Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Three-Dimensional Geometallurgical Data Integration for Predicting Concentrate Quality and Tailings Composition in a Massive Sulfide Deposit

    By R Knight

    The spatial variability of geometallurgical characteristics in a mineral deposit can have significant impact on financial and mine planning, mineral processing, concentrate quality and tailings compos

    Sep 5, 2011

  • AUSIMM
    Sustainability in Mining Engineering - Strategies Through Education and Research

    By A J. Gunson

    The Norman B Keevil Institute of Mining Engineering, or the Department of Mining Engineering (the Department), at CanadaÆs University of British Columbia (UBC) is addressing the integration of sustain

    Jan 1, 2009

  • AUSIMM
    Prognostic models for electroslag remelting process and slag engineering

    By D Stepanenko, G Stovpchenko, L Lisova, D Togobitskaya, L Medovar

    Classical electroslag remelting of consumable electrodes is a drop-by-drop melt feeding through a slag layer into a renewing molten metal bath, slowly solidifying into a homogeneous, dense, defectfree

    Aug 21, 2024

  • AUSIMM
    Cathode Zinc Morphology and Effects of Changed Conditions in Electrowinning Cells

    By Ault A. R

    The recent modernisation program at the Risdon electrolytic zinc smelter of Pasminco Metals - EZ (PMEZ) inyolved significant changes to the composition of cell electrolytes. The most significant wer

    Jan 1, 1993

  • AUSIMM
    An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine

    By M Kent, D Elder, J Woodward, R Edwards, B Catto

    At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine

    Sep 20, 2017

  • AUSIMM
    How Much Do We Need to Drill?

    By C Taylor, E Retz

    Sequential Gaussian conditional simulation of wide-spaced exploration data has been completed in order to optimise a drilling grid at Fortescue’s Eliwana deposit. The aim of this drill grid is to impr

    Jul 13, 2015

  • AUSIMM
    Rockburst Prediction

    Rockbursts, as they occur in South African deep level gold mines, have a lot in common with natural earthquakes. Both violently release seismic energy and cause damage to underground and surface s

    Jan 1, 1986

  • AUSIMM
    Minimising Coal Edge Losses in Dragline Blasting Operations

    By Yang RL, Bailey ML

    During overburden blasting operations in dragline pits, coal edge losses along the lowwall edge of the new pit are often experienced. In tonnage terms, losses can be significant. With the thick seams

    Jan 1, 1988

  • AUSIMM
    Metallurgical test work – between a rock and a hard place

    By K Fiedler, A Newell, P D. Munro

    Test work is the foundation upon which the success of projects and subsequent operations is laid, reflected in Professor Arthur Taggart’s pithy observation: ‘Make your mistakes on the small scale and

    Aug 29, 2018

  • AUSIMM
    Goodbye from the Argyle diamond deposit – insights from deep mining of the world’s largest diamond deposit

    By C B. Smith, G L. Boxer, S W. Moss, A L. Jaques, V Lorenz, M J. Rayner

    The Ernest Henry Iron Oxide Copper Gold deposit is hosted in a large dilation between two moderately dipping shear zones found in the footwall and hanging wall of the deposit. These shears are control

    Mar 22, 2022

  • AUSIMM
    High Energy Bulk Explosives and Mine to Mill Focus – the Mt Rawdon Story

    By D Morton, G Wallace

    "Evolution Mining is the sole owner of the Mt Rawdon open cut operation, located 75 km south-west of Bundaberg in Queensland, Australia (Figure 1). It is a massive, volcanically hosted, low-grade gold

    Nov 15, 2016

  • AUSIMM
    Site Investigation and Design for Melbourne’s New Metro

    By H Asche

    The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper

    Mar 8, 2011

  • AUSIMM
    Fluid-Dynamic Aspects in Blast Furnace with Gas Injection into the Stack

    By Quintiliani G, Giordano V

    A research field of interest and a topical subject with the aim to reduce a considerable amount of coke in ironmaking is the injection into blast furnace stack of hot reducing gas combined with use o

    Jan 1, 1975

  • AUSIMM
    Fluorine Removal From Ok Tedi Copper/Gold Concentrates

    By J W. Glatthaar, M Mavotoi

    The occurrence of fluorine in the copper/gold concentrates produced by Ok Tedi Mining Limited has provided a series of challenges to metallurgists since 1988. Although fluorine is distributed througho

    Jan 1, 2003

  • AUSIMM
    Advanced Technology for Setting Out of Blastholes and Measurement while Drilling

    By D Xiong, G Xu, L Yao, F Wang, Y Duan

    The goal of this project has been to digitise and use drill parameter data from rotary drilling (measurement while drilling; MWD) for a more effective planning of the blasting process in surface mines

    Aug 24, 2015

  • AUSIMM
    Improving Excavation Efficiency at the St Helena Tunnel Using Best Practice Drill and Blast Techniques

    By D Miller, M Dowling, R Domotor

    "This paper is focused on blasting activities undertaken as part of the Pacific Highway Upgrade – Tintenbar to Ewingsdale – project (T2E). This is a ‘priority 1’ Pacific Highway road construction proj

    Sep 17, 2014

  • AUSIMM
    Modelling Geometallurgical Variability - A Case Study in Managing Risk

    By S Khosrowshahi, A Weeks, W J. Shaw

    "To provide an indication of expected performance of the mine and mill, feasibility studies should include an assessment of the expected day-to-day variability in process plant feed. Attempts to do th

    Sep 29, 2013

  • AUSIMM
    Improvement of the copper flash smelting furnace (FSF) and the slag cleaning furnace (SCF) process by advice-based control of silica and coke addition

    By A Specht, A Müller, V Montenegro, S Winkler, E Klaffenbach, A Schmidt

    In the process of primary copper smelting in flash smelting furnace (FSF), the ratio of iron to silica (Fe/SiO2 mass ratio) primarily determines the slag viscosity and magnetite formation. Viscous sla

    Aug 21, 2024

  • AUSIMM
    Metallurgical Performance of Outotec’s e500 TankCell® at the Kevitsa Cu-Ni-PGE Concentrator

    By B Murphy, T Mattsson, R Crosbie, T Maksimainen

    "An Outotec e500 TankCell, with 500 m³ of actual flotation volume, was commissioned at the Kevitsa Cu-Ni-PGE concentrator in northern Finland during 2014. This flotation cell was implemented at t

    Oct 10, 2016

  • AUSIMM
    Technical and Environmental Problems Related to Dewatering the Proposed Ohinewai Opencast Lignite Mine, New Zealand

    By Wharton P, Voigt R

    In order to do the discharge estimation better, it is valuable to find out appropriate formulas for estimating discharge in various pits, based on accumulating data, summarizing discharge patterns

    Jan 1, 1988