Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Erosion Behavior of Metal Nitride Coatings Fabricated by Physical Vapor Deposition

    By X. T. Zeng, X. Z. Ding, W. R. Chen, L. R. Zhao

    The effect of deposition defects in metal nitride coatings on erosion behavior is presented. AlCrN, AlTiSiN, TiSiN and TiSiN:MoS2 coatings were fabricated by reactive cathodic arc evaporation and unba

    Jan 1, 2006

  • CIM
    Development and Implementation of Pyrometallurgical Processing of Primary Gold Concentrate with High Stannum Content

    By A. Y. Senchenko, S. G. Rybkin, A. V. Aksenov

    In gravity processing of gold-containing ore the target produced concentrate which is high gold grade primary concentrate contains a significant amount of cassiterite (SnO2). The plant attempts aiming

    Jan 1, 2016

  • CIM
    Tire Maintenance at Scully Mine, Wabush

    By R. B. Anderson, N. J. Sherren

    The mining equipment at the Scully Mine, Wabush, consists of approximately twenty-five large haulage units, eight large dozer-loader applications and seventy other related pieces of service and mainte

    Jan 1, 1969

  • CIM
    Evaluation Of Elements Of Concern In The Jeb Tailings Management Facility Using Synchrotron Radiation Techniques

    By John R. Hayes, Kebbi A. Hughes, John Rowson, Peter E. R. Blanchard, Jeremiah C. Beam, Andrew P. Grosvenor, Arthur Situm

    Uranium ore bodies contain elements within mineral phases that need to be disposed of responsibly. Solid waste can be placed in a tailings management facility (TMF) to contain the waste elements and l

    Jan 1, 2020

  • CIM
    Overdrilling of Open-Pit Blast Holes

    By A. Galibois, H. Monette, J. L. Collins

    This paper deals with the problem of caving, which occurs in varying degrees in blast holes before loading. It is shown that the distribution of the amount of caving in materials may be described by a

    Jan 1, 1971

  • CIM
    Aging effects in 319 alloys

    By N. R. Andrade-Gonzalez

    The present work was performed on four alloys containing Al-6 2 wt pct Si-3 5 wt pet Cu, with magnesium in the range of 0.02-0 40 wt pct, and strontium in the range of 0-165 p p m Tensile bars were ca

    Jan 1, 2004

  • CIM
    Scale Field Tests and Visual Modelling to Evaluate a Curved Front Dipper Concept

    By N. Shi, T. G. Joseph

    ABSTRACT: A prototype test dipper (at 1/20th volume and a geometric operating scale of 2.85) was compared during field trials against a conventional dipper with the same tare weight using the same tes

    Jan 1, 2011

  • CIM
    Brisco Barite Mine

    By G. R. MANSON

    The Brisco Barite Mine lies 70 km south-southeast of Golden, British Columbia. Barile mineralization occurs in a northstriking brecciation zone within Ordovician-Silurian Beaver/ oot dolomites and qua

    Jan 1, 1984

  • CIM
    Integrated Underground Mining and Processing ? A Systems Approach

    By Malcolm Scoble

    Process Technologies Suitable for Application Underground Design Criteria - coarse particle technologies - compact, robust, flexible - waste products suitable for use as backfill Process technol

    May 1, 2004

  • CIM
    Points of View on the Rock-Burst Problem

    By R. G. K. Morrison

    As mines grow deeper, the problem of ground control becomes one of increasing importance. The literature on the subject has grown extensively in the past few years, but is still far from conclusive. D

    Jan 1, 1939

  • CIM
    Effect of Backfill Placement Method on Its Stability: A Dynamic Modelling Case Study

    By Muhammad Zaka Emad

    Cemented rockfill (CRF) is a mixture of rock aggregate and binder slurry. It is a stiff backfill, it is fast curing, its operation is simple, placement rate is reasonably high and no drainage is requi

    Jun 1, 2012

  • CIM
    Building on Canadian Capabilities for Space Resource Missions

    By John Ratti

    Building on Canadian Capabilities for Space Resource Missions: Space resource science and technology mission building blocks Canadian historical perspective Status and future pursuits It takes

    May 1, 2013

  • CIM
    Difficult Gold Gravity Separations an Update

    By J. Ling, J. Xiao, A. R. Laplante

    "The most challenging gold gravity separations occur when gangue has a high s.g., gold is fine, or a combination thereof This paper examines such separations, and evaluates the performance of a 3-in K

    Jan 1, 1998

  • CIM
    Whitehorse Mining Initiative and taxation

    By Robert B. Parsons

    "The Whitehorse Mining Initiative (WMI) brought together all of the key stakeholders in Canada's mining industry to develop a framework whereby the industry can meet the challenges that it faces

    Jan 1, 1994

  • CIM
    The measurement of radon emanation rates in a Canadian cut-and-fill uranium mine

    By J. W. M. Porritt, K. C. Cheng

    Knowledge of radon emanation rates from uranium-bearing rocks is essential to the design of mine ventilation systems for uranium mines. Measurements of equilibrium ratio between radon and its daughter

    Jan 1, 1981

  • CIM
    Surveying BIM in the Lebanese Construction Industry

    By Rita Awwad

    Building Information Modeling (BIM) has been gaining a significant edge in the construction industry over the last decade. BIM allows gathering all building information in one shared database that can

    Aug 1, 2013

  • CIM
    Adsorption of Hexyl Mercaptan on Sphalerite

    By R. F. Robertson

    "Adsorption isotherms of hexyl mercaptan vapour on synthetic sphalerite, zinc sulphide and zinc oxide were de-termined with a gravimetric McBain-Baker micro balance incorporated in the B.E.T. apparatu

    Jan 1, 1966

  • CIM
    Ceramic clays and bentonites of the Prairie Provinces

    By JOHN H. HUDSON

    Ceramic clays of the Prairie Provinces range in age from Lower Cretaceous to Pleistocene and Recent. Two significant ceramic clay horizons are the Paleocene Willo wbunch Member of the Ravenscrag Forma

    Jan 1, 1984

  • CIM
    Strength and Mechanism of Portland Cement Prepared from Stone Coal Vanadium Slag

    By P. Zhang, K. Liu, L. Ou

    "The strength and mechanism of Portland cement prepared from stone coal vanadium slag were studied in this paper. Initially, the slag was used as silicon raw materials to prepare clinker. By blending

    Jan 1, 2016

  • CIM
    Process Basis and Economics of Pipeline Systems

    By E. J. Wasp, T. L. Thompson, T. C. Aude

    The paper will deal with some of the more important technical aspects of slurry pipelines as they apply to the mineral field. In addition, the use of these technical concepts in arriving at realistic

    Jan 1, 1970