Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Resource/Reserve Estimation and Inventory: Can Reporting Definitions Substitute for Standards?

    By Marcel Vallée

    "Abstract - Traditionally, the emphasis in ore and reserve inventory has been to provide fairly simple definitions and presentations for reporting to shareholders and the investing public. The recent

    Jan 1, 1998

  • CIM
    Long-Term Performance of Dry Cover Systems for Reactive Mine Waste

    By David Christensen

    The long-term performance of dry covers is being examined in a research study funded by the International Network for Acid Prevention (INAP). The study was separated into two phases. The two main comp

    Nov 1, 2002

  • CIM
    Development of an Anti-Vibration Handle for Pneumatic Jackleg Rock Drills

    By Marcotte P.

    Introduction Pneumatic jackleg rock drills are commonly used in underground mining operations. These tools are known to expose their operators to hand-arm vibration levels in the order of 20-35 m/s2

    Feb 1, 2008

  • CIM
    Poly-Met Mill Liners for Autogenous and Semi Autogenous Grinding Mills

    By R. Brough

    "Over 25 years ago, SKEGA pioneered the use of rubber linings in grinding mills and rubber is today widely accepted and almost standard material chosen for Regrind - and Secondary Hills. There are, ho

    Jan 1, 1988

  • CIM
    The Development of Zr-Zn Alloy Compact Additions for Liquid Aluminum

    By K. Sun, S. A. Argyropoulos

    The assimilation and the exothermic behavior of Zn-Zr metallic powder compacts into molten aluminum was studied by measuring simultaneously the temperatures inside at the centerline of the compact, at

    Jan 1, 2008

  • CIM
    Aerial infrared photography used in evaluating peat bogs for Sphagnum moss

    By BARRY BANNATYNE

    Ombrotrophic Sphagnum peat bogs have a characteristic signature on both colour injrared film (750 nm to 3,000 nm response) and Daedalus injrared line-scanner images (thermal infrared 3 to 5 microns an

    Jan 1, 1984

  • CIM
    A Simplified Approach for Evaluating Concrete Deterioration in Vertical Shaft Lining

    By G. Q. Zhou, H. C. Liang, X. D. Zhao

    "This study describes the strain behavior in vertical shaft lining (VSL) embedded in thick soil deposits and its application in assessment of concrete deterioration. The observed strain in VSL continu

    Jan 1, 2019

  • CIM
    Laboratory simulation of a closed-circuit grind for a heterogeneous ore

    By J. A. Finch

    Samples of feed and product from a closed grinding circuit treating a heterogeneous lead-zinc ore were taken. The feed was subjected to laboratory batch grinding in a rod and ball mill with the object

    Jan 1, 1979

  • CIM
    The lighting evolution - A bright future for safety, efficiency and control

    By Bill Charbonneau

    Lumen, lm The measurement unit of light emitted by a light source 60W incandescent840 lumens 32W T8 linear fluorescent3200 lumens 54W T5HO linear fluorescent5000 lumens 400W metal halide24,000 lu

    Oct 1, 2010

  • CIM
    A flexible computerized maintenance program for a micro, mini or mainframe

    By Ken Musgrave

    "A program is described that helps managers and supervisors control maintenance more effectively. Work- order generation, preventive maintenance, repair parts inventory, planning and scheduling, repor

    Jan 1, 1986

  • CIM
    TSX Venture Exchange Corporate Finance Manual – Appendix 3F - Mining Standards Guidelines

    "This document establishes standards and guidelines for scientific and technical disclosure by Issuers listed on the TSX Venture Exchange on their mineral properties. It incorporates and expands upon

    Jan 1, 2003

  • CIM
    Optimization Of Refractory Lining Design And Installation Practice To Reduce Vessel Downtime And Maximize Performance Of Anode Refining Vessels

    By A. J. Rigby

    Anode vessels are often relined with refractory every one to two years and a typical reline time can take between 16-20 days. Modem refractory designs using dense, corrosion resistant brick applied di

    Jan 1, 2007

  • CIM
    Effects of dolomite addition on durability of coating materials for BOF

    By S. -H. Sohn, M. -K. Cho, G. -G. Hong

    In order to evaluate the properties of coating materials for BOF, the effects of dolomites (dolomite and light burned dolomite) addition on durability of coating materials were investigated. In all co

    Jan 1, 2004

  • CIM
    Hot Deformation Modeling of Functionally Graded Steels

    By Sadough vanini Ali

    Hot deformation behavior of functionally graded steel (FGS) was investigated via conducting hot compression tests at different temperatures and strain rates. Functionally graded steels consist of ferr

    Oct 1, 2011

  • CIM
    Leached Outcrops of Northern Manitoba

    By Oakley B. Gwillam

    The study of leached outcrops as an aid in determining the character of mineralization beneath the surface is in its infancy. Practically all the work on this subject up to the present has been applie

    Jan 1, 1930

  • CIM
    Heuristic Optimization of Scheduling Scenarios for Achieving Strategic Mine Planning Targets

    An optimization process is described that can be systematically applied by mine planners to produce life-of-mine schedules aligned with their strategic targets, while maximizing the net present value

    Aug 1, 2013

  • CIM
    Geometallurgy – The Key to Improving Your Mine Value Chain

    By B. D. Frater

    Geometallurgy or process mineralogy is an integrated part of the scoping, pre-feasibility and feasibility phases of a project as well as an existing operation. A well planned and executed geometallurg

    Jan 1, 2017

  • CIM
    Multi-Stage Biological Treatment System for Removal of Heavy Metal Contaminants

    By W. D. Gould, F. Goodazi, W. F. A. Duncan, A. G. Mattes

    A biological treatment system designed to passively remove high concentrations of metals from leachate collected from a landfill near a large integrated zinc lead smelter has been in operation intermi

    Jan 1, 2004

  • CIM
    High Selectivity for Cobalt/Magnesium Separation by Solvent Extraction in a Pilot Plant

    By M. E. Moraes Castanho de Almeida, A. Ribeiro Cotri

    Recovery of cobalt to produce high grade cobalt sulfate from cobalt concentrate by leaching and solvent extraction was investigated. The PLS typically contains Co 10g/l, Mg 2g/l, Fe < 10ppm, Mn < 200p

    Jan 1, 2014

  • CIM
    Crack Propagation in Thin Coatings Subjected to Contact Loading Using Dislocation Method

    By S. Rash Ahmadi

    Thin brittle coatings are deposited or developed on component surfaces for different reasons. In many practical applications the coatings are stressed by externally applied loads. Under such condition

    Oct 1, 2011