Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Corrosion behaviour of ferrite and aluminate refractories in cryolitealuminium melts

    By M A. Rhamdhani, R Z. Mukhlis

    Removing the ledge formation in the Hall-Heroult cell during the electrolysis process may significantly reduce the energy requirement of the aluminium production process. In the absence of the ledge,

    Aug 21, 2024

  • AUSIMM
    Advanced Mill Relining - A Key Operational Control (Not Simply a 'Must Do' Maintenance Function)

    RME has a vision for a new grinding plant operational paradigm made possible by RMEÆs fast, safe Mill Relining System. Some new liner designs can degrade SAG mill performance because of mill volume lo

    Jan 1, 2007

  • AUSIMM
    Paper No. 185. Presidential Address. Statistics And Economics.

    GENTLEMEN, I have to thank you very much for the honour you have conferred upon me by electing me President of the Institute for this year. On behalf of resident members, I have to offer the visitors

    Jan 1, 1911

  • AUSIMM
    Integration of Mine Planning with Groundwater Modelling to Optimise Mine Closure Plans at the Marillana Creek (Yandi) Mine

    By K Rozlapa, P Waters, H Middlemis

    A major challenge for closure planning at mining operations below the water table is evaporation from final void pit lakes and concentration of salts, which can impact on downstream groundwater (and s

    Jan 1, 2006

  • AUSIMM
    Philex Gold Philippines, Inc's Bulawan Mine - The Philippines Largest Primary Gold Producer

    By Anievas JB, Sevillano AC

    This paper describes the acquisition, exploration, development, initial operation and subsequent financing of the Bulawan mine by means of a listing on the Toronto Stock Exchange of a subsidiary of th

    Jan 1, 1997

  • AUSIMM
    Understanding Mineralisation Controls – A Case Study of the Chesney Deposit

    By J Channell, G Phillips

    "The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai

    Aug 18, 2014

  • AUSIMM
    Northside Storage Tunnel Project

    By R J. Cuttler

    In January 1998 Sydney Water Corporation formed an Alliance with construction contractor Transfield, and engineering consultants Connell Wagner and Montgomery Watson, to design and construct the North

    Jan 1, 1999

  • AUSIMM
    Mine Pit Slope Geotechnical Design

    Mine pit slopes in the Pacific Rim are a geotechnical challenge because of the complex geology in which they are developed. Mines are currently being fast-tracked to meet the increase in commodity pri

    Jan 1, 2006

  • AUSIMM
    Sublevel Cave Drop Down Strategy at Perseverance Mine, Leinster Nickel Operations

    By P A. Jenkins, I W. O Jones

    WMC has mined the Perseverance disseminated orebody exclusively by SLC (sublevel cave) methods. Deteriorating ground conditions in the vicinity of an orebody inflection forced a re-evaluation of futur

    Jan 1, 2000

  • AUSIMM
    Modelling Mine Sustainability - Indicators Based on a Comprehensible Framework

    By A Lyon

    The minerals industry, as many other industries, has a wealth of indicators and a thriving æindustryÆ in their development, measurement and reporting. It is natural for this to occur for a new endeavo

    Jan 1, 2009

  • AUSIMM
    Gold Rank Indicators - Exploration to Acquisition

    By Robinson T

    The paper describes a spreadsheet system that enables selection of projects and companies that meet the user's corporate exploration and/or acquisition philosophy. A regularly maintained commer

    Jan 1, 1988

  • AUSIMM
    Controls on Disseminated Gold Mineralisation at Fosterville, Victoria, Australia

    The Fosterville Goldfield has a modest past production (0.3 Moz), but is now emerging as a significant goldfield (2.6 Moz resources, including 1.1 Moz reserves) with implications for exploration withi

    Jan 1, 2005

  • AUSIMM
    Challenges in achieving zero harm – lessons from past incidents in mining

    By K M. Cook, D Clark

    Fatality prevention and zero harm are key focus areas for resource companies. However, they remain an ongoing challenge for high hazard industries, including the mining sector. As one example the late

    Apr 16, 2024

  • AUSIMM
    Brisbane Airport Link Project – Design and Construction of the 26 m Span Kedron Caverns: Comparing Monitoring Data with the Design

    By I Coombes, M Trim, Y Sun, M McRae, A Spiegl, H Lagger, A Amon, P Barraclough, M Villeneuve

    The Brisbane Airport Link Project (AirportlinkM7) includes the design and construction of more than 12.5 km of tunnels, with the Kedron interchange including four ramp tunnels that intersect with main

    Sep 17, 2014

  • AUSIMM
    Learning from and managing a significant saprolite instability

    By M Bouare, C Holland, K N’Diaye

    Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant

    Jun 22, 2022

  • AUSIMM
    How innovation trumps isolation, one mine at a time

    By J Pearce, R Ramanathan

    hortly after the World Health Organization declared COVID-19 a pandemic, the words ‘social distancing’ entered the global lexicon. The effects on the public of social distancing, lockdowns and travel

    Jun 22, 2022

  • AUSIMM
    An Approach to the Development of Technological Flowsheets for Raw Material Beneficiation Using New Flotation Reagent Systems

    By Dendyuk TV

    The possible use of combined (flotation/magnetic separation and magnetic separation/flotation) technologies involving the new flotation reagent systems for upgrading the iron ore concentrates, low g

    Jan 1, 1993

  • AUSIMM
    Description of New Plant at South Mine, Broken Hill

    By Cunningham J. C

    JUST prior to the war the Broken Hill South Ltd: raised, on the average, 6628 tons of ore per week, all of which was crushed and treated in the 4-section gravity mill and the slime flotation plant, fo

    Jan 1, 1921

  • AUSIMM
    Environment Effluent Control at Roseberry

    Comparatively recent Tasmanian legisla tion established a series of rigid control standards for environmental protection just as ma spectacular expansion of the mining industry was nearing completi

    Jan 1, 1977

  • AUSIMM
    Cut-off Grade-based Sublevel Stope Mine Optimisation – Introduction and Evaluation of an Optimisation Approach and Method for Grade Risk Quantification

    By M W. N Buxton, M T. Bootsma, J Benndorf, C Alford

    Research in the field of cut-off grade optimisation has shown a relationship between cut-off grade, project life and net present value (NPV). Lane’s theory demonstrates that cut-off grades can be opti

    Nov 24, 2014