Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Fluxing Requirements for Copper Smelting SlagSilica and limestone fluxing levels in copper smelting slags were studied. Copper concentrates with flux additions were smelted to matte (55.5 per cent Cu) and slag in a pilot scale submerged combusti
Jan 1, 1985
-
Mineralogical Evaluation of PGE Behaviour in Fe-Ni-S and Cu-Ni-S Mattes and Fayalite Slag: Geological ImplicationsBy Selischop F, Tredoux M
The distribution of platinum-group elements (pGEs) has been investigated in matte and slag samples from Waterval Smelter (Rustenburg Platinum Mines). The study showed that a strong preference of PGEs
Jan 1, 1994
-
New Backfill Binder and Method (269bf2ac-7892-4b0f-a5d0-bcfbbe6cee8f)By Grossi M, Baiden G
This paper describes a new mine backfill method based on a newly invented binder with several years of test results from laboratory and on- site applications. The new binder has several advantages ov
Jan 1, 1998
-
Co-Disposal of Coal Mine Tailings and Coarse RejectBy Kuganathan V
The processing of black coal in Australia segregates waste in the form of coarse reject and fine tailings. The coarse reject is relatively easy to handle, while the tailings can be problematic. Conven
Jan 1, 1992
-
The Geomorphology of the Channel Iron Deposit in Bungaroo Valley - The Formation of an Irregular Basal Topography and its Impacts on Resource RecoveryBy L Terrusi
The Bungaroo Valley hosts a concealed Tertiary channel iron deposit (CID) along a 17 km stretch of its length. Bungaroo Valley is approximately 0.5 km wide upstream at its easternmost extent, and 3.5
Jan 1, 2007
-
Finding Long-Term Outback Water SolutionsBy N Power, A D. Costar
There has been significant growth in mining and energy exploration in South Australia, which has identified new major potential opportunities. This sector generates significant economic value to the s
Nov 26, 2013
-
Monitoring and Control of Sulphur Dioxide Emissions from the ER&S Copper SmelterThe Electrolytic Refining and Smelting Company of Australia Limited (ER&S) operates a copper smelting and refining plant and is situated close to the heart of the highly industrialised area of Por
Jan 1, 1984
-
Use of Paste for Tailings Disposal (b5c201be-4c25-4c8e-a498-2a2e4672d3d4)By Shillabeer J
Paste backfill has been adopted by many underground mines in North America and a growing number elsewhere. Paste offers a number of advantages. This paper suggests wider applications of paste techno
Jan 1, 1998
-
San Vicenter Zinc-Lead Rhythmite Deposit, Peru: A Mississippi Tejada Rospihloisi, Krouse H.B.By Rospigliosi RT, Krouse HR
The San Vicente stratabound zinc-lead rhythmite deposit, Peru, is hosted in carbonates of the Late Triassic - Early Jurassic Pucara Group. These strata were deposited in a large, shallow water, carbon
Jan 1, 1990
-
Blast Furnace AerodynamicsBy Petersen V, Potke W, Polthier K
The paper reviews some of the aerodynamic factors in the blast furnace process and outlines the areas requiring further study. Detailed discussion is given to the pressure drop in both the dry and th
Jan 1, 1975
-
Mine Development Optimisation – An Evolutionary ProcessBy J Kovacs
Underground development drill and blast practices have generally remained unchanged for decades. Historically, development optimisation has focused mainly on the application of perimeter control produ
Mar 24, 2014
-
Blast Design Considerations for In-Situ Retorting of Oil ShaleBy Paine GG
The in-situ retorting of shallow oil shale deposits is an attractive alternative to the material handling problems of conventional open pit mining techniques, which involve removing overburden, fragme
Jan 1, 1985
-
Expert Control at Boddington Gold MineBy Green S, McKernan, Skrypniuk
In November 1996, Boddington Gold Mine (BGM) began the implementation of an expert system. The objective of the expert system was to improve plant efficiency by developing an `operator best practice
Jan 1, 1997
-
General Aspects of Legislative Control and Safety in Tunneling and Allied OperationsThis paper outlines the manner in which legislative control for tunnelling and allied operations has evolved, detailing Victorian experience. It examines the concept of mine managers as it relates
Jan 1, 1981
-
Heap Leaching at Camel Creek MineBy Menne D. M, Ladyman R
Camel Creek Mine operated by Lynch Mining Pty Ltd is located 65 km west of inghain and 160 kin north west of Townsville in North Queensland. (Figure 1). The Camel Creek gold mineralisation was disco
Jan 1, 1994
-
Initial Testing of the Fastflot Process at Pasminco Mining - Broken HillBy Stephenson D. B, Burgess J, Burgess F. L, Marshall S. H
A new high intensity flotation process 'FASTFLOT' is explained and its theoretical advantages compared with other flotation systems are discussed. The results of initial FASTFLOT testing o
Jan 1, 1994
-
Environmental Auditing as a Driver for Continuous Improvement in Environmental Performance (ede55e7e-c054-4fc6-ae90-dd762e66d692)Continuous improvement in environmental management assists in the achievement of sustainability goals for the mining and processing of minerals. The use of regular internal environmental audits (score
Jan 1, 2004
-
Continued Observations of Rock Mass Behaviour in Response to Stoping at the Tasmania Mine, Beaconsfield, TasmaniaBy P B. Hills, R J. Walton
Narrow vein tabular orebodies are prone to mining induced seismicity. The Tasmania Mine is a complex example of a seismically active tabular orebody, where the contrasting material properties of the h
Mar 26, 2012
-
Chlorine Based Flooded Pit Leaching of Oxide Gold DepositsThe capacity of chlorine based solutions to rapidly and effectively dissolve coarse gold in oxide ores is well established. The inherent advantages of chlorine are high dissolution rates (10 - 100 tim
Jan 1, 1992
-
Non-Ideal Shock Energy Factor versus Powder Factor for Open Pit Blast Design – ANFO and Chemically-Sensitised EmulsionsBy K G. Fleetwood
This paper proposes an approach to determine the influence of non-ideal detonation characteristics related to the charge diameter, explosive type and confinement conditions on the available shock ener
Nov 8, 2011