    "This paper deals with the prediction of locked cycle flotation results from data developed from individual batch tests. A postulate is made that the distribution of material in a separation stage is

    Jan 1, 1978

  • CIM
    History of Electrolytic Cobalt Refining at Vale Canada (Inco)

    "Cobalt refining at Vale Canada (previously known as Inco) has been associated with Ni production. Because certain compounds of both metals carry risks for adverse health endpoints by inhalation expos

    Jan 1, 2015

  • CIM
    Probability in Size Analysis

    By C. W. Eggert

    "The idea for this talk came to me last year when I was attending the Canadian Gold Metallurgists Meeting. I talked about it to a friend of mine who is an authority on mineral dressing, particularly t

    Jan 1, 1968

  • CIM
    Geology as a Risk Factor in Project Evaluation: Its Impact on Reserve Estimation (2ef6f64b-2707-4726-a421-479467e1e910)

    By Chris M. Healey

    "Perhaps the single most significant variable in the evaluation of a mining project is the reserve estimate. Many parameters are considered when estimating reserves, among them geology. This paper exa

    Jan 1, 1992