Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Geology and Grade Control at Bannockburn Gold Mine, Leonora District, Western Australia

    By Jankowski P

    The Bannockburn gold deposit is located 67 km north-west of Leonora in a poorly exposed part of the Norseman-Wiluna belt of Western Australia. The deposit consists of narrow, complexly shaped orebodie

    Jan 1, 1993

  • AUSIMM
    Advances in Geophysical Exploration Techniques - Australia and Overseas

    Not so many years ago the reason for an inadequate result from a geophysical survey was insufficient data or poor quality data. In many instances such as gravity, magnetic and radiometric surveys, b

    Jan 1, 1997

  • AUSIMM
    The Use of Computer Graphics and Virtual Reality to Model FSV Operations

    By McClarnon D. J

    This paper aims to provide the reader with an insight into the field of computer graphics and Virtual Reality (VR), and show how both have been applied to the general area of Free Steered Vehicle (F

    Jan 1, 1995

  • AUSIMM
    Sustainable Water Use at Olympic Dam

    By P Trotta

    The majority of water to the Olympic Dam mine and the nearby townships of Roxby Downs and Andamooka is supplied from the Great Artesian Basin (GAB). There are no permanent local water sources availabl

    Jan 1, 2009

  • AUSIMM
    Waste Rock Pile Construction to Lower Closure and Relinquishment Costs

    By J R. Taylor, J A. Muchan, S M. Pape, B S. Davis

    Acid and metalliferous drainage (AMD) is routinely derived from waste rock, tailings, pit wall rock, underground mine voids, heap leach pads, ore stockpiles, concentrate stockpiles and even slag piles

    Jun 28, 2016

  • AUSIMM
    Ramp Up of the Pasminco Century Concentrator to 500 000 tpa Zinc Metal Production in Concentrate

    By M Spagnolo, M Ashley, D, L Reemeyer

    PasmincoÆs Century Concentrator in North West Queensland commenced operations in November 1999. The nameplate production capacity of 500 000 tpa of zinc metal production in concentrate was achieved in

    Jan 1, 2003

  • AUSIMM
    Effects of FeO/SiO2 ratio and optical basicity on viscosity and melt structure of FeO–SiO2–Al2O3–CaO–MgO–Cr2O3 melts

    By C Samuelsson, Q Shu, A Lennartsson, F Gyakwaa, A Andersson, J Isaksson

    The physico-chemical property, viscosity, is essential for pyrometallurgical processes and influences the settling rate of valuable metal droplets in slag, affecting the metal recovery. The copper sla

    Jun 19, 2024

  • AUSIMM
    Life-of-mine Development and Production Scheduling Optimisation for Sublevel Cave Operations

    By G Chitombo, A Perryman, A D. Campbell, J White, B Hollis

    This paper describes the development and implementation of an optimisation tool developed as part of the Mass Mining Technology (MMT) Project. The tool, known as the SLC Schedule Optimiser, is capable

    May 9, 2016

  • AUSIMM
    The importance and abundance of lichens and mosses on the restored landscape in the nickel-copper city of Sudbury, Ontario, Canada

    By S Wainio, P J. Beckett, T Miller

    Lichens are a symbiosis of fungi and algae. Air borne elements and gases are absorbed very efficiently over the entire surface of the lichen, because they have no protective structures such as a waxy

    Aug 2, 2023

  • AUSIMM
    The Multi-Element Functionality of the Whittle Optimiser - A Different Approach in the Evaluation of Iron Ore Deposits

    In general the iron ore industry has been slow to adopt the Whittle Pit optimising software in the evaluation of iron ore deposits. The reasons for this are two-fold:the iron ore industry has develope

    Jan 1, 2007

  • AUSIMM
    Putting the ‘GEO’ back in front of GEOmetallurgy: importance of early implementation of quantitative mineral system characterisation, classification and modelling

    By W Potma, C Brauhart, S Halley, S Urbisinov, A Scogings

    Truly integrated, quantitative, 3D GEOmetallurgical (or mineral system) characterisation, classification and 3D modelling should provide a cradle to grave unifying link across the exploration and mini

    Nov 21, 2018

  • AUSIMM
    Operational Rock Mechanics at the Cannington Exploration Decline

    By McGuckin P. H, Logan A. S

    The BHP Minerals' Cannington silver-lead-zinc deposit is located approximately 190 km south-east of Mount Isa. The deposit, is hosted by Proterozoic rocks beneath a thin cover of younger sedime

    Jan 1, 1995

  • AUSIMM
    Unlocking resource confidence in coal through use of conditional simulation

    By B Haase, R Saha

    Conditional simulation (CS) has been extensively used in metal industry to assess uncertainty of geo metallurgical variables to build robust distributions around grade tonnages across different time h

    Mar 22, 2022

  • AUSIMM
    Challenging the Norms Time Usage Model – Mobile Underground Mining Equipment

    By R Ballantyne, M Adams

    Time Usage Models, used as a basis for calculating performance indicators for mobile mining equipment, have developed from very simple to very sophisticated models. This development has paralleled the

    Mar 15, 2021

  • AUSIMM
    Mine Ventilation Model Validation - ItÆs not Rocket Science!

    By J Rowland

    "Ventilation models are invaluable tools for both prediction of routine daily ventilation changesin an operating mine to circuit performance expectations at the mine in 20 yearsÆ time. Arguably ventil

    Jun 1, 2012

  • AUSIMM
    Recent advances in understanding phosphorus in oxygen steelmaking

    By G Brooks

    The control of phosphorus in steelmaking is one of the famous challenges of pyrometallurgy. It is well established that highly basic slags, the presence of FeO in the slag and lower temperatures (less

    Jun 19, 2024

  • AUSIMM
    A Phased Approach to Test Programs to Meet Feasibility Study Requirements

    By E Williams

    The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re

    Oct 5, 2011

  • AUSIMM
    A Cut-Off of Liberated and Selected Ore Minerals Optimisation Based on the Geometallurgy Concept

    By G Turner-Saad

    An improvement to cut-off grade optimisation theory based on geometallurgy has been completed. The improvement fundamentally consisted of taking into account mineralogical and textural characteristics

    Sep 5, 2011

  • AUSIMM
    The Benefits of Automated Sampling and Analysis of Iron Ore

    By R Shaw, R Williamson

    Global iron ore demand, sparked by ChinaÆs rapid industrialisation and emergence as the worldÆs newest steel market, has seen iron ore groups investing heavily in production capacity as well as infras

    Jan 1, 2007

  • AUSIMM
    The Load-Bearing Process of Fully Coupled Rock Bolts

    The paper focuses on how rock bolts are loaded in different rock masses, as well as in pullout tests. Three analytical models for rock bolts are presented in brief, one for bolts in continuously defor

    Jan 1, 2000