Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Sampling density and grade control

    By P. Groleau, O. Tavchandjian, D. Marcotte

    In open pit mining, each small mining unit (SMU) is selected for mill processing based on an estimate of its true grade. The estimation is usually done using analyses of cuttings from blast holes with

    Jan 1, 1998

  • CIM
    Advances in Drilling & Blasting Control at Barrick?s Pierina Mine

    By Will Callupe Arzapalo

    The success of the minimization of blast induced-damage at Barrick?s Pierina Mine in Peru is the result of an effective working relationship between Mine Operations and the Geotechnical Services Depar

    May 1, 2006

  • CIM
    Milling of Noranda Process Slags

    By P. W. Godbehere, B. W. Brooks

    "This paper deals with the milling of slags from the Noranda Continuous Process, in the Horne Concentrator at Noranda, Quebec. The milling of copper slags, although novel in Canada, has been practiced

    Jan 1, 1977

  • CIM
    Clayburn-Harbison Limited Operations in British Columbia

    By R. H. Beaton

    "About 1905, a plant was constructed at C1ayburn, in the Lower Fraser valley, 4'5 miles east of Vancouver, to process shales from Sumas mountain into heavy clay products. In time, mining operations we

    Jan 1, 1959

  • CIM
    Geostatistical resource estimation for the Poura narrow-vein gold deposit

    A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is nov

    Feb 1, 2004

  • CIM
    Chemical Additives for Improving the Wet Grinding of Ores

    By R. Samuels, R. Klimpel

    "IntroductionLaboratory and industrial grinding tests have shown that the process of size reduction of metal containing ores can be significantly influenced by chemicals added to the slurry being grou

    Jan 1, 1979

  • CIM
    Preparing a Long-Lasting Environmental Impact Statement

    By Glen A. White

    The level of impact and mitigating measures that are forecast in an environmental assessment (EA) for a new, or significantly modified, metallurgical processing facility or mine are taking on increasi

    May 1, 2004

  • CIM
    Geostatistical resource estimation for the Poura narrow-vein gold deposit (4178b3ee-8316-4d7e-a069-b76cea76f353)

    By P. K. Frempong, S. D. Butt

    "A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is no

    Jan 1, 2004

  • CIM
    An Expert System Supervisor of a Flotation Circuit

    By A. L. Mular, R. P. Edwards

    "The operation of flotation circuits is often regarded as a combination of art and science. Expert systems offer a method by which the art may be captured and supervisory control of flotation circuits

    Jan 1, 1991

  • CIM
    Milestones in the Mining Industry in Canada

    By John A. Allan

    Introduction There are times when meditation on the past is worth while. Too often does it happen that in the busy routine there appears t9 be little time for reflection, and little good or benefit t

    Jan 1, 1933

  • CIM
    Improving Machinery Reliability Through Condition Based Maintenance

    By Alan D. Akerman

    This paper describes the significant advantages and improvements in operational availability, reduced breakdowns, and overall cost reductions that can be achieved through the application of a Reliabil

    May 1, 2002

  • CIM
    Evaluation of the Tower Mill as Regrind Machine

    By J. M. Menacho, J. M. Reyes

    "Batch and continuous regrind tests were conducted in 3 kW and 15 kW tower mill units, respectively. Single particle size classes of a chilean copper sulphide concentrate were employed in the batch te

    Jan 1, 1989

  • CIM
    Performance Characteristics of an Improved Flotation Mechanism

    By George A. Lawrence, J. C. McHardy

    "Field operating experience with an improved flotation mechanism for handling various flotation applications is covered in this paper. Some aspects of designing flotation machines are also presented.

    Jan 1, 1985

  • CIM
    Development and Implementation of an Operating Concept and Training Program for the Start-Up of the Stanleigh Mill

    By H. Ewaschuk

    "INTRODUCTIONRio Algom's Stanleigh Mill in Elliot Lake began production in June of 1983. The highly instrumented mill treats uranium ore at an average rate of 3900 metric tons per day. To help ensure

    Jan 1, 1985

  • CIM
    Hydraulic Hoisting & Long Distance Pumping of Coal

    By R. E. McElvain

    "Hydraulic transportation of solids in suspension with water or other carriers, such as oil is becoming more practical as economic situations develop with respect to the railroads and other carriers.

    Jan 1, 1978

  • CIM
    Toppling failure — A proposed analytic solution

    By J. I. Mathis

    "The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was

    Jan 1, 2004

  • CIM
    Indicator mineral and till geochemical methods for kimberlite exploration in glaciated terrain (526cabe2-e08e-448c-950e-0f39e1fcecab)

    By M. B. McClenaghan

    "This paper summarizes diamond exploration techniques used in glaciated terrain, focussing on indicator mineral and geochemical methods applied to glacial sediments. Understanding the ice flow history

    Jan 1, 2002

  • CIM
    Geology and Ore Deposits of the Zeballos Area, British Columbia

    By John S. Stevenson

    ZEBALLOS is a relatively new mining camp. It is on the west coast of Vancouver island, approximately 195 nautical miles northwestward from Victoria. Previous to 1934, a small amount of placer gold had

    Jan 1, 1939

  • CIM
    Gold "Preg-Robbing" by Pyrite: Natural and Process Induced

    By Stephen L. Chryssoulis

    """Preg-robbing"" of gold by carbonaceous matter during the cyanidation of certain types of carbonaceous gold ores is well documented. Recent studies established that ""preg-robbing"" of gold is not l

    Jan 1, 1997

  • CIM
    Effects of Operating Parameters on Grinding Steel Consumption

    "INTRODUCTIONThe Kidd Creek Concentrator is located 28 kilometers east of the city of Timmins, Ontario. Two types of ore are treated; 'A' type, a copper-zinc-low silver ore producing copper and zinc c

    Jan 1, 1988