Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Investigation of Mixing and Rolling Drum Performance at Port Kembla’s Sinter Machine Through Full-Scale Sampling and Laboratory Scale Experiments

    By D Maldonado

    BlueScope Steel’s Port Kembla sinter machine underwent a major upgrade during mid-2009. The mixing and rolling drum (MRD) was thoroughly cleaned during the upgrade. Space factor measurements taken in

    Jul 11, 2011

  • AUSIMM
    Mechanised, wireless development charging – Orica’s and Epiroc’s Avatel™ charging solution

    By B Taylor

    Although the underground mining environment is arguably safer now than at any time in history, as underground mining operations across the globe increase in-depth, magnitude, and complexity, protectin

    Mar 29, 2023

  • AUSIMM
    Mine-to-Mill Optimisation ù Research and Practice

    Mining companies around the world are seeking methods to coordinate operations between the mine and the concentrator to achieve an overall improvement in enterprise performance. In several instances v

    Jan 1, 2000

  • AUSIMM
    Influence of iron ore chemistry and mineralogy on sticking and breakage of pellets inside shaft furnace

    By M I. Pownceby, A Guiraud, S Purohit

    Sticking and breakage of iron ore pellets during high temperature reduction can result in several operational challenges during shaft furnace ironmaking. With the shift to H2-based DRI processes and d

    Sep 18, 2023

  • AUSIMM
    Development of a small mines/exploration industry in Papua New Guinea

    Papua New Guinea is geologically prospective for large, medium and small mineral discoveries. All profitable developments to date have been very large mines but for every large mine there should be ma

    Jan 1, 1994

  • AUSIMM
    Iron Ore Holdings Ltd – Case Study of the Environmental Approval Challenges for an Emerging Junior

    By H Fletcher

    Iron Ore Holdings Ltd (IOH) is an emerging junior iron ore company that is actively developing projects in the Central and Western Pilbara region of Western Australia. IOH commissioned URS Australia P

    Jul 11, 2011

  • AUSIMM
    Chirano Gold Mine Expansion – A Case Study

    By S Ellis

    In January 2008 Chirano Gold Mines Limited committed to expansion of the Chirano Gold Project from its existing design capacity of 2 Mtpa ROM ore to a new design value of 3.5 Mtpa. In addition to incr

    Aug 8, 2011

  • AUSIMM
    Optimum embankment design for a tailings dam

    By A Fyans, B Ghahreman-Nejad

    This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran

    Jul 23, 2018

  • AUSIMM
    Mapping and Prioritising Rehabilitation of Abandoned Mines in Australia

    By A M. Lechner, V Glenn, M Edraki, D R. Mulligan, C Unger

    With more than 50 000 recorded abandoned mines in Australia, effective management strategies are needed to prioritise and manage health, safety, environmental and socio-economic risks and opportunitie

    Jul 10, 2012

  • AUSIMM
    No assumptions, no surprises

    By G Deans, M Longbottom

    OZ Minerals’ Carrapateena mine is one of Australia’s newest ‘greenfield’ mining deposits. It will be a 4.25 Mtpa sub level cave underground operation, with an estimated mine life of 20 years. The inte

    Jul 1, 2021

  • AUSIMM
    Can We Stop a Black Swan Breeding? Advances in Bowties and Critical Control Management

    By M Andrew, H Reynolds, R Mills

    As the global mining industry continues to grapple with ‘black swans’ (high consequence / low frequency events) for health, safety and environmental losses, the focus is shifting from risk assessment

    Jun 22, 2016

  • AUSIMM
    Three Decades of Gold Production at the Newmont Tanami Operations

    By A Cranley, A Giblett, S Thacker

    The Newmont Tanami Operations are located in the Northern Territory, approximately 550 km north-west of Alice Springs. The Granites process plant commenced operations in 1986 as a 300?000 t/a ball mil

    Sep 1, 2014

  • AUSIMM
    The Geology of the Wilber Deposit, Andy Well Gold Project, Murchison District, Western Australia

    By T Wellman, G Sternadt, R Hingston

    The 335 000 oz Wilber Deposit is located within the Meekatharra-Wydgee Archaean greenstone belt in the Murchison District of Western Australia. The deposit comprises high-grade gold mineralisation hos

    Aug 18, 2014

  • AUSIMM
    A Large-Scale Unconfined Compressive Strength Test for Determination of Rock Mass Parameters in Tunnel Design

    By A Smith

    Rock masses usually exhibit scale dependent mechanical properties primarily due to presence of discontinuities and their inhomogeneous nature. One of the essential preconditions for selection of appro

    Mar 8, 2011

  • AUSIMM
    Chromite in Beach Sands from Norrie's Head and Stradbroke Island

    By Baker G

    Chromite was recorded among the rare minerals in the natural beach sand concentrates on the coast of Northern New South Wales by Whitworth(l) in 1931, and the commercial production of zircon and rutil

    Jan 1, 1948

  • AUSIMM
    Nova-Bollinger unfolding versus DA estimate

    By P M. Hetherington, M P. Murphy, K E. Crook, F Pym

    Resource characterisation is critical for informed decisions in both strategic and operational space. The sources of information for resource characterisation are limited by: direct measurement of res

    Mar 22, 2022

  • AUSIMM
    Development of an acQuire Based Geotechnical Data Management System

    By V Pere

    A geotechnical data management system has been developed to manage drillhole and mapping data generated from in house and consultant administered field programs. This system comprises a data collectio

    Aug 22, 2011

  • AUSIMM
    Mill Modelling Using an Extensible Station-Based Framework

    By E A. Gunn, J Zhou

    In this paper a project to develop a joint optimisation/simulation model for production planning in a mine-mill complex is presented. The system involves a mill receiving ore from a number of differen

    Sep 26, 2011

  • AUSIMM
    Environmental Risk Assessment System for Typical Staple Industrial Solid Wastes

    By X Sun, L B. Zhou, H Yi, X Tang, P Ning

    The rapid industrialisation in China has consumed large amounts of various industrial raw materials, which has left behind large quantities of industrial solid wastes produced from the processes of mi

    Jul 10, 2012

  • AUSIMM
    The Development and Operation of a Continuous Tapping Lead Blast Furnace at Port Pirie

    On the 17th November, 1964, a new No., 2 lead blast furnace was blown in at Port Pirie. The furnace departed from previous designs by incorporating a centrally located continuous tapper for both l

    Jan 1, 1975