Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Loader Distributor Train - an Advanced System for High Speed Mucking of Hard Rock Tunnels

    By Luck D

    Current methods of mucking out small development tunnels are a major limitation to improved efficiency and high rates of advance. This is particularly true in the deep metalliferous mines of South

    Jan 1, 1986

  • AUSIMM
    The Requirements for Manufacture of Nuclear Fuel in Australia

    By Alder KF

    Nuclear power stations to be installed in Australia will be fuelled from Australian resources of raw materials. This will require the establishment of new manufacturing industries and the eventual ex

    Jan 1, 1970

  • AUSIMM
    Pretreatment Of Raw Materials For Pelletizing: Damp Grinding And Kneading Process

    Conventionally, a combined system consist- ing of a dry or wet pulverizer and kneading mac- hine is applied to the pretreatment of fine mat- erials for agglomeration, especially for pellet- izing. How

    Jan 1, 1974

  • AUSIMM
    Groundwater at the Underground Coal Gasification Site at Chinchilla, Australia

    By S Fidler

    Underground coal gasification (UCG) is a process by which coal is converted in situ to a combustible gas that can be used as a fuel or chemical feedstock. The process has been used in commercial-size

    Jan 1, 2003

  • AUSIMM
    The Many Uses of Rare-Earth Magnetic Separators for Heavy Mineral Sands Processing

    In the time since the first trials in the mid-1980s, the Rare-Earth Magnetic Separators (REMS) are presently (year 2001) found in many heavy mineral sands plants around the world. Both the roll and th

    Jan 1, 2001

  • AUSIMM
    Nephrite Deposits of Taiwan

    Taiwan is situated between Ryukyu and the Philippines with 35,960 sq. km of area, being slightly larger than Belgium It has roughly a spindle-shaped outline with a longitudinal axis extending in a r

    Jan 1, 1987

  • AUSIMM
    Environmental Assessment for the Golden Cross Mine Development, Waihi, New Zealand

    By R C. Owen, M A. Ward

    The paper describes the application of New Zealand's environmental impact assessment procedures to a proposed gold and silver mine in the North Island of New Zealand. The project is described and

    Jan 1, 1988

  • AUSIMM
    The Requirements for Manufacture of Nuclear Fuel in Australia (fd7f48f2-d0b2-4fe8-9e93-17623f195119)

    Nuclear power stations to be installed in Australia will be fuelled from Australian resources of raw materials.This will require the establishment of new manufacturing industries and the eventual expa

    Jan 1, 1971

  • AUSIMM
    Carrapateena Vent Rise Performance – Geotechnical Design and Calibration

    By G Balog, T Ormerod, D Sidea

    Carrapateena is a copper-gold sub level caving operation located in the Gawler Craton, South Australia. One of Australia’s largest undeveloped copper deposits, the project will be a 4.25 Mtpa undergro

    Mar 15, 2021

  • AUSIMM
    Assessing corrosion of reinforcement on a large scale

    By N Power, R Hassell, E Jones

    Wiluna Mining Corporation are progressively re-entering the old Wiluna underground mining complex. The existing underground was abandoned in 2013 by previous owners and left to flood with water levels

    Nov 29, 2022

  • AUSIMM
    Visual Aspects of the Landscape

    To carry out its responsibilities the SECV needs to manage the visual environment effectively. Every land oriented decision effects what we see and the value in pursuing visual excellence is supported

    Jan 1, 1992

  • AUSIMM
    Automatic search strategy for ROM stockpile recovery optimisation

    By M Wagner, H Assimi, F Neumann, C Garcia, B Koch

    Run-of-Mine (ROM) stockpiles are the inventory of valuable materials extracted from the mine. Depending on the customer requests, a selective addition of ore from stockyards should be selected at the

    Nov 10, 2020

  • AUSIMM
    Outside Auger Hollow Claw Tipped Mechanical Sampler for Coal

    By Z-Y Pi, B Zhang, S Wen

    "The paper introduces the structure and work processes of outside auger hollow claw tipped mechanical sampler for coal. Twenty sets of claw tipped sampler performance tests show that: The design of i

    Aug 21, 2012

  • AUSIMM
    Some Installation, Operational and Maintenance Aspects of Diesel Engine Power Plant, Gold Mines of Kalgoorlie LTD., W.A.

    This paper describes the oil engihe plant owned and operated by Gold Mines .of Kalgoorlie Limited, and gives some details of installation, operational, and maintenance experiences which have arisen du

    Jan 1, 1945

  • AUSIMM
    Project Feasibility Studies - A Necessary Step or the Best Opportunity to Add Value and Certainty?

    By J Borthwick, M Yusi, M Douge

    Feasibility studies form a vital and significant component of the project delivery cycle. They are at the heart of the valuation process. This paper focuses on variables which can affect a project and

    Jan 1, 2009

  • AUSIMM
    Traceability of native seed for mine rehabilitation

    By A Grant, H Thomas, C Clarke, B Fuller

    Native seed and plants are often a core input into the rehabilitation process of mine closure. Native plant establishment rate and performance is a function of many input elements including seed quali

    Aug 2, 2023

  • AUSIMM
    The Application Of Polymeric Floculants In Underground Backfill At The Zinc Corporation, Limited And New Broken Hill Consolidated Limited

    The introduction of cement into underground backfilling at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited mines to improve mining efficiencies gave rise to several major pro

    Jan 1, 1973

  • AUSIMM
    Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper Operations

    By G Chitumbura

    Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu

    Mar 21, 2011

  • AUSIMM
    Design Basis and Construction Experience for a Bolt and Shotcrete Lined Tunnel for the Wambo Rail Spur

    By I Chan

    The Wambo Rail Spur located near Singleton, New South Wales, Australia, runs for 14 km linking the Mt Thorley rail loop and running north-west alongside Jerrys Plain Road to the Wambo Coal Mine at War

    Jan 1, 2008

  • AUSIMM
    Liquidus Surfaces in a Part of the Systems ZnO-PbO-SiOn and ZnO-"FeO"-SiO2

    By Tozawa K, Nishimura T, Sasaki K

    Liquidus surfaces in a part of the systems ZnO-PbO-Si02 and ZnO-"FeO"-SiO 2 were constructed by the quenching method. The ex- periments were carried out in air in the system ZnO-PbO-Si02. In the pa

    Jan 1, 1980