Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Open Stoping with Associated Caving at Mount LyellUnderground mining of the ore below the West Lyell open cut commenced in 1972 with the 10 Series stopes above rail haulage level. The third lift of stoping (30 Series) com- menced this year, and acce
Jan 1, 1982
-
An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and StructuresBy L Cain, C Every, S Mirlatifi, J Ashley
This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor
Sep 17, 2014
-
Reliability Centered Maintenance for Mining EquipmentBy Granholm S
The current emphasis within the mining industry to reduce the cost of production has stimulated interest in the field of maintenance and operational reliability of capital intensive mining equipue
Jan 1, 1988
-
De-bottlenecking Iron Ore Transportation from Mine to PlantBy T Tan, C P. Holmes, C E. Hartford
Transportation of iron ore from the mine to the plant is critical to business success. Ore from the mine may have to be transported across states, countries and even continents to get to the processin
Jul 13, 2015
-
Explosion Parameters of Selected N.S.W. CoalsA laboratory investigation was carried out to obtain data on the explosive character- istics of selected coals mined in New South Wales. Seven coal seams were sampled and the volatile matter conten
Jan 1, 1981
-
Vibration energy harvesting for self-powered sensors at mine sitesBy H Zhang, M Karimi, M Hassan, S Saydam, B Li
With the prevalence of Mine Internet of Things (MIoT), different types of sensors have been widely deployed in mine sites for environmental monitoring and operational management. Currently, sensors in
Sep 1, 2024
-
Remodelling the Purnama Deposit – An Interpretation Case Study from G-Resources Martabe Project, IndonesiaBy A N. Kusnanto, D Sims, L Henim, S Crispin, J Hertrijana
The high sulfidation Purnama Au-Ag deposit located on the Indonesian island of Sumatra entered production in mid-2012 following a two-year program of construction and development. Discovered in 1997 f
Aug 18, 2014
-
The impact of rip lines on erosion at the Ranger Mine SiteBy M J. Saynor, J B. C Lowry
The Ranger Uranium Mine is located in the wet-dry monsoonal tropics approximately 250 km east of Darwin in the Northern Territory of Australia (Figure 1). Mining of open-cut ore bodies commenced in 19
Jul 25, 2018
-
Planning for the Future – Development of Beneficial End Use from a Quarry Pit Lake, Victoria, AustraliaBy C D. McCullough, M Gerner
Rarely do opportunities arise allowing closure of a mine site to be planned as a key beneficial land use asset within a new urban growth area; particularly so well prior to cessation of mining.Pit lak
Jul 16, 2014
-
Pipeline ManagementBy A G. L Pratt, J R. Grant
Mining companies face the ongoing challenge of sustaining and growing production. This paper outlines business investment concepts to grow reliable returns on investment from a portfolio of choices by
Jan 1, 2006
-
Professional Training for the 21st CenturyThis opportunity to present a few thoughts on the question of professional education and training comes at a most appropriate time. In Britain, a great deal of energy is being expended in this, so
Jan 1, 1986
-
Analysing reduced conveying capability of the orepass systems in Malmberget mineBy T Wettainen, G Shekhar, M Stromsten, B Skawina
The aim of a transportation system in an underground mine is to move the rock masses from one location to another in the most preferable manner by minimising the long and short-term operational costs.
Mar 15, 2021
-
Geophysical blasthole samplingBy C Simpson, J Market
The process of sampling blasthole cones utilising personnel to manually shovel material into sample bags is a long-standing industry accepted process. However, this method has several drawbacks, inclu
Nov 8, 2021
-
Properties of rock blastingEvery text book for blasting in Japan says that Hauser's law can be applied for practice. But recently it came true that there was no historical record about him and no actual datum of his own
Jan 1, 1990
-
Investigations on Fume Losses at the Sulphide Corporation's Works at Cockle Creek, N.S.W.The paper continues an account, begun in a previous paper, of experimental work carried out by the author whilst a member of the metallurgical staff at the Cockle Creek Works. The general method of th
Jan 1, 1925
-
Strategic and Tactical Geometallurgy – a Systematic Process to Add and Sustain Resource ValueBy N McKay, J Vann, W Ware, P Hodkiewicz, C Morley
"Geometallurgy is now recognised within the mining industry as an approach that can both maximise value and reduce the risks associated with resource development. The process of spatial ore variabilit
Jun 15, 2016
-
The Application of Measurement and Modelling of Sulfidic Coal Wastes at Pacific Coal's Kestrel Mine for Use in Development of a Closure PlanBy T A. Short, P L. Brown
Kestrel Mine co-disposes around 1.5 Mt of fine (2SO4/t and to date around 9 Mt has been deposited. The mine plans to co-dispose of approximately 39 Mt of material, creating a dump with a maximum heigh
Jan 1, 2003
-
The Mabilo Copper-gold-iron Deposit – A New Skarn Discovery in the PhilippinesBy G Maude, R Ayres, R N McLean, N A. Reynolds
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Mabilo copper-gold-magnetite skarn deposit is located in southern Luzon in the Paracale
Mar 18, 2015
-
Foresight Project - Minerals and Mining Sector Strategy: Vision for 2010By R G. Barker, A B. Christie
Minerals are necessary for providing almost everything we take for granted in our daily lives including food, shelter, and supplies of energy and water. Minerals are therefore essential for the mainte
Jan 1, 1998
-
A Comparison of Two Methods for Calculating the Constants K and Alpha in a Broken OreBy R Minnitt
Two methods of calibrating the parameters K and Alpha for use in Gy’s formula for the fundamental sampling error were investigated. Approximately 480 kg of broken ore from Harmony’s Target gold mine i
Jul 29, 2014