Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Productive Partnership – Controlling Vibration and Maintaining Critical Electricity SupplyBy M Nagarajan
Orica Mining Services (Orica) in partnership with Coal and Allied’s Hunter Valley Operations (HVO) has developed a risk management process to maximise mining efficiency whilst controlling vibration an
Nov 8, 2011
-
Hydrogeological characteristics of co‐disposed tailings and coarse rejects from coal processingBy S Fityus, K Koosmen, J Simmons
The purpose of this paper is to therefore investigate the hydrogeological characteristics of tailings, coarse and mixed rejects from coal processing to enable better understanding of the potential for
Jul 1, 2021
-
Earth Pressure Balanced Tunnelling in a Dense Urban Environment, C917ABy G Jones
The Singapore Land Transport Authority (LTA) has been procuring the expansion of their underground mass rapid transit rail network at a prodigious rate since the first line opened in 1987. Four lines
Sep 17, 2014
-
Shear strength of compacted clay liner at McArthur River MineBy Y Xu, J Hacker, D J. Williams
Shear strength parameters of compacted clay liners are needed to analyse the stability of mine waste dumps containing compacted clay liners as sealing layers for potentially acid forming waste rock. A
Jul 23, 2018
-
Maximising Payable Gold in Base MetalBreakwater Resources Ltd is a Canadian base metals producer with Cu-Pb-Zn operations in Canada, Honduras, and Chile. Two of its operations contain economical gold levels which are recovered in both gr
Aug 1, 2010
-
Development and Implementation of the CaveCAD Ground Support Module for Cost and Safety Improvements in Block Cave MinesBy S Talu, E Savage, P Sturm, A van As
It is estimated that substandard ground support installations and elements cost the Rio Tinto Copper Group millions of dollars between 2000 and 2014. These issues have also created significant safety
May 9, 2016
-
A methodology for assessing stope design modifying factors for the Olympic Dam MineBy S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant
The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order
Mar 15, 2021
-
Comparison of heat, noise and ore handling capacity of battery-electric versus diesel LHDBy C McGuire
As mobile equipment electrification in underground mining continues to gain popularity, control ofheat and humidity in the workplace is becoming a key driver in sizing of ventilation and mine aircooli
Oct 12, 2022
-
Geometallurgy Data Management – A Significant ConsiderationBy V Liebezeit
Data management is a significant, but perhaps unrecognised, consideration for any organisation embarking on a geometallurgy program. While resource geologists are accustomed to dealing with thousands
Sep 5, 2011
-
Diamond drilling at Efemçukuru gold mine, Turkey – a case study on the benefits of timely and cost-effective drilling to short-term planningBy M Ozkayhan, N Arslan
"The Efemçukuru underground mine in western Turkey is an intermediate sulfidation, epithermal gold deposit. The bulk of the mineral resources and all of the mineral reserves lie within the Kestanebele
Sep 20, 2017
-
The Use of High Resolution Geophysical Technologies to Map the Base of Ore at BHP Billiton Æs Yandi Channel Iron DepositBy G Hall
BHP BillitonÆs (BHPB) Yandi ore deposit is a channel iron deposit (CID) in the Pilbara district of WA. The ore is predominantly a goethite-hematite pisolite and overlays a clay at the base of the depo
Jan 1, 2002
-
Mt Wright – geotechnical learnings from a sub level shrinkBy P Wilson
The Mt. Wright Underground Mine is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. The establishment
Nov 30, 2018
-
Channel and Detrital Iron Deposits of the Flinders Mines Pilbara Iron OreBy A E. Petts
Record iron ore prices and a renaissance of infrastructure in the Pilbara have Flinders Mines poised to move from explorer/developer to an iron ore producer. The potential of the company’s Pilbara Iro
Jul 11, 2011
-
Water Reform, Tradeability and Understanding the Value of Water for Large-Scale Resource ProjectsBy C Fenton
The mining industry is a relatively minor user of water, which has historically been largely soured from private schemes. Frequently mines are often located in areas with limited available water resou
Jan 1, 2003
-
Who is Responsible for Grade? – An Evaluation of the Value Chain at Mt Magnet Gold Project, Western AustraliaBy A Weeks, W J. Shaw, A Kuk
Grade control is a process that requires the interaction between many components of the mining operation and successful grade control is only realised through good data, robust systems, and a well-tra
Aug 18, 2014
-
Strategic short-term geotechnical designBy K T. Mandisodza, T J. Cartledge
The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d
Jun 22, 2022
-
Recent Concepts for the Extended Use of Draglines in Deeper Stripping ApplicationsBy Aspinall T. O
Draglines have found wide application in strip mining coal seams down to 60m depth. A research Project funded through NERDDC has been underway during the past two years investigating the application
Jan 1, 1989
-
The Protection of Surface Ventilation Fan Installations from Underground ExplosionsBy R Bourcier, T Rafferty
Following an underground coal mine explosion, it is important that ventilation is quickly restored to ventilate the mine and affect a mine rescue. To achieve this, surface ventilation fans must be sui
Jul 1, 2013
-
The Drilling and Evaluation of an Exploratory Oil WellBy Hammett PHJ
Oil Exploration Companies are primarily interested in how much oil or gas is present in the rocks in an area in which an exploratory well is drilled. The solution of this problem requires a combined
Jan 1, 1964
-
Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley OperationsBy S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans
A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success
Mar 15, 2021