Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Review of Boliden Harjavalta Copper Smelter

    By P. Latostenmaa, T. Veneranta, J. Järvi, E. J. Peuraniemi

    Boliden Harjavalta has operated a copper flash smelter since 1949 thus the smelter celebrates 70th anniversary of flash smelting in 2019. This paper shortly describes the historical perspective of the

    Jan 1, 2019

  • CIM
    Vanadium Electrolyte Cost and Purity Considerations for Vanadium Redox Flow Battery Applications

    By Maria Skyllas-Kazacos

    The All-Vanadium Redox Flow Battery that was pioneered and has been developed at the University of New South Wales (UNSW) in Sydney since the mid-1980s is currently regarded as one of the most attract

    Jan 1, 2014

  • CIM
    Implementation of a Greenhouse Gas Reduction Roadmap for Mining and Metallurgy Companies

    By Julia Pflieger, Manfred Russ, Johannes Gediga

    This paper shall show an economic feasible approach to implement Greenhouse Gas (GHG) reduction measures into the mining and metallurgy industry. The goal to improve energy consumption is directly lin

    Jan 1, 2010

  • CIM
    Structural Evolution of Cold Compacted Al-Co Alloy System

    By I. Raheb, M. Y. Debili

    "A set of Al-Co binary alloys (with respectively in weight percent 10%, 20%, 30%, 40%, 50% and 60% Co) have been studied by X-ray diffraction at the as compacted state. The structural evolution accord

    Jan 1, 2015

  • CIM
    Field identification of Cu-Au-Fe-Oxides Bearing Hydrothermal Systems in Undifferentiated Gneiss Complexes of the Grenville Province

    By Louise Corriveau

    Exploration strategies have traditionally considered felsic gneiss complexes of the Canadian Shield sterile. This paradigm is challenged with the discovery of extensive granulite-facies Cu-Au, Fe oxid

    May 1, 2003

  • CIM
    Design of a Control Strategy for Kidd Creek Grinding Circuit Line B

    By S. Pinard, A. Desbiens, R. del Villar, D. Jakelski

    "During the fall of 1993, a new Pill-based control strategy was installed in the B grinding circuit at the Kidd Creek Division of Falconbridge Ltd. The control strategy was first evaluated on a grindi

    Jan 1, 1994

  • CIM
    Assessment of Unpredictability in Hydraulic Fracturing for Stress Amelioration around Underground Excavations

    By J. P. Harrison, G. F. Gambino

    "This paper examines unpredictability in the parameters governing hydraulic fracturing (HF) as used in stress amelioration for underground excavations, with the aim of showing how this unpredictabilit

    Jan 1, 2015

  • CIM
    New Protection Gases with Low Global Warming Potential For Mg Alloy Melt

    By S. Kamado

    Development of new SF6 alternative cover gas with low global warming potential is strongly desired for melting and casting of magnesium alloys. We have tried to apply several kinds of HFC and HFE gase

    Jan 1, 2006

  • CIM
    Development of the Drumbo Mine: A new gypsum mine in Ontario

    By R. C. Hartviksen

    "The Drumbo Mine is a new gypsum mine located at exit No. 32 of Highway 401 between Woodstock and Kitchener, Ontario. The flat-lying 6-foot (1.8-metre) bed of gypsum is near the base of the Silurian S

    Jan 1, 1983

  • CIM
    Hydrometallurgical Processes for the Recovery of High Value Metals from Spent Li-Ion Batteries

    By R. Laucournet, E. Billy, M. Joulié

    Today Li-ion batteries are considered as one of the most attractive available energy storage solutions. However in order to overcome environmental, legislative and economic issues, the management of u

    Jan 1, 2014

  • CIM
    Midwest Joint Venture high-grade uranium mining – underground

    By H. K. Fredrickson

    "Midwest Joint Venture (MJV) owns a high-grade uranium deposit in northern Saskatchewan. The deposit is located too deep below surface to be mined economically by open pit methods, and as a consequenc

    Jan 1, 1992

  • CIM
    Comparison of Variogram Upscaling Approaches for Consistent Scale Modeling of Mineral Deposits

    By Miguel A. Cuba

    Resource models are generally constructed using data of different types and/or from different sources. A common issue is the consistency of scale in the information that often leads to a requirement t

    Oct 1, 2009

  • CIM
    Can behavioural science help the mining industry?

    By Al Holmes

    "In a recent survey of Canadian work values, 89% of the men surveyed and 97% of the women surveyed described the work in a mine as ""not at all auraetive"", Work in a mine, in fact, was rated by both

    Jan 1, 1980

  • CIM
    Network Communication Note to Assist Backhoe Operators and Dump Truck Drivers for Earthwork

    By Katsutoshi Saibara

    Network communication note is a cloud system for an earthwork project. It enables backhoe operators and dump truck drivers to monitor their own works in progress currently and performed up to the pres

    Aug 1, 2013

  • CIM
    Bucko Lake Deposit - Mineralogy of a High Tenor Mineralogy Nickel Deposit

    By Greg Collins

    BUCKO EXPLORATION HISTORY ??1964-Discovery ??1970?s -114 holes totaling 34,000 metres drilled -vertical shaft excavated to a depth of 300 metres (1000 Level) plus 800 metres of underground develop

    May 1, 2006

  • CIM
    La Route Vers L'objectif Zéro E.A.

    By J. Petit, P. Girard, A-M. Gilbert, D. Faucher

    L'annee 2000 a été une année stratégique et significative pour l' Aluminerie de Bécancour dans la réduction des gaz a effets de serre. L' équipe s' etait donne comme defi un jour d

    Jan 1, 2006

  • CIM
    Feasibility study standards

    By Larry B. Smith

    "Feasibility studies are the means by which mineral reserves are established prior to financing a project. However, guidelines are generally lacking for the content, data quality and accuracy of these

    Jan 1, 2003

  • CIM
    A Field Assessment of the SIUC Innovative Spray System for Continuous Miners

    By Yoginder P. Chugh

    Beginning in 2010, a scientifically-founded water spray system for continuous miners (CMs) has been in development at Southern Illinois University that significantly reduces respirable dust exposure f

    Aug 1, 2013

  • CIM
    An overview of R&D in narrow-vein mining at Université Laval

    By C. Bourgoin

    "The limited development and application of new technologies to narrow-vein mining is currently impeding progress in the industry to a point where productivity, working conditions and operating costs

    Jan 1, 1994

  • CIM
    Simulators for the Design, Optimization and Control of Gold Ore Processing Plants

    By L. R. P. de Andrade Lima, D. Hodouin

    The paper presents a survey of the possibilities of the simulation techniques for improving the design and operation of gold processing plants. The procedure to construct kinetic models that are used

    Jan 1, 2005