Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Strategic thinking about long-term ‘above ground’ orebody complexity using scenariosBy T Craske, J Sykes, T C. McCuaig, M Jessell, A Trench
The prevalent strategic approach in the mining industry is one of planning. However, it is widely recognised that planning does not work in complex and uncertain situations (Mintzberg, 1994), such as
Nov 21, 2018
-
Trajectory Design and Economic Analysis of Asteroid Mining Missions to Asteroid 2014 EK24By S Dorrington, J Olsen, N Kinkaid
Several studies have been conducted on the economic analysis of mining near-Earth asteroids for resources for use in Earth orbit. While these studies use detailed economic figures of merit, they often
Nov 4, 2015
-
Risk assessment tool for mines using diesel-powered mobile equipmentBy A Reid, A W. Musk, O Jones
In this paper, the authors attempt to bridge the gap that currently exists between the duty-of-care responsibilities of underground mining industry personnel, and the multifaceted health challenges fa
Oct 16, 2017
-
Bored Reinforced Piles for Raise Bore Support – Four Case Studies and Guidelines Developed from Lessons LearntBy P Marlow
Raiseboring is an attractive method of constructing shafts, being safe, fast and comparatively cheap. But this means back-reaming through weathered ground. However in the gravels and weathered near-su
Mar 21, 2011
-
Five Years With Paste Fill ù Experience at Henty Gold MineBy T J. Grandfield
Paste fill has been used successfully at Henty Gold Mine for the past five years. It has allowed 100 per cent extraction of the orebody, stabilised poor ground and enabled wide sections and offsets to
Jan 1, 2002
-
Assessing the volume change behaviour of red mud through laboratory and field testingBy D J. Williams, A Shokouhi, A Naderian
Extracting alumina from bauxite involves the production of fine-grained waste known as red mud. The highly alkaline red mud is usually neutralised by applying sea water, thickened to between 25% and 3
Jul 23, 2018
-
Predictive Maintenance Using Simulation and Machine LearningBy R Marchant, D Willingham
"Predictive maintenance (also known as PHM or equipment ‘health monitoring’) refers to the intelligent monitoring of equipment to avoid future equipment failures. In contrast to conventional preventiv
Oct 10, 2016
-
Recommended Design Methods and Serviceability Limits for Permanent Rock BoltsBy D J Maconochie
The use of rock bolts as permanent support has been prohibited by client specifications in several recent large tunnel projects in Australia. The justification for this appears to lie in concerns with
Mar 8, 2011
-
Issues Confronting Major Expansions and New DevelopmentsThe mining industry has expanded significantly in the Pacific Region over the past two decades through a mix of new developments and brownfields expansions of existing operations. Despite this overall
Jan 1, 2004
-
A Predictive Model for Beneficial Use of Rehabilitated Mine Tailings for Grazing Cattle after Mine ClosureBy B N. Noller, J C. Ng, S L. Bruce
Mining activities can result in the transfer of harmful elements, including arsenic and lead, into the environment. In Australia, one of the potential future uses of rehabilitated mine land is to stoc
Jul 16, 2014
-
The Resistance of Cyclone Underflow Material to Flow LiquefactionBy J Boshoff, D Reid
It has been recognised worldwide that the liquefaction risk of unconstrained tailings stacks or cyclone underflow embankments requires careful consideration. The stability of a tailings deposit where
Jul 27, 2015
-
The Role of Chlorine in the Passivation of Preg Robbing Gold OresChlorination of organic matter by direct injection of chlorine gas or hypochlorite has been investigated metallurgically worldwide with little understanding of the basic chemistry of the passivation
Jan 1, 1991
-
Mine geology standardisation – providing the foundation to consistent short-term geometallurgical product predictions in a complex multimine and supply chain environmentBy B L. Sommerville
"The theme of this International Mining Geology Conference is ‘Setting New Standards’. Rio Tinto’s iron ore operations include a complex integrated supply system to deliver ore from 15 mine operations
Sep 20, 2017
-
Bentonite and Fuller's Earth Deposits of New South Wales: II. Bonding PropertiesBy Giles C. N, Loughnan F. C
Bentonites and active earths from N.S.W., previously analysed with respect to occurrence, mineralogy and physical properties have been evaluated for use as bonding agents in quartzose moulding sands i
Jan 1, 1959
-
Simulating Integrated Hydrology in Mining Catchments from Planning to ClosureBy S Szylkarski, D N. Graham
In mining, water management is an operational necessity, requiring planning and detailed engineering, as well as risk assessment. Yet, the hydrology of streams and aquifers typically extends well beyo
Jun 28, 2016
-
Modelling Open Pit and Underground Production Scheduling in ConcertBy B King
A large number of mineral deposits contain regions in which it is economically beneficial to extract ore both via open pit and underground mining techniques. Current industry practice lacks an effecti
Nov 24, 2014
-
In situ observation of phase transition of silico-ferrite of calcium and aluminiumBy H Kim, J Park, J Lee
Silico-ferrite of calcium and aluminium (SFCA) is a bonding phase in the iron ore sinter. The phase transition upon melting of SFCA was investigated with Differential Scanning Calorimetry and Confocal
Jun 19, 2024
-
Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)By C E. Woolley, H Jebaliya, J Foster
The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May
Jun 22, 2022
-
Solving a Large Stochastic Integer Programming Model for Production Scheduling at a Gold Mine with Multiple Processing Streams and Uncertain GeologyBy M de Freitas Silva
One of the main steps during the decision-making process of long-term mine planning is the definition of the optimal sequence of extraction, which usually is synonymous with maximising the discounted
Nov 24, 2014
-
Stabilising and filling the Beaconsfield Hart ShaftBy A Turner, P Hills, D Johnson
Underground mining for gold began in Beaconsfield in 1877 and development of the Tasmania Mine saw the sinking of multiple shafts, including the Hart Shaft over the ensuing 35 years. The mine closed i
Nov 30, 2018