Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Research and Development in the Micron Research (W. A.) Solvent Procedure for Gold Elution from CarbonBy Hinchliffe WD, Griffin A
The desorption of gold from activated carbon is promoted by adding organic solvents to aqueous cyanide solutions. At 65-80¦ the elution of gold is fast and is not affected by water quality. The Micron
Jan 1, 1984
-
Application of Numerical Image Analysis to Process Diagnosis and Physical Parameter Measurement in Mineral Processes ù Part I: Flotation Control Based on Froth Textural CharacteristicsBy P Pelletier, J Tessier, C Duchesne
This paper summarises research into the study of the control of flotation processes based on froth images. A review of the froth flotation operation background and the relevance and role of the froth
Jan 1, 2005
-
Ore Block Modelling and Structural Geology: Their IntergrationBy Hall C. E, Chrisholm J. M
Resource calculations for shear hosted deposits of any type are difficult regardless of which calculation technique is used. One of the main problems is the determination of the geometry of the minera
Jan 1, 1993
-
The Tarkwa ProjectGold Fields Ghana Ltd (GF Ghana) currently operates an underground mine at Tarkwa, in south--west Ghana. The mine was operated by Tarkwa Goldfields Limited, a wholly owned subsidiary of the State Gold
Jan 1, 1997
-
Development of Trials for Rehabilitation of a Bucket Wheel Excavator Spoil DumpBy Walton S, Wheeler D. J, Sargent D. M, Ting L. Y
Goonyella-Riverside mine is an open cut coal mine in Central Queensland. One component of the mining operations at this site is an uncompacted spoil dump some 50 m above the natural ground surface and
Jan 1, 1992
-
On the Effect of Dynamic Fracture Rocks on the BlastingThe impulsive loading tests under confining pressure were performed to investigate the dynamic fracture properties of rocks in a triaxial stress state. The apparatus in this study consists of the Sp
Jan 1, 1990
-
Statistical Analysis of Nickel Slag Cleaning at the Kalgoorlie Nickel SmelterBy Dickson T. J
Slag cleaning is an important part of the pyrometallurgical operations at the Kalgoorlie Nickel Smelter. It is a complex system with many streams of different phases and composition. Some of these s
Jan 1, 1991
-
Design and Construction of No. 2 Residue Dam at RoseberyBy West Coast Staff
Attention to the design of facilities for drainage, of both surface water and seepage, made it possible to attain, for a qam impounding residues from a concentrating mill, a more stable sand wall whic
Jan 1, 1958
-
Structure of the Roof at the End of Longwall Face and Its SupportTwo ends of a longwall face are not only concentrated locations of equipment, but also provide ventilation and access. The roof strata stability here has an important influence on mining coal and
Jan 1, 1986
-
Recovery of Precious Metals by CementationBy Armoo K, Tran T
Cementation has been widely used in several hydrometallurgical processes for recovering gold and silver from process liquors. The process is electrochemical in nature, in which gold and silver are
Jan 1, 1991
-
Seismic Extension of Volcanic ArcsWhile convergence of plates at a subduction zone produces shortening at the toe of the overriding plate, this deformation is localized to the frontal 100 km or so of the plate. There is increasing evi
Jan 1, 1990
-
Exploring the Effect of Blast Design on SAG Mill Throughput at KCGMBy Valery W, Morrell S, Loughlin P, O&apos
Traditionally, blasts in mining operations are designed to prepare the in situ rock mass for excavation and transport without much consideration being given to the downstream comminution processes.
Jan 1, 1998
-
Grade Control at Phar Lap and Haveluck Mines Meekatharra: Techniques, Successes and FailuresBy Payne P, Beirne W, Geldard D, O&apos
Whim Creek Consolidated N.L. has operated openpit mines at Meekatharra since 1980. Mining operations commenced with the Haveluck openpit and the Phar Lap openpit was started in 1 984. Grade control in
Jan 1, 1986
-
The Rawas Gold Project æSuccessfully Overcoming the ChallengesÆ -- The Task Facing a Junior in Indonesia from Exploration to ProductionBy Williams JK, Bolitho BC
Laverton Gold NL (Laverton) is the first junior Australian mining company to establish a viable mining operation in Indonesia. It successfully commissioned the Rawas plant in Sumatra this year with an
Jan 1, 1997
-
The Impact of Undergoing Coal Mining in FarmingThe proportion of coal production from underground operations in Queensland, is likely to increase in the future. A portion of this increase will come from mines working under farming areas. The d
Jan 1, 1987
-
Economics of Narrow Vein MiningDuring the past five years there has been a transformation in the operating costs which apply to narrow vein mining. Mechanised methods including sublevel uphole retreat and narrow vein cut and fill a
Jan 1, 1993
-
The Importance of the Bosh and Hearth in Influencing Blast Furnace Gas FlowThe physical phenomena which influence gas flow in the bosh and hearth of a blast furnace are discussed including the hold-up of slag as a mechanism which can result in a flooding condition. An equat
Jan 1, 1975
-
Petrography of Collie Coal from the Muja Sub-Basin, Western AustraliaPreliminary petrographic investigations of eight Upper Permian coal seams of the Muja sub-basin, Collie Coalfield, reveal that the coal is high in inertinite and relatively low in vitrinite and ex
Jan 1, 1982
-
Selection of Variables in Air Pressure Dewatering of Mineral SlurriesThis paper describes the effects of physical variables in dewatering of mineral slurries with air as the filtrate displacing medium. Using a mathematical model with material related constants measu
Jan 1, 1989
-
Estimation of High Grade Copper Slope Grades in QTS North, Cobar Mines, Cobar NSWBy Schofield N. A
The cross-sectional method of stope grade estimation at Cobar Mines has consistently had several shoneomings, me most imponant of which being mat stope grade is significantly overestimated in the high
Jan 1, 1993