Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Remediation of Wall Failure at Kalgoorlie Consolidated Gold Mines’ Golden Pike Cut-back 2016

    By J Darbritz

    "This paper details the events leading up to a slope failure that occurred at Kalgoorlie Consolidated Gold Mines (KCGM) and the remediation method executed using rope access specialists.n January 2016

    Nov 15, 2016

  • AUSIMM
    Upgrading the Gravity Circuit at Marvel Loch

    By W Newton, J Price

    This paper outlines the design, justification and performance of a gravity circuit upgrade at the Marvel Loch treatment plant. The design of the upgrade was simple but effective. The key components of

    Jan 1, 2000

  • AUSIMM
    Creating Value and Improving Environmental Performance by the Recovery of Valuable Products from Tailings from the Athabasca Oil Sands in Alberta, Canada

    Creating Value and Improving Environmental Performance by the Recovery of Valuable Products from Tailings from the Athabasca Oil Sands in Alberta, Canada

    Sep 13, 2010

  • AUSIMM
    Acid Rock Drainage Prevention Using Inert Gas Mixture Technology

    By H Barrie, L Ameglio

    "Current methods for acid rock drainage (ARD) mitigation revolve around insulation of the waste from oxygen in the atmosphere with water and dry (soils and liners) covers. Both are of limited effectiv

    Jul 27, 2015

  • AUSIMM
    Grey River Gold Dredge Project (741941c7-6f5a-4b3a-ab98-8729f3fd3abc)

    Grey River Gold Mining Ltd commenced dredging alluvial flats in the Grey River Valley in 1989.Previous drilling indicated over 100 million cubic metres of gravels with some 90% of the gold in the bott

    Jan 1, 1990

  • AUSIMM
    Longitudinal and Torsional Displacements of Winding Ropes

    Hoisting ropes are constructed of wires and strands positioned helically around the axis. This helical positioning causes that, in the rope loaded at the end with the weight Q, the longitudinal dis

    Jan 1, 1995

  • AUSIMM
    Improving coal quality estimations using geostatistics and auxiliary variables

    By P Dowd, R Jeuken, C Xu

    In Australian coalmines there are a number of coal quality parameters that are measured by analysing samples from boreholes. The data points are used to generate spatial models of these parameters, ty

    Sep 20, 2017

  • AUSIMM
    Investigations on Lead Roasting at the Sulphide Corporation's Works at Cockle Creek, N.S.W.

    THE paper is principally eoncerncd with experimental work carried out the author whilst a number of the metallurgical staff at the Cockle Creek works. The metallurgical has been discussed sufficiently

    Jan 1, 1924

  • AUSIMM
    Elaine Dorothy Cu-Au (REE-U) Skarn Deposit

    By P Sha

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Elaine Dorothy Cu-Au (REE-U) skarn deposit in the Mt Isa Inlier, Queensland, Australia

    Mar 18, 2015

  • AUSIMM
    Unlock potential opportunities through unexplored aspects of Grade Engineering

    By P Revell, G Wilkie, P Walters, L Keeney, F Faramarzi

    Grade Engineering® is a value-driven strategy aiming to maximise benefits by exploiting intrinsic grade variability of ore deposits. It utilises a multitude of separation techniques to remove low grad

    Nov 10, 2020

  • AUSIMM
    The Development of Models in Minerals Processing

    By I Cameron

    Simulation is increasingly being used to analyse mineral processing operations and explore efficiency options. Engineers that use simulation are rightly concerned with the quality and applicability of

    Jan 1, 1998

  • AUSIMM
    Truck Haulage Developments in the 80's

    A brief history of the significant haulage truck feature changes and the factors that influenced those changes during the 60's and 70's provide a basis for forecasting the changes that ca

    Jan 1, 1982

  • AUSIMM
    Evaluation of Absorbents as a Means to Control the Influence of Heavy Metal Ions on the Flotation of a Complex Sulfide Ore

    By R F. Sandenbergh

    Due to environmental considerations, mineral processing plants are increasingly recycling water to decrease the impacts of wastewater on environment and the depletion of fresh water resources. Industr

    Jan 1, 2005

  • AUSIMM
    Determining the Deportment of Minor and Trace Elements in Base Metal Concentrates, with an Example from Broken Hill

    By F Radke, P A. Tilyard

    Determination of the mineralogical location (deportment) of minor and trace elements (including credit and penalty elements) in base metal concentrates can indicate whether further processing is likel

    Jan 1, 1998

  • AUSIMM
    Monitoring of the Performance of a Crushed Waste/Classified Tailings Backfill for Shaft Pillar Pre-Extraction in the South Deep Section, Western Areas Gold Mine (277410f0-6562-47cc-84ec-f0b4e2938751)

    By James JV, Petho SZ

    The South Deep surface shaft system is being sunk to a final depth of 2750 in below surface and on completion will be the deepest single drop haft in the world. The shafts will intersect the target

    Jan 1, 1998

  • AUSIMM
    The Use of Evaluation Surfaces to Assist in the Determination of Mine Design Criteria

    One of the problems with mining projects is the setting of the design criteria that will best match the requirements. Normally this is expressed in economic terms but can be other factors. With massiv

    Jan 1, 2000

  • AUSIMM
    Recent Iron Making Topics in Japan

    By N Takamatsu

    The environments surrounding the iron and steel industry have changed greatly in recent years. Reported in this paper are the technologies adopted by the Japanese iron and steel industry to fititself

    Jul 11, 2011

  • AUSIMM
    Probablistic Analysis of Risk in Mining Projects - As Easy as 123

    By Dorricott M. G, McAllister J

    This paper is concerned with the application of a probabilistic approach to the risk assessment of mining projects.In current practice, sensitivity analysis is the most commonly used deterministic app

    Jan 1, 1992

  • AUSIMM
    Radiometric Calipers for Borehole Logging

    By Wylie A. W, Jarrett R. G

    Two versions of a radiometric-type caliper for measuring borehole diameter are described. One, based on the bow-spring principle, is suitable for percussion (exploration) drill holes. The other, which

    Jan 1, 1976

  • AUSIMM
    Recent improvements in the milling circuit at Tropicana mine

    By G R. Ballantyne, B Putland, I Lovatt, M Di Trento

    The Tropicana Gold Mine, owned by AngloGold Ashanti Australia Ltd (70% owned and managed) and Independence Group NL (30%) is located 330 kilometres east-northeast of Kalgoorlie, Australia, in the newl

    Sep 11, 2017