Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Process Improvements at Falconbridge Dominicana

    By D. Ortiz, J. R. Frias, E. D. Mast, J. J. Fañas

    Falconbridge Dominicana (Falcondo) has operated an integrated tpy nickel laterite mine and ferro-nickel processing plant since 1972 in the Dominican Republic. The operation includes mining, a processi

    Jan 1, 2005

  • CIM
    Options and Challenges in Processing Cobalt from Copper-Cobalt Ores

    By B. D. H. Knights, N. B. du Preez

    The recovery of the economy of the Democratic Republic of Congo has allowed for the rapid increase in production of copper from this region, while the increased price of cobalt continues to support th

    Jan 1, 2019

  • CIM
    Recycling Polymeric Materials for Slag /Carbon Interactions in EAF Steelmaking

    By \/eena Sahajwalla, Jonathan Dicker, Paul O'Kane, Cath Skidmore, James Dankwah, Magdalena Zaharia, Rita Khanna, David Knights, N Saha-Chaudhury, Somyote Kongkarat

    Due to the inherent limitations of current methods of disposal of end of life polymeric materials, avenues are researched towards developing alternative, environmentally friendly and economic recyclin

    Jan 1, 2011

  • CIM
    Autogenous grinding mills for diamond liberation

    By J. E. Danoczi

    ABSTRACT A diamond processing plant is being designed for the Star–Orion South diamond project in central Saskatchewan. Key to the plant is diamond liberation, which occurs in the comminution section

    Jan 1, 2013

  • CIM
    Separation of Arsenic and Recovery of Antimony and Tin from Silicate Slag in a Nonferrous Smelter

    By A. Iizuka

    This study was aimed at separating and recovering arsenic, antimony, and tin from refining byproducts generated in a nonferrous smelter. The target byproduct was a silicate slag containing the above e

    Jan 1, 2019

  • CIM
    Effect of Ammonium, Sodium and Potassium Sulphates and Chlorides in the Pressure Acid Leaching of Western Australian Nickel Laterite Ore

    By B. I. Whittington

    This paper examines the effect of cation type (i.e. NH4+, Na+ and K+) and anion type (i.e. SO42- and C1-) on the extraction of nickel during the pressure acid leaching of a Western Australian laterite

    Jan 1, 2004

  • CIM
    The Oxidation of Ferrous Sulfate Solutions By S(IV) and Dissolved Oxygen

    By E. Krause

    The oxidation of Fe(II) with S(IV) and oxygen can be used advantageously in leaching systems requiring both Fe(III) and sulfuric acid; e.g., heap leaching of sulfide-containing ores or concentrates. T

    Jan 1, 2006

  • CIM
    Pulp-Lifter flow Modeling Study in a Pilot Scale Mill and Application to Plant Scale Mills

    By Raj Rajamani

    In general, many past works examine mill load, mill power, shell lifter design etc with a view to improving the mill capacity. On the contrary, only a handful of papers have addressed the transport of

    Jan 1, 2012

  • CIM
    Metal Mine Ventilation (5a66f77a-e32a-4b69-828a-81ebc3b32b9e)

    By D. Harrington

    Ventilation of underground workings consists in establishment of such control of air currents that the underground workers may work in safety, with maximum comfort and efficiency, and without impairme

    Jan 1, 1933

  • CIM
    Underground Crusher Dust Control at Lake Shore Mine

    By O. E. Andrew

    THE object of this paper is to present a brief summary of the dust control system in use on the 3,825-foot level at the jaw crusher station, Lake Shore mine. During the years 1936 and 1937, dust surv

    Jan 1, 1941

  • CIM
    The Specogna Gold Deposit: A Late Tertiary, Low-sulfidation Epithermal Hot Spring Deposit, Graham Island, Queen Charlotte Islands, British Columbia, Canada

    By Richard J. Haslinger, C. Mark Rebagliati, James L. Oliver

    Abstract - Exploration at the Specogna gold deposit has identified a geological resource of 65.0 Mt grading 1.63 g/t Au, which equates to 3 million ounces of contained gold. This resource is hosted in

    Jan 1, 1998

  • CIM
    Development (Optimezation) of the Detour Lake Concentrator Flowsheet: Integration of the Results of Comminution and the Metallurgical Testwork Program

    By A. Allaire, J. Torrealba-Vargas, R. Welyhorsky

    Early testwork was carried out to select the plant process design criteria and flowsheet selection. Additional testwork was carried out during the feasibility study to support the optimization of the

    Jan 1, 2011

  • CIM
    Improving Energy Efficiency in Barrick Grinding Circuits (309a678f-c2fc-4f23-900a-4b50d1de7610)

    By Christian Brits, Bob Blain, Lloyd Buckingham, Juliu Stieger, Jean-Francoi Dupont

    Barrick Gold Corporation (Barrick) has undertaken innovative methods of evaluating and improving the performance of grinding mills in several of its operations around the world. The results have been

    Jan 1, 2012

  • CIM
    Certain Operating Phases in the Refining of Copper at the Ontario Refining Co., Ltd.

    By Frederic Benard

    THE Ontario Refining Company, Limited, wholly-owned subsidiary of The International Nickel Company of Canada, refines the entire blister copper output of the latter's Copper Cliff smelter. Prior

    Jan 1, 1938

  • CIM
    Global Acid Rock Drainage (GARD) Best Practices for AMD Control & Treatment

    By Jim Robertson

    Summary of Presentation ??What is the GARD Guide ??The Need for a GARD Guide ??Mining Industry?s Commitment to Solving ARD Problems ??The Ultimate Solution ?You ??The GARD Guide ?Scope ??The G

    May 1, 2009

  • CIM
    The Hydrogen Mine Introduction Initiative ? Objectives and Progress

    By Marc C. Bétournay

    Replacing diesel power in underground metal mining vehicles with available clean energy (e.g. hydrogen, lithium-ion batteries) is now a priority due to worker health issues, the increasing price of di

    Aug 1, 2013

  • CIM
    Kemess South Mine Closure and Reclamation

    By Georgia J. Lysay

    Kemess South Mine ended operations in March 2011. Final reclamation works began during operations in 2008 in anticipation of closure. The focus of reclamation during mine operations was on the inactiv

    May 1, 2011

  • CIM
    Geology of the QR gold deposit, Quesnel River area, British Columbia

    By P. E. Fox, R. S. Cameron

    "The QR gold deposit lies in the Cariboo plateau region of central British Columbia. The deposit was discovered in 1977 and since then a mineable reserve of 1.3 million tonnes grading 4.7 g/t Au has'

    Jan 1, 1995

  • CIM
    An in-Shovel Camera-based Technology for Automatic Rock Size Sensing and Analysis in Open Pit Mining

    By Shahram Tafazoli

    ABSTRACT: This article presents a novel technology for sensing the size of rocks after blasting in hard rock mines. Blast engineers require rock size statistics to carefully adjust the blasting parame

    Oct 1, 2009

  • CIM
    An in-Shovel Camera-based Technology for Automatic Rock Size Sensing and Analysis in Open Pit Mining

    By Shahram Tafazoli

    This article presents a novel technology for sensing the size of rocks after blasting in hard rock mines. Blast engineers require rock size statistics to carefully adjust the blasting parameters. The

    Oct 1, 2009