Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Underground Belt Conveyor System at the Sullivan Mine

    By F. M. Waldie

    THE 2,538-foot belt conveyor recently installed underground at the Sullivan mine hoists ore from the 3,350-foot level to the 3,900-foot or main haulage level, a vertical distance of 680 feet. The des

    Jan 1, 1945

  • CIM
    A Survey of Recycled Rare Earths Metallurgical Processing

    By C. D. Anderson, C. G. Anderson, P. R. Taylor

    "Rare Earths have become critical for our energy and materials driven society. While primary production must ramp up to fill growing demands, the recycle of these strategic elements must also be initi

    Jan 1, 2012

  • CIM
    Large Ring Gears ? A Topic of Concern

    By Robert M. Vadas

    Special considerations are described as they apply to the design of ring gears for high-power grinding mills. AGMA requirements, the importance of the supporting structure, material selection and rela

    Jan 1, 1978

  • CIM
    Tile use of stage curves in the design and operation of tailings impoundments

    By Jack A. Caldwell

    "This paper describes the nature of stage curves and the ways in which they have been used to study the construction sequencing of tailings impoundments. They provide a simple graphical method of repr

    Jan 1, 1983

  • CIM
    Process Dynamics of Grinding Circuits and the Use of Automatic Control

    By T. C. Crosby

    "Grinding has a marked effect on concentrator recovery and operating cost, and improved operation through automatic control can enhance plant performance. The correct application of automatic control

    Jan 1, 1967

  • CIM
    The Mechanical Aspects of Large Grinding Mills

    By C. A. Roloff

    Demands for increased grinding production, lower-grade are and limited capital have resulted in ever larger grinding mills, some as large as 36ft (/1 m) in diameter and 12,000 hp (8,950 kw). The resul

    Jan 1, 1979

  • CIM
    Structured Analysis ? An Important Tool for Understanding and Describing Complex Mining Systems

    By Mario A. Morin

    Mine design, planning and scheduling is a very complex, iterative process comprising several interrelated and interdependent activities. Understanding how this process works, identifying the critical

    May 1, 2002

  • CIM
    The Polaris process barge

    By James K. Gowans

    "Cominco Ltd's Polaris Mine, located on Little Cornwallis Island, Northwest Territories (latitude 75degrees 30') went into production in late 1981, becoming the world's most northerly b

    Jan 1, 1983

  • CIM
    Towards Formalizing Qualitative Operations Input into Mine Planning

    By T. G. Joseph, E. Lampard

    ABSTRACT: Surface mining operations must manage variability from within their operations as well as variability imposed upon them by external forces. A framework to manage both internal and external v

    Jan 1, 2011

  • CIM
    Performance Assessment of a Fiber Optic Methane Sensor Exposed to Coal Smoke

    By M. Li, T. H. Dubaniewicz, H. N. Dougherty

    "INTRODUCTION Underground mines have the risk of accumulation of gases if not ventilated properly or during and after emergency situations when ventilation controls become damaged or stop working. Com

    Jan 1, 2019

  • CIM
    Need for new Policies and new Tools in Mining Geophysics

    By P. R. Geoffroy

    Extensive and Intensive Prospecting As often pointed out, the search for new ore deposits may be carried on along two widely divergent lines. It may be either extensive or intensive. By extensiv

    Jan 1, 1950

  • CIM
    No. 6 Concentrator Operations at. Brunswick Mining and Smelting Corporation Limited

    By R. T. Erskine

    "The No. 6 orebody is located 6 miles from the main op.eration of Brunswick Mining and Smelting Corporation Limited and includes open-pit and primary gyratory crushing facilities. Ore is transferred b

    Jan 1, 1971

  • CIM
    Faulting at the Wright-Hargreaves Mine with Notes on Ground Movements

    By Harold Hopkins

    THE Wright-Hargreaves mine is one of a group of seven mines long active in the Kirkland Lake district, Ontario. Detailed geological reports and maps covering the area have been published by the Ontari

    Jan 1, 1940

  • CIM
    Implementation of an Advanced Thickener Underflow Density Control at Loulo Gold Mine, Mali

    By D. Sagara, V. G. Makhado

    "A model based control strategy was implemented at Loulo Gold Mine in Mali, to stabilise the thickener underflow stream density. This stream acts as the feed to the leaching circuit. pH control of the

    Jan 1, 2017

  • CIM
    Characteristics of Shrouded Supersonic Jets in Metallurgical Reactor Vessels

    By A. R. Naji Meidani, A. Cameron, A. Richardson, M. Isac, R. I. L. Guthrie

    The supersonic core of shrouded jets remain coherent over longer distances vs conventional supersonic jets. This phenomenon should allow for greater penetration of oxygen into slag/steel reactor syste

    Jan 1, 2004

  • CIM
    Aluminium Control In The Iron Purification Stage Of A Hydrometallurgical Zinc Circuit

    By I. Lackey

    In 2004, Zinifex Budel Zink commenced testing with the objective to increase the precipitation of aluminium in the iron purification stage of its hydrometallurgical zinc circuit, without the use of ex

    Jan 1, 2006

  • CIM
    Modeling of Rock Fracture Flow using the Lattice Boltzmann Method on Graphics Hardware

    By S. A. Briggs

    Bioremediation has been accepted as a treatment technique for groundwater contamination in subsurface soils and shows promise for contaminated fractured rock environments. Biological growth in fractur

    May 1, 2009

  • CIM
    Recycling of Nickel, Copper, Cobalt, and Vanadium

    By Clemens Kuhnert

    "Nickelhütte Aue GmbH is specialized in the recycling of waste materials containing non-ferrous metals. We treat nickel, copper, cobalt, vanadium, molybdenum and precious metal containing materials li

    Jan 1, 2017

  • CIM
    Potential problem analyses: A practical risk assessment technique for the mining industry

    By M. P. Davies

    "Risk, the product of probability and consequence, is an integral part of mining. Whether evaluating exploration priorities, determining property acquisition potential, reviewing the components of an

    Jan 1, 1997

  • CIM
    Zinc Ferrite Treatment Options to Increase the Zinc Recovery at Teck Cominco's Trail Operations

    By M. A. Nagle

    Various strategic projects were carried out in 2002 to increase the capacity of Teck Cominco's integrated zinc-lead smelter at the Trail operations site in British Columbia, Canada. The lead smel

    Jan 1, 2006